This is a Performance Work Statement (PWS) for the procurement of F-5 spare parts in support of Foreign Military Sales (FMS) customers. The contractor shall procure or manufacture parts listed in Attachment 1, which include a windshield panel, generator, gyroscope displacement, stability augmentation system components, landing gear control, control unit generator, and cable assembly for fire detection, among others. Parts may be sourced from original equipment manufacturers (OEMs), approved existing manufacturers, qualified distributors, or aftermarket/surplus suppliers, with government preference for OEM or existing manufacturer sources. The contractor must comply with current drawing revisions, specifications, Engineering Orders, and Engineering Change Orders from the Joint Engineering Data Management Information Control System (JEDMICS). For newly manufactured parts, the contractor is responsible for conducting First Article Inspection/Testing (FAI/FAT) per AS9100 standards within 30 calendar days of completion, with results submitted to the United States Government Program Office (USG PO) for approval before delivery. Source-controlled parts require the contractor to be a qualified manufacturing source as identified on the Screening Analysis Worksheet or applicable technical data.
For aftermarket parts, the contractor must confirm appropriate condition codes (Factory New, New Stock, or New Surplus preferred), provide complete traceability documentation including proof of manufacture by qualified sources with CAGE codes and manufacturing dates, and complete an in-person visual inspection for every part prior to submission to the USG PO. The contractor shall establish a complete Quality Control Program compliant with FAR clause 52.246-4 and maintain AS9100 aerospace quality management system certification or provide equivalent documentation. All parts must be packaged and marked for international shipment in accordance with Military Standard 2072 or International Air Transport Association Standards, with shipping costs included in unit pricing. The contract is managed by AFLCMC/WNDI at Hill Air Force Base, with Program Manager Joseph Jackson and Contracting Officer Marshall Neilson serving as government points of contact. The contractor shall provide comprehensive production and delivery schedules including ramp-up time (30-day government target), production lead time, and throughput quantity, along with identified Minimum Order Quantities or Quantity Unit Packs for each part.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
For
Foreign Military Sales
Unclassified F-5 Spare Parts
Prepared by
AFLCMC/WNDI
11 Feb 2026
| Change number |
| Date |
| Paragraph(s) |
| Description |
| Name |
| Draft |
| 10 Feb 26 |
Contents
| DESCRIPTION OF REQUIREMENT | 4 | |
| 1.1 | Scope | 4 |
| 1.2 | Requirements | 4 |
| 1.2.1 Manufactured Parts | 4 | |
| 1.2.2 Technical Data | 4 | |
| 1.2.3 Manufacturing Process | 4 | |
| 1.2.4 Variances | 5 | |
| 1.2.5 First Article Inspection/Test | 5 | |
| 1.2.6 Source-Controlled Parts | 5 | |
| 1.3 | Critical Safety Items | 6 |
| 1.4 | Aftermarket Parts | 6 |
| 1.4.1 Aftermarket Condition Codes | 6 | |
| 1.4.2 Traceability Documentation | 6 | |
| 1.4.3 Visual Inspection | 7 | |
| 1.5 | Nonconforming Parts | 7 |
| 1.6 | Procurement Quantities | 8 |
| 1.7 | Packaging, Shipping and Transportation | 8 |
| 1.8 | Government Acceptance of Manufactured Parts | 8 |
| 1.9 | Government Acceptance of Aftermarket Parts | 8 |
| 1.10 Schedule | 9 | |
| 2 | GENERAL | 9 |
| 2.1 | Government Points of Contact | 9 |
| 2.2 | Contractor Point of Contact | 9 |
| 2.3 | USG Furnished Documentation, Equipment and Materials | 9 |
| 2.4 | Government Observation | 10 |
| 2.5 | Contractor Travel | 10 |
| 2.6 | Manufacturing Quality Control | 10 |
| 2.7 | Environmental Controls | 10 |
| 2.8 | Safety Requirements | 11 |
| 2.9 | Security and Access to Government Facilities and Equipment | 11 |
| 3 | Reference Documents | 12 |
| 4 | Applicable CDRLs / DID | 13 |
| 5 | Acronyms | 14 |
DESCRIPTION OF REQUIREMENT
This Performance Work Statement (PWS) outlines the general programmatic and technical activities required to provide F-5 spare parts in support of Foreign Military Sales (FMS) customers.
1.1 Scope
The scope of this effort is to procure any of the required F-5 spare parts listed in Attachment 1.
1.2 Requirements
The contractor shall procure or manufacture the F-5 parts listed in Attachment 1. Parts may be sourced from an original equipment manufacturer (OEM), an approved existing manufacturer, a qualified distributor or aftermarket/surplus supplier. Government preference is for the parts to be obtained from an OEM, an existing manufacturer, or from a distributor. Use of aftermarket or surplus parts is acceptable only when compliant with applicable quality, traceability, and airworthiness requirements.
1.2.1 Manufactured Parts
1.2.2 Technical Data
The contractor shall manufacture parts in accordance with (IAW) the most current revision of drawings and specifications, Engineering Orders (EOs) and Engineering Change Orders (ECOs) found in the Joint Engineering Data Management Information Control System (JEDMICS). For currently manufactured parts, the contractor shall identify in their proposal the revision used for the manufacture of each part. Additionally, the contractor shall follow the applicable specifications and requirements identified in section 3 for producing and testing items.
If access to technical data is required for proposal, the offeror may request the applicable technical data from the Procurement Contracting Officer (PCO) on a part-by-part basis. The request shall include the specific National Stock Number (NSN) for which technical data is being requested and justification of the need.
After contract award, the contractor shall, if needed, identify a designated contractor point of contact via a Military Critical Technical Data Agreement, AF Form 2345, to research and receive technical data. This point of contact shall request access to JEDMICS via a System Authorization Access Request, DD Form 2875. The contractor shall notify the United States Government Program Office (USG PO) if problems are encountered while requesting access.
1.2.3 Manufacturing Process
The contractor shall make every attempt to comply with existing manufacturing processes (see section 3). In the event a manufacturing process cannot be followed, and a new manufacturing process must be developed, the contractor shall submit a Request for Variance (RFV) using a DD Form 1694 for each variance with a detailed explanation of the new process including the proposed manufacturing process technical data. (CDRL A003) Additive manufacturing processes shall be IAW DoDI 5000.93 and ISO/ASTM 52900:2021. New manufacturing processes shall not degrade any aspect of the part. The contractor shall not implement new manufacturing processes until approved by the USG PO and PCO. The contractor shall verify that the new process successfully produces an acceptable part by providing the USG PO and PCO a copy of the first article inspection/first article testing (FAI/FAT) report. (CDRL A002) When applicable, the contractor shall deliver all updated finalized manufacturing technical data (complete manufacturing plan) after verification.
1.2.4 Variances
If, during the manufacture of a part, the contractor is unable to comply with a requirement in the documentation, the contractor shall submit to the USG PO an RFV using a DD Form 1694 for each variance. RFVs shall include all waivers and deviations requested by the contractor. The contractor must receive RFV approval from the USG PO and PCO before proceeding with implementing the variance. The contractor shall document approved variances on the inspection and receiving report that accompanies each part type/lot shipment. The USAF will retain material review board authority for all changes.
1.2.5 First Article Inspection/Test
For newly manufactured parts, the contractor shall be responsible for conducting all required First Article inspections and/or testing per AS9100 and applicable technical data. The contractor shall accomplish FAI/FAT on the first production article which is in addition to any required acceptance testing (individual or LOT) for that part. The FAI/FAT results report shall be submitted to the USG PO for review and approval within 30 calendar days after completion of first article. (CDRL A002) The contractor shall make available to the USG PO for review the results of acceptance testing for the First Article unit and all subsequent units. The contractor shall accomplish recurring FAI/FAT at the appropriate intervals as specified in the applicable technical data. The contractor shall not submit a First Article for acceptance/inspection by the designated government representative (see paragraph 1.8) or deliver parts to the continental United States (CONUS) shipping location until the FAI/FAT is approved by USG PO. The contractor may request a waiver of FAI/FAT for non-critical safety items if the part, or a similar part, was or is in production on a Department of Defense contract and a First Article has already been approved, provided the first article approval was issued within the last thirty-six (36) months. The contractor shall submit all waiver requests to the USG PO for approval no later than sixty (60) calendar days prior to completion of the first production unit.
1.2.6 Source-Controlled Parts
For source-controlled parts, identified on Attachment 1, the contractor shall be a qualified manufacturing source. Qualified manufacturing sources are identified on the Screening Analysis Worksheet (SAW) or applicable technical data. If the contractor is currently or has previously manufactured the source-controlled part as a qualified source but is not identified in the SAW or technical data, the contractor may submit a request, including proof of source qualification, to the USG PO to be evaluated as a qualified source. If the contractor is not currently a qualified manufacturing source, they may request to become a qualified source by submitting a Source Approval Request (SAR) with their proposal. A SAR is a package of information provided by a prospective new supplier to become an approved source for procurement of an NSN. This package must contain all technical data needed to demonstrate competence to manufacture the NSN to the same, or better, level of quality than the current approved source(s). The SAR guide and template are located on the DLA.mil website.
For newly qualified sources, FAI/FAT will not be waived.
1.3 Critical Safety Items
Critical safety items (CSIs) parts are identified in Attachment 1. Associated critical characteristics and critical safety processes for each part are identified in EOs and/or ECOs. The contractor shall manage CSIs IAW the Aviation Critical Safety Item Management Handbook, and AFI 20-106, Management of Aviation Critical Safety Items. These items require a 100% inspection and shall undergo a complete documentation review and approval by the government quality assurance representative identified in paragraph 1.7.
1.4 Aftermarket Parts
For all parts being procured from previously manufactured stock, the contractor shall confirm the appropriate condition code, adequate traceability documentation and completion of a successful visual inspection has been accomplished prior to procurement. The contractor shall provide traceability and a visual inspection report. (CDRL A005) The contractor shall deliver this information to the United States Government Program Office (USG PO).
1.4.1 Aftermarket Condition Codes
Preferred condition codes for aftermarket parts include:
FN: Factory New – new part from original manufacturer/distributor, produced within the last 4 months.
NE: New Stock – new part from original manufacturer/distributor produced more than 24 months ago.
NS: New Surplus – new part from a third party Other condition codes may be proposed by the contractor on a part-by-part basis for consideration by the USG PO and PCO.
1.4.2 Traceability Documentation
The contractor shall provide documentation of traceability for aftermarket parts being procured. This documentation shall include, at a minimum, proof of manufacture by qualified source, licensed/authorized manufacturing source or OEM, to include manufacture’s CAGE code, prior government contract number if known/available, manufacturing date and quality assurance acceptance by the manufacturing source. In the event traceability documentation is not available, the USG PO may authorize alternative documentation, such as a contractor-developed product conformance documentation package/Certificate of Conformance (CoC). This process will be conducted on a case-by-case basis. Complete traceability documentation shall be provided to the USG PO. (CDRL A005)
1.4.3 Visual Inspection
The contractor shall perform an in-person visual inspection for every aftermarket part procured prior to submission to the USG PO for acceptance. Inspection by photograph is not acceptable. In the event the part is in original manufacturing packaging, visual inspection will be limited to the packaging and not require part removal from original packaging. The contractor shall verify no evidence of damage, degradation, mishandling or tampering of the part (or packaging) exists. In the event the contractor identifies an anomaly, the contractor may request the USG PO accept the anomaly and not reject the part if the contractor determines the anomaly will not affect the part’s performance, function, service life or integrity. The contractor shall include in the aftermarket inspection report all pertinent information related to the inspection for each item inspected including, but not limited to: (CDRL A005)
-When and where the inspection took place, to include company names and locations.
-The individuals involved in the inspection including the roles and affiliation of each individual.
-What was inspected to include serial number, part number, stock number, item description, production lot number, contract delivery number, item unique identification number, manufacturer information and other applicable descriptive information.
-The method used to perform the inspection and how it was accomplished to include the use of ancillary equipment or devices.
-The condition of the item being inspected, to include the packaging.
-The detailed results and findings of the inspection.
-Waiver request for each anomalous finding for which the contractor determines the anomaly does not impact acceptability of the part with an explanation of why the anomaly is acceptable.
-Optional: date stamped photographs taken during the inspection that supplement documentation of the results and findings.
-If no anomalies are found, or if all anomalies found are on waiver requests, a statement of acceptability of the part from the contractor.
1.5 Nonconforming Parts
Nonconforming parts delivered by the contractor will be subject to USG established procedures for Supply Discrepancy Reports (SDRs). SDRs may be submitted by the end user for resolution up to one year following shipment to the CONUS location. After the end user initiates an SDR, the SDR office will conduct an assessment to validate the SDR claim. If it is determined the claim is valid, the SDR office will contact the contractor for resolution. The contractor shall cooperate with the SDR office, when contacted, to resolve the SDR. The contractor shall be responsible for all additional expenses resulting from the corrective action.
1.6 Procurement Quantities
Quantities listed are initial quantities. Contractor shall provide a Minimum Order Quantity (MOQ) or Quantity Unit Pack (QUP) if different from the initial quantity listed. For parts with no identified quantity, the contractor shall indicate in their proposal an MOQ or minimum QUP. The contractor shall also identify in their proposal if MOQ/QUP is per task/delivery order or total contract quantity.
1.7 Packaging, Shipping and Transportation
The contractor shall prepare the parts for pick-up by the country’s freight forwarder. All parts shall be packaged and marked for international shipment IAW the special packaging instructions (SPI) identified for each part in Attachment 1. If a SPI is not indicated for a part, the contractor shall pack and crate the part IAW MIL-STD-2073 for international shipment. In the event MIL-STD does not provide adequate instructions, the contractor shall follow packaging and crating procedures defined in applicable International Air Transport Association Standards, Manuals and Guidelines (IATA). The contractor shall provide electro-static discharge (ESD) protection if required for each part prior to crating and shipping. The contractor shall include with each part documentation including, but is not limited to, signed/stamped CofC and acceptance or functional test reports.
The contractor shall label all items for shipment IAW MIL-STD-129. The contractor shall include the USG PO provided document control number on the shipping label.
The contractor shall ship the parts to the designated CONUS freight forwarder location for customs clearance and forwarding to the participating FMS customer. The specific shipping location will be identified on each task order/delivery order. All shipping costs shall be included in the unit pricing for individual parts.
1.8 Government Acceptance of Manufactured Parts
The USG designated representative or DCMA shall be the point of contact at the contractor or subcontractor facility for monitoring the contractor’s performance and shall perform Wide Area Workflow (WAWF) acceptance. The contractor shall, when requested, notify the USG PO via email no later than two weeks prior to the start of acceptance testing and accommodate USG PO or representative witness of testing, if requested, IAW paragraph 2.4.
1.9 Government Acceptance of Aftermarket Parts
Contractor shall submit all invoices in the WAWF system. The USG PO will accept invoices in WAWF after receiving the DD Form 1149 (shipping document) or any document that has the required information. Contractor shall provide report of shipment, (CDRL A004), verifying shipment of asset within 48 hours of shipment from contractor warehouse/facility.
1.10 Schedule
The contractor shall provide a comprehensive production and delivery schedule for each part in their proposal. The schedule shall include ramp-up time, production lead time and throughput quantity. The government target for ramp-up time is 30 calendar days.
GENERAL
1.10 Government Points of Contact
The responsible USG PO is AFLCMC/WNDI, USAF, F-5 Program Office, Proven Aircraft FMS Programs Section, Legacy Training Aircraft International Branch. The assigned Government Program Manager (PM-G) will function as the single point of contact (POC) for program issues.
| Mr. Joseph Jackson |
| Program Manager |
| 6057 Box Elder Lane, Bldg. 1285 |
| Hill AFB, UT 84056 |
| joseph.jackson.4@us.af.mil |
| Tel: 801-586-0072 |
The responsible USG contracting office is AFLCMC/WNDT, Legacy Training Aircraft Contracting Branch. The assigned PCO will function as the single POC for contractual issues.
Mr. Marshall Neilson Contracting Officer, AFLCMC/WNDT 6072 Fir Ave., Bldg. 1233 Hill AFB, UT 84056 marshall.neilson.1@us.af.mil Tel:
1.11 Contractor Point of Contact
The contractor shall identify a single POC for program issues and status updates. The contractor shall support telecons or other meetings as requested by the PO or the contractor. The contractor shall produce meeting minutes for ad-hoc meetings. (CDRL A001)
1.12 USG Furnished Documentation, Equipment and Materials
The contractor shall perform all work IAW Government and industry standards, publications, regulations, operating instructions, and procedures listed in section 3 in effect at the time of the award as they pertain to the procedures for executing the requirements in this PWS unless otherwise identified as not applicable by the PCO. Equivalent or superseding documents may be used if available. All TOs associated with this effort are listed in the List of Applicable Publications (LOAP) section 3. The contractor shall refer to this LOAP to identify all required TOs necessary to accomplish the requirements of this PWS. Applicability is to the most recent version unless otherwise specified. In the event a conflict or error between or within documentation is found, the contractor shall notify the USG PO and direction will be provided by the PCO.
The contractor shall request any additional documents from the USG PO necessary to complete the requirements of this PWS.
The USG will not provide the contractor with any tooling, equipment, or materials in support of the effort described in this PWS.
1.13 Government Observation
USG personnel, other than the PCO and QAP(s), shall, with PCO or authorized representative(s) coordination, observe contractor operations. However, these personnel shall not interfere with contractor performance or make any changes to the contract.
1.14 Contractor Travel
No travel is required or projected for this effort. The contractor may propose travel as a separate cost, if required.
1.15 Manufacturing Quality Control
In compliance with FAR clause 52.246-4, “Inspection of Services,” and to ensure manufacturing contractors comply with specified contract requirements, the contractor shall establish a complete Quality Control Program (QCP).
Contractor shall include in their proposal either a complete QCP or current ISO 9001 certificate. If an ISO 9001 certificate is provided with proposal, the contractor shall make their full QCP available to the government upon request after contract award.
Contractor shall have an aerospace quality management system certified to the AS9100 standard. AS9100 certification is preferred. However, a comprehensive description of the contractor’s equivalent quality management system is acceptable.
1.16 Environmental Controls
Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable international, federal, state, and local laws, regulations, and requirements regarding environmental protection.
In the event environmental laws/regulations change during the term of this contract, the USG requires the contractor to comply with the laws/regulations as soon as they become effective.
If complying with the new laws/regulations increases or decreases cost, the contractor shall inform the PCO pursuant to notice requirements and negotiate a modification to the contract.
Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling, including hazardous materials.
1.17 Safety Requirements
In performing work under this contract, the contractor is solely responsible for compliance with all federal, state, and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees and visitors.
1.18 Security and Access to Government Facilities and Equipment The efforts required for this task are UNCLASSIFIED and shall not require contractor personnel to obtain a security clearance.
Access to Government Facilities and Equipment: Contractor shall perform all work at contractor’s facility or subcontractor facility as identified and documented in their subcontracting plan if required. Access to USAF facilities and equipment is not required or authorized except for pre-existing agreements.
Controlled Unclassified Information (CUI). The contractor shall comply with DoDI 5200.48_DAFI16-1403, Controlled Unclassified Information, DoDM 5200.01, Vol 1_AFMAN16-1404, Vol 1, Air Force Information Security Program, and DoDM 5400.07_AFMAN33-302 Air Force Manual, DoD Freedom of Information Act (FOIA) Program. The contractor shall monitor CUI aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information.
The Contractor shall distribute controlled unclassified information IAW DoD Instruction 3200.14, Principles and Operational Parameters of the DoD Scientific and Technical Information Program, and DoD Instruction 2040.02, International Transfer of Technology, Articles, and Services. The Contractor shall properly mark all such documents IAW DoD Instruction 5230.24, Distribution Statements on Technical Documents. Technical documents not subject to distribution are defined in DoD Instruction 5230.24, DoD Directive 5230.25, and DoD Manual 5010.12-M, Procedures for the Acquisition and Management of Technical Data.
Protection of Information CUI. Controlled Unclassified Information is any information that law, regulation, or government wide policy requires to have safeguarding or disseminating controls, excluding information that is classified under Executive Order 13526, Classified National Security Information, December 29, 2009, or any predecessor or successor order, or the Atomic Energy Act of 1954, as amended.
The national archives and records administration CUI Registry (http://www.archives.gov/cui/registry/category-list.html) identifies approved CUI categories and subcategories, provides general descriptions for each, identifies the basis for controls, and sets out procedures for the use of CUI.
The contractor shall comply with DoDI 5200.48_DAFI16-1403, Controlled Unclassified Information, and DAFMAN 16-1404 Vol 1-3 Air Force Information Security Program. The contractor will consult the applicable security classification guide to monitor CUI aggregation for potentially generating classified information by compilation.
The Contractor shall comply with DODM 5400.07_AFMAN 33-302, DoD FOIA Program, requirements. Protection of CUI and unclassified DoD information not approved for public release on non-DoD Information Systems will be protected IAW DoDI 8582.01, Security of Non-DoD Information Systems Processing Unclassified Nonpublic DoD information. Unless specific categories of CUI require more stringent controls, non-DoD Information Systems must be protected using the guidelines set forth in NIST Special Publication 800-171, Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations.
Covered Defense Information. The Contractor shall comply with DFARS 252.204-7012 Safeguard Covered Defense Information and Cyber Incident Reporting (Dec 2019) This subpart applies to contracts and subcontracts requiring contractors and subcontractors to safeguard covered defense information that resides in or transits through covered contractor information systems by applying specified network security controls. It also requires reporting of cyber incidents. The subpart does not abrogate any existing contractor physical, personnel, or general administrative security operations governing the protection of unclassified DoD information, nor does it impact requirements of the National Industrial Security Program.
Operations Security (OPSEC). The contractor shall ensure OPSEC is incorporated into the appropriate area of the contract IAW DoD Directive 5205.02E, DoD OPSEC Program and AFI 10-701 Air Force OPSEC Program. The Contractor shall flow down all OPSEC requirements to subcontractors that handle Critical Information (CI). CI is defined as specific facts about friendly intentions, capabilities, or activities needed by adversaries to plan and act effectively against friendly mission accomplishment.
Reference Documents
DEPARTMENT OF DEFENSE (DOD) DOCUMENTS
| 1-1-8 |
| Application and Removal of Organic Coatings, Aerospace and Non-Aerospace Equipment |
| DoDI 5000.93 |
| Use of Additive Manufacturing in the DoD |
| MIL-STD-129 |
| Military Marking for Shipment and Storage |
| MIL-STD-2073 |
| DoD Standard Practice for Military Packaging |
| MIL-B-5087B |
| Bonding, Electrical and Lightning Protection for Aerospace Systems |
| MIL-STD-202 |
| Test Method Standard, Electronic and Electrical Component Parts |
| MIL-STD-1686C |
| Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment |
| 1F-5A-01 |
| List of Applicable Publications, F-5 A/B Weapon System |
| 1F-5E-01 |
| List of Applicable Publications, F-5 E/F Weapon System |
| AFI 20-106 |
| Management of Aviation Critical Safety Items |
| MIL-STD-810 |
| Test Method Standard: Environmental Engineering Considerations in Laboratory Tests |
| MIL-STD-461 |
| Electromagnetic Interference Characteristics Requirements for Equipment |
OTHER GOVERNMENT AND INDUSTRY DOCUMENTS
| CFR/e-CFR |
| Code of Federal Regulation / Electronic Code of Federal Regulations |
| FAR |
| Federal Acquisition Regulation |
| DFARS |
| Defense Federal Acquisition Regulation Supplement |
| AS9017 |
| Control of Aviation Critical Safety Items |
| IPC-A-610 |
| Acceptability of Electronic Assemblies |
| IPC/EIA J-STD-001C |
| Requirements for Soldered Electrical and Electronic Assemblies |
| ISO 9001 |
| Quality Management System – Model for Quality Assurance in Design, Development, Production, Installation and Servicing |
| ISO/ASTM 52900:2021 |
| Additive Manufacturing |
| AS9100 |
| Quality Management System – Aerospace Management |
| IATA |
| International Air Transport Association Standards, Manuals and Guidelines |
| ITAR |
| International Traffic in Arms Regulations |
| N/A |
| Aviation Critical Safety Item Management Handbook, JACG |
| N/A |
| Aviation Source Approval and Management Handbook, JACG |
Applicable CDRLs / DID The contractor shall prepare and deliver data IAW the CDRL form DD Form 1423. All Data Item Descriptions (DID) in the CDRL, as contained in the following table, shall be used as guides in developing the data.
| Distribution Statement |
| CDRL |
| CDRL Name |
| DID |
| PWS Para |
| D |
| A001 |
| Meetings Minutes |
| DI-ADMN-81250C |
| 2.2 |
| D |
| A002 |
| Test/Inspection Report |
| DI-NDTI-80809B |
| 1.2.3, 1.2.5 |
| D |
| A003 |
| Request for Variance (RFV) |
| DI-SESS-80640E |
| 1.2.3 |
| D |
| A004 |
| Report of Receipts, Inventory, Adjustments, and Shipments of Government Property |
| DI-MGMT-80442 |
1.9
| D |
| A005 |
| Technical Report-Study/Services (Aftermarket Inspection Report and Traceability and Visual Inspection Report) |
| DI-MISC-80508B |
| 1.4, 1.4.2, 1.4.3 |
Acronyms
ACRONYM LIST
| Acronym |
| Definition |
| ACO |
| Administrative Contracting Officer |
| AFI |
| Air Force Instruction |
| ASTM |
| American Society for Testing and Materials |
| CDRL |
| Contract Data Requirements List |
| CONUS |
| Continental United States |
| CI |
| Critical Information |
| CUI |
| Controlled Unclassified Information |
| DCMA |
| Defense Contract Management Agency |
| DFARS |
| Defense Federal Acquisition Regulation Supplement |
| DID |
| Data Item Descriptions |
| DoD |
| Department of Defense |
| DODI |
| DoD Instruction |
| ECO |
| Engineering Change Order |
| EO |
| Engineering Order |
| ESD |
| Electro-Static Discharge |
| FAI/FAT |
| First Article Inspection/First Article Testing |
| FAR |
| Federal Acquisition Regulation |
| FOIA |
| Freedom of Information Act |
| IAW |
| In Accordance With |
| ISO |
| International Standards Organization |
| JEDMICS |
| Joint Engineering Data Management Information Control System |
| LOAP |
| List of Applicable Publications |
| MOQ |
| Minimum Order Quantity |
| NSN |
| National Stock Number |
| OCONUS |
| Outside Continental United States |
| OPSEC |
| Operations Security |
| OSHA |
| Occupational, Safety and Health Act |
| PCO |
| Procuring Contracting Officer |
| PM-G |
| Government Program Manager |
| POC |
| Point of Contact |
| POP |
| Period of Performance |
| PWS |
| Performance Based Work Statement |
| QAP |
| Quality Assurance Program |
| QCP |
| Quality Control Program |
| QUP |
| Quantity Unit Pack |
| RFV |
| Request for Variance |
| SAR |
| Source Approval Request |
| SAW |
| Screening Analysis Worksheet |
| SDR |
| Supply Discrepancy Reports |
| SPI |
| Shipping and Packaging Instruction |
| USAF |
| United States Air Force |
| USG |
| United States Government |
| USG PO |
| United States Government Program Office |
| WAWF |
| Wide Area Workflow |
ATTACHMENTS
Attachment 1: Part Numbers
| Qty (ea.) |
| Description |
| PN |
| NSN |
| SPI |
| 3 |
| Windshield panel, aircraft |
| 14-13002-1 |
| 2 |
| Generator, alternating current |
| 976J898-2 |
| 6115001380852 |
| F000003XE3 |
| 3 |
| Displacement, gyroscope |
| 19005-2C |
| 6615004513834 |
| F000773218 |
| 2 |
| Stability augmentation system components |
| 836525-3 |
| 6615002640974 |
| F000004XA4 |
| 1 |
| Landing gear control |
| 248-15, 248-13 |
| 1680010814068 |
| 1 |
| Control unit generator |
| 976J902-6 |
| 6110010346090 |
| F000003E26 |
| 1 |
| Cable assembly, fire detection |
| 877021 |
| 6150004183909 |
image1.png
File details come from the government source that posted it. Updated .