ExhibitB Specification Package BonitoAmphitheater.pdf

PDF 2 MB Posted

Attached to
Reconstruct Bonita Amphitheater in Flagstaff RD on Coconino NF
Solicitation number
127EAX25R0010
Issued by

About this file

This document is a specifications manual for the U.S. Forest Service's project to reconstruct the Bonito Amphitheater located in the Coconino National Forest, Southwest Region 03. The project involves constructing a new amphitheater structure, sidewalks, and lighting at the Bonito Campground, situated approximately 6,950 feet above sea level near Sunset Crater. The site is characterized by volcanic cinders and sits in an area with wintery conditions from November through March and potential monsoonal activity from June through September.

The comprehensive specifications manual covers 35 technical sections detailing requirements for various construction activities, including concrete work, masonry, carpentry, electrical systems, roofing, painting, and site preparation. Key specifications include using western red cedar for wood components, dark gray concrete coloring, metal roof panels with a fluoropolymer finish, and following strict compaction and excavation guidelines. The project emphasizes environmental considerations such as wildlife protection, vegetation preservation, and proper waste management. The specifications are dated April 11th, 2025, and provide detailed technical guidance for contractors bidding on and executing the amphitheater reconstruction project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

SOUTHWEST REGION 03

COCONINO NATIONAL FOREST

RECONSTRUCT BONITO AMPHITHEATER

SPECIFICATIONS

U.S. FOREST SERVICE

APRIL 11TH, 2025

2 | P a g e

TABLE OF CONTENTS

SECTION 01 11 00 – SUMMARY OF WORK

SECTION 01 14 00 – WORK RESTRICTIONS

SECTION 01 22 13 – UNIT PRICES MEASUREMENT AND PAYMENT

SECTION 01 33 00 – SUBMITTAL PROCEDURES

SECTION 01 40 00 - QUALITY REQUIREMENTS

SECTION 01 42 13 – ABBREVIATIONS AND ACRONYMS

SECTION 01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION 01 77 00 – CLOSEOUT PROCEDURES

SECTION 02 41 19 - SELECTIVE DEMOLITION

SECTION 03 11 00 – CONCRETE FORMING AND ACCESSORIES

SECTION 03 15 16 – CONCRETE JOINTS

SECTION 03 20 00 – CONCRETE REINFORCING

SECTION 03 30 00 – CAST-IN-PLACE CONCRETE

SECTION 04 20 00 - UNIT MASONRY

SECTION 06 10 00 - ROUGH CARPENTRY

SECTION 06 16 00 - SHEATHING

SECTION 06 20 00 - FINISH CARPENTRY

SECTION 06 46 00 - WOOD TRIM

SECTION 07 41 13 - METAL ROOF PANELS

SECTION 07 62 00 - SHEET METAL FLASHING AND TRIM

SECTION 07 91 23 – BACKER RODS

SECTION 07 92 00 - JOINT SEALANTS

SECTION 08 14 16 - FLUSH WOOD DOORS

SECTION 08 71 00 - DOOR HARDWARE

SECTION 09 91 13 - EXTERIOR PAINTING

SECTION 26 05 19 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION 26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 26 05 44 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING . 67

SECTION 26 27 26 - WIRING DEVICES

SECTION 31 05 16 – AGGREGATES FOR EARTHWORK

SECTION 31 11 00 – CLEARING AND GRUBBING

3 | P a g e

SECTION 31 23 16 – EXCAVATION

SECTION 31 23 23.13 – BACKFILL

SECTION 31 23 23.23 – COMPACTION

SECTION 33 05 26 – UTILITY IDENTIFICATION

SECTION 33 41 00 - STORM UTILITY DRAINAGE PIPING

4 | P a g e

SECTION 01 11 00 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Work for this project consists of constructing a new amphitheater structure, sidewalks, and lighting.

1.2 LOCATION

A. The project work is located at the Bonito Campground on the Coconino National Forest.

From the Flagstaff Ranger Station (5075 US-89, Flagstaff, AZ 86004) at the Marketplace Drive and US-89 intersection, drive north on US-89 for 11.4 miles. Turn right onto NFSR 545 (Fire Rd / Loop Rd) and continue 1.9 miles. Turn left onto NFSR 545F (Bonito Campground Entrance). The new location for the amphitheater is located at latitude

35.370594 decimal degrees, and longitude -111.540781 decimal degrees.

1.3 GENERAL SITE CONDITIONS

A. The site is approximately 6950 feet above sea level, with wintery conditions and subfreezing temperatures from November through March. Temperatures in the middle of summer can reach into the 80- to 90-degrees Fahrenheit. Monsoonal activity, including sudden downpours, lightning, and flash flood typically occur from June through September.

B. The old amphitheater is 500 feet due east of the new proposed location. The new proposed location is above the drainage, where the old amphitheater is buried due to the Pipeline and Tunnel fire debris flooding that occurred in 2022.

C. The site sits on the lava fields near Sunset Crater. Soil conditions consist of approximately twelve (12) inches depth of volcanic cinders over gravelly loamy coarse sand and clay loam.

1.4 FIELD VERIFICATION

A. Field verify all new and existing dimensions and project conditions affecting the work of the project prior to starting the work. If there are any discrepancies from the contract drawings and specifications, notify the Contracting Officer before proceeding with the work.

1.5 EXISTING UTILITIES

A. Notify required blue stake jurisdiction) within the project area and locate all existing utilities, at least 48 hours in advance, prior to the start any excavation activities.

B. Notify the Contracting Officer of proposed locations and times for excavation.

5 | P a g e

C. Locate and prevent damage to known utilities. If damage occurs to known utilities, repair at no cost to the Government.

D. Notify the Contracting Officer 7 days in advance of any planned interruption of existing utilities.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 01 11 00

6 | P a g e

SECTION 01 14 00 – WORK RESTRICTIONS

1.1 SUMMARY

A. This section covers general and specific work restrictions at the project site.

1.2 USE OF PREMISES

A. Staging area for equipment, materials, and supplies is located as shown for the project site. If additional staging areas are required, obtain approval prior to using the area.

B. Contractor’s use of premises is limited by the Government’s right to perform work or to retain other contractors for other projects. Coordinate work activities with other contractors, if applicable, on site to avoid conflict causing construction delays.

C. Conduct operations to ensure the least inconvenience to the public, government employees, and other contractors onsite.

1. If work is on or near occupied campsites, arrange with the Contracting Officer a means of access and space for storage of materials and equipment, prior to the start of the work.

D. Limit use of premises to work in within the construction limits. Do not disturb portions of the project site beyond where the construction limits are indicated.

E. Keep roadways and entrances clear and available to Government employees and vehicles, emergency vehicles, and the public. Do not use these areas for parking or storage of materials.

F. Use of Government’s existing toilet facilities will be permitted at the project site.

G. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations, per MUTCD and OSHA. Minimize disturbance of all undisturbed areas.

H. Overnight camping is available at the project site. Coordinate with the Flagstaff Ranger District for overnight stays and permits at designated areas in and around the project site.

1.3 WORK SCHEDULING

A. Normal working hours for construction activities are from 7:00 AM to 6:00 PM, Monday through Friday.

B. Request for additional work hours requires written approval from the Contracting Officer 7 days in advance of the proposed work period.

C. Depending on conditions, normal fire restrictions may apply to activities associated with this project. Refer to the fire plan for mandatory requirements for different fire restrictions.

7 | P a g e

1.4 UTILITIES

A. WATER

1. Potable water is available for Contractor limited use, such as personal consumption, from May through October only. There is no construction water sources in the area.

B. ELECTRIC

1. Electrical is not available for Contractor use.

C. SEWER

1. There are flush toilets available for Contractor use from May through October

(open season) only.

1.5 WILDLIFE RESTRICTIONS

A. For trenching and digging holes, provide provisions, such as ramps with slopes less than 45 degrees, every 20 to 50 feet to allow the escape of animals that may fall into these recesses, and/or must be covered in such a way as to prevent animals (vertebrates) from falling in them.

B. Do not disturb any wildlife species (reptiles, migratory birds, raptors, bats, etc.) found nesting, hibernating, estivating, or otherwise living in, or immediately nearby, worksites.

1.6 VEGETATION RESTRICTIONS

A. Do not remove any vegetation unless approved by the Government.

B. Provide tree protection fencing around all trees located in and immediately adjacent to the project area.

1.7 OTHER REQUIREMENTS

A. If a crane is used, submit a crane operations and safety plan prior to mobilization.

1. Government will coordinate meeting with the Contractor and Safety Officer to review, resolve, and approve the crane plan prior to mobilization.

2. Include locations where the crane is expected to mobilize, both for staging and phases of work such as tank erection (also known as circulation routes).

3. Provide outrigger and chalk deployment and use and include calculating of “Fall Zone” and “low to the ground” lifts, as well as a description of power line safety and awareness.

4. Provide operator certification and crane specifications.

PART 2 - PRODUCTS (NOT USED)

END OF SECTION 01 14 00

8 | P a g e

SECTION 01 22 13 – UNIT PRICES MEASUREMENT AND PAYMENT

1.1 SUMMARY

A. This section explains, in general, what is and what is not included in a bid item; the limits or cut-off points where one bid item ends and another begins; and method of measurements and basis of payment for work items listed in the Schedule of Items.

B. Work: Furnishing all labor, materials, equipment, and other incidentals necessary to successfully complete the project, or any portion of it, and carrying out all duties and obligations imposed by the contract by the Contractor.

C. Payment:

1. For each individual item in the Schedule of Items, full compensation for all work related to the item will be made in accordance with these specifications, as shown on the drawings, and as staked in the field.

2. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials are considered incidental or as included in the payment for items shown.

1.2 DETERMINATION OF QUANTITIES

A. Perform, or cause to be performed, all measurements of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.

B. Quantity Measurements:

1. Make all measurements for computation of quantities for all work items except those specified for payment by Actual (Contract) Quantity (AQ), Estimated (Design) Quantity (EQ), or Lump Sum Quantity (LSQ).

2. Compute the quantities for periodic progress payments; the Contracting Officer will compute the quantities for final payment based on measurements taken by the Contractor and recommended by the COR.

3. All Contractor measurements are subject to verification by the Government.

4. Submit all field notes, calculation sheets, and other data used to determine quantities.

5. Verify, in writing, as to the accuracy of the measurements and computations submitted.

1.3 UNITS OF MEASUREMENT

A. Cubic Yard (CY): A measurement computed by one of the following methods:

1. Excavation, Embankment, or Borrow.

a. Measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

2. Material in Place or Stockpile.

a. Measurement computed using the dimensions of the in-place material.

B. Loose Cubic Yard (CY): A measurement computed by one of the following methods:

1. Material in the Delivery Vehicle.

9 | P a g e

a. Measurement computed using measurements of material in the hauling vehicles are the point of delivery. Load vehicles to at least their water level capacity.

Leveling of the loads may be required when vehicles arrive at the delivery point.

C. Each (EA): One complete unit, which may consist of one or more parts.

D. Linear Foot (LF): As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.

E. Lump Sum (LS): Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as “All.” Estimated quantities of lump sum work shown in the contract are approximate.

F. Square Foot (SF): Measure on a plane parallel to the surface being measured.

1.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. Actual (Contract) Quantity (AQ)

a. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity. If there is evidence that a quantity specified as a contract quantity is incorrect, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.

2. Estimated (Design) Quantities (EQ):

a. Per FAR 52.211-18 Variation in Estimated Quantity, if the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the contracting officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

3. Lump Sum Quantities (LSQ):

a. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that pay item. Estimated quantities of lump sum work shown in the contract are approximate.

10 | P a g e

PART 2 - PRODUCTS (NOT USED)

END OF SECTION 01 22 13

11 | P a g e

SECTION 01 33 00 – SUBMITTAL PROCEDURES

1.1 SUMMARY

A. This section includes administrative and procedural requirements for submitting shop drawings, product data, samples, and other miscellaneous submittals.

1.2 SECTION REQUIREMENTS

A. SPECIFIED PRODUCTS

1. When a product, model number, part number, etc. is specified herein, it is implied a substitute product with the same performance specifications may be submitted as an Approved Equal, subject to final approval by the Contracting Officer.

B. DEFINITIONS

1. Submittals requirements are specified in the technical sections. Submittals are identified by titles as follows:

a. Preconstruction Submittals: Submittals which are required prior to start of construction work, issuance of contract notice to proceed, or commencing work at the site. This includes, but not limited to:

1) List of proposed Subcontractors (SF Form 1413)

2) Construction progress schedule

3) Health and safety plan

4) Work plan

5) Quality Control (QC) plan

6) Bonding

b. Shop Drawings: Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

c. Product Data: Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance, and other characteristics of materials, systems or equipment for some portion of the work.

d. Samples:

1) Fabricated or un-fabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

2) Color samples from the manufacturer’s standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

e. Design Data:

1) Design calculations, mix designs, analyses or other data pertaining to a part of the work.

2) Design submittals, design substantiation submittals and extensions of design submittals.

3) Design calculations, mix designs, analyses or other data pertaining to a part of the work.

12 | P a g e

f. Test Reports:

1) Reports signed by authorized official of testing laboratory that a material, product, or system identical to the material, product, or system to be provided has been tested in accord with specified requirements.

2) Reports of tests required to be performed by the Contractor on an actual portion of the work prepared for the project before shipment to job site.

3) Report which includes finding of a test made at the job site or on a sample taken from the job site, on portion of work during or after installation.

g. Certificates: Statements printed on the manufacturer’s letterhead and signed by responsible officials of manufacture of product, system, or material attesting that the product, system, or material meets specification requirements. Must be dated after award of the project contract and clearly name the project.

h. Manufacturer’s Instructions: Preprinted material describing installation of a product, system, or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.

i. Manufacturer’s Fields Reports:

1) Documentation of the testing and verification actions taken by manufacturer’s representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer’s standards or instructions.

2) Documentation must be signed by an authorized official of a testing agency laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.

j. Operation and Maintenance Data:

1) Data that is furnished by the manufacturer, or the system provider, to the product, system, or equipment operating and maintenance personnel, including manufacturer’s help and product line necessary to maintain the product, system, or equipment.

k. Closeout Submittals:

1) Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

2) Special requirements necessary to properly close out a construction contract, such record drawings and as-built drawings.

C. VARIATIONS

1. Variations from contract requirements require Governmental approval pursuant to contract clause FAR 52-236-21 and will be considered where advantageous to the Government.

2. Highlight, encircle, or otherwise identify deviations from the contract documents on submittals.

PART 2 - PRODUCTS

2.1 Government Approval (GA) Submittals

A. Written and graphic information that requires Contracting Officer’s responsible action.

2.2 For Information Only (FIO) Submittals

A. Written information that does not required Contracting Officer’s approval.

13 | P a g e

B. Submittals may be rejected for not complying with requirements.

PART 3 - EXECUTION

3.1 GENERAL

A. Review each submittal and check for compliance with the contract documents. Note corrections and field dimensions.

B. Review Notifications:

1. The Contracting Officer review will be completed and returned within 14 calendar days after date of submissions.

2. If a submittal is marked as “Disapproved” or “Does not comply”, resubmit with appropriate corrections. No work shall proceed for this item until resubmittal is approved.

C. Contracting Officer will not review submittals that do not bear the Contractor’s signature and will return them without actions.

D. Use the attached CM-16 cover form for submittals.

E. Approval of items does not relieve the contractor from complying with all requirements of the contract.

END OF SECTION 01 33 00

Transmittal Form CM-16 ACRONYMS: A/E: Architect/Engineer; CMR: Construction Management Representative; FAR: Federal Acquisition Regulation; LEED: Leadership in Energy & Environmental Design; N/A: Not Applicable

Submittal Number: Forest: Requisition: Project: Contract Number: Date: Sheet: 1 of 2 Transmittal Number:

Construction Contractor: Subcontractor / Supplier:

Ac tio n

Su bm itt al

In fo rm at io na l S ub m itt al

Ite m

N um be r

Sp ec ifi ca tio n

Se ct io n

N um be r

Pa ra gr ap h N um be r

Description of Item (Size, Type, Name, Manufacturer, Use, etc.) Al te rn at e M at er ia ls

Pr op os ed

A/E ACTION

Action Submittal

Ap pr ov ed

Ap pr ov ed w ith

N ot at io ns

D is ap pr ov ed

R es ub m it

USFS ACTION

Action Submittal

Ap pr ov ed

Ap pr ov ed w ith N ot at io ns

D is ap pr ov ed

R es ub m it

Informational Submittal

Ac ce pt

R ej ec t

Construction Contractor - Name, Title, & Signature: Date:

I hereby certify this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements. FAR 52-236-21

CMR - Name, Title, & Signature: Date:

A/E - Name, Title, & Signature: Date:

Review Comments - Name: Comment(s):

Recommended By - COR or Alternate COR - Name, Title, & Signature: Date:

Action By - USFS Name, Title, & Signature: Date:

Approval of this submittal is subject to the provisions of the contract drawings and specifications.

This action is for general concurrence only and the Government is not responsible for errors or omissions.

Date Received: Date to Construction Contractor:

Distribute 1 copy each: CMR Interim, A/E, USFS & Construction Contractor.

USFS Review Comments - Name: Comment(s):

Transmittal Form CM-16 Continuation ACRONYMS: A/E: Architect/Engineer; CMR: Construction Management Representative; FAR: Federal Acquisition Regulation; LEED: Leadership in Energy & Environmental Design; N/A: Not Applicable

Submittal Number: Forest: Requisition: Project: Contract Number: Date: Sheet: 2 of 2 Transmittal Number:

Construction Contractor: Subcontractor / Supplier:

Ac tio n

Su bm itt al

In fo rm at io na l S ub m itt al

Ite m

N um be r

Sp ec ifi ca tio n

Se ct io n

N um be r

Pa ra gr ap h N um be r

Description of Item (Size, Type, Name, Manufacturer, Use, etc.) Al te rn at e M at er ia ls

Pr op os ed

A/E ACTION

Action Submittal

Ap pr ov ed w ith N ot at io ns

D is ap pr ov ed

R es ub m it

USFS ACTION

Action Submittal

Ap pr ov ed w ith N ot at io ns

D is ap pr ov ed

R es ub m it

Informational Submittal

Ac ce pt

R ej ec t

Review Comments - Name: Comment(s):

16 | P a g e

SECTION 01 40 00 - QUALITY REQUIREMENTS

1.1 SECTION REQUIREMENTS

A. Submittals:

1. Quality Control Plan – Pre-Construction, GA

2. Contractor Daily Reports – Reports, FIO

1.2 QUALITY CONTROL PLAN

A. Provide a Contractor Quality Control (CQC) plan prior to the start of construction.

B. The CQC plan must minimally include:

1. A description of the quality control organization showing individual names and job titles and lines of authority up to an executive of the company at the home office.

2. Names and qualifications, in resume format (including position titles and durations in qualifying experience), for each person in the QC organization. Include Construction Quality Management (CQM) for Contractors course certifications for the QC personnel if applicable.

3. Duties, responsibilities, and authority of each QC personnel.

4. Letter(s) signed by an officer of the firm appointing the QC Manager and Alternative QC

Manager (if applicable), stating they are responsible for implementing and managing the QC program as described in the Contract. Include the responsibility of the QC Manager and Alternate QC Manager their authority to stop work that is not in compliance with the Contract.

5. Accredited and certified testing laboratory information to be used on the project.

6. Testing plan and log that includes the tests required, associated feature of work required, referenced by the specification paragraph number requiring the test, frequency, and person responsible for each test.

7. Procedures to complete construction deficiencies from identification through acceptable correctable action. Establish verification procedures that identified deficiencies have been corrected.

8. Reporting procedures, including proposed reporting formats.

9. Procedures for submitting and reviewing design changes / variations prior to submission to the Contracting Officer.

1.3 DAILY REPORTING

A. Name and area of responsibility of the Contractors and any subcontractors.

B. Operating equipment with hours worked, idle, or down for repair.

C. Work performed each day, giving location, description, and by whom.

D. Test and control activities performed with results and references to specifications and drawing requirements. List of deficiencies noted, along with corrective action.

17 | P a g e

E. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications and drawings requirements.

F. Job safety evaluations stating what was checked, results, and instructions or corrective actions.

G. Instructions given/received and conflicts in plans and specifications.

H. Verification of trades working on the project, number of personnel working, weather conditions encountered, and any delays encountered. Cover both conforming and deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the Contract.

1.4 TESTING AND INSPECTION SERVICES

A. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

B. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and reinspecting.

C. Testing Agency Qualifications: An independent agency with the experience and capability to conduct testing and inspecting indicated; and where required by authorities having jurisdiction, that is acceptable to authorities.

D. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

E. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify the Contractor and Contracting Officer of irregularities or deficiencies in the Work observed during performance of its services.

2. Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work.

3. Do not perform any duties of Contractor.

18 | P a g e

F. Associated Services: Cooperate with testing agencies and provide reasonable auxiliary services as requested. Provide the following:

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Security and protection for samples and for testing and inspecting equipment.

G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

1.5 REFERENCED STANDARDS

A. If compliance with two or more standards is specified and the standards establish different or conflicting requirements, comply with the most stringent requirement. Refer uncertainties to Architect for a decision.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

B. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 01 40 00

19 | P a g e

SECTION 01 42 13 – ABBREVIATIONS AND ACRONYMS

1.1 CONTRACTING

A. CO – Contracting Officer

B. COR – Contracting Officer’s Representative

C. FAR – Federal Acquisition Regulation

D. FIO – For Information Only

E. FSH – Forest Service Handbook

F. FSM – Forest Service Manual

G. GA – Government Approval

H. SF – Standard Form

1.2 AGENCIES

A. DOC – Department of Commerce

B. MAG – Maricopa Association of Governments

C. OSHA – Occupational Safety and Health Administration

D. USFS – United States Forest Service

1.3 TECHNICAL AND PROFESSIONAL GROUPS

A. AASHTO – American Association of State Highway and Transportation Officials

B. ACI – American Concrete Institute

C. ANSI – American National Standards Institute

D. APA – American Plywood Association

E. ASSE - American Society of Safety Engineers

F. ASTM – American Society for Testing and Materials

G. AWPA – American Wood Protection Association

H. BHMA – Builders Hardware Manufacturers Association

20 | P a g e

I. CCRL – Cement and Concrete Reference Laboratory

J. CRSI – Concrete Reinforcing Steel Institute

K. DHI – Door and Hardware Institute

L. MPI – Master Painter’s Institute

M. NECA – National Electrical Contractor’s Associated

N. NIST – National Institute of Standards and Technology

O. NFPA – National Fire Protection Association

P. NSF – National Sanitation Foundation

Q. SDI – Steel Door Institute

R. SCTE – Society of Cable Telecommunications Engineers

S. SSPC – Society for Protective Coatings

T. UL – Underwriters Laboratories

1.4 UTILITIES

A. EPC – Electrical Polyvinyl Chloride [Conduit]

B. NPS – Nominal Pipe Size

C. PE - Polyethylene

D. PVC – Polyvinyl Chloride

E. SDR – Standard Dimension Ratio

1.5 OTHER

A. MUTCD – Manual on Uniform Traffic Control Devices

B. NFSR – National Forest System Road

C. PS – Product Standard

D. SP – Standard Practice

21 | P a g e

END OF SECTION 01 42 13

22 | P a g e

SECTION 01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

PART 1 - GENERAL

1.1 SUMMARY

A. This section covers the management and disposal of all construction-related debris because of ongoing project activities.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 REMOVAL OF MATERIAL

A. Construct adequate debris shields to contain debris within the construction limits. Do not permit debris to enter waterways, travel lanes open to public traffic, or areas designated not to be disturbed.

B. Raze and remove all buildings, foundations, pavements, sidewalks, curbs, fences, structures, and other obstructions interfering with the work and not designated to remain.

C. Except in excavation areas, backfill and compact cavities left by structure and vegetation removal with backfill material of the finished ground.

3.2 DISPOSAL OF MATERIAL

A. Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

B. Dispose of hazardous material according to Federal, State, and local regulations, and furnish a copy of all disposal permits, if applicable.

END OF SECTION 01 74 19

23 | P a g e

SECTION 01 77 00 – CLOSEOUT PROCEDURES

1.1 SUMMARY

A. This section includes administrative and procedural requirements for contract closeout.

1.2 SUBSTANTIAL COMPLETION PROCEDURES

A. With the Contracting Officer, prepare a list of items to be completed and corrected (punch list).

B. Submittals

1. Prior to Substantial Completion: Before requesting Substantial Completion inspection, submit all required submittals.

C. Procedures

1. Prior to Substantial Completion: Before requesting Substantial Completion inspection, complete the following:

a. Remove temporary facilities and controls.

b. Complete final cleaning requirements, including touchup painting.

D. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, the Contracting Officer will proceed with inspection or advise Contractor of unfulfilled requirements. The Contracting Officer will prepare the certification of Substantial Completion after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.

1.3 FINAL COMPLETION PROCEDURES

A. Submittals Prior to Final Completion: Before requesting inspection for determining final completion, submit certified copy of Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by the Contracting Officer, indicating all items have been corrected and fixed.

B. Submit a written request for final inspection for acceptance. On receipt of request, the Contracting Officer will either proceed with inspection or notify Contractor of unfulfilled requirements.

1. Re-inspection: Request re-inspection when the work identified in previous inspections as incomplete is completed or corrected.

24 | P a g e

3.1 CLEANING

A. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities.

Sweep paved areas; remove stains, spills, and foreign deposits. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

2. Sweep paved areas broom clean. Remove spills, stains, and other foreign deposits.

3. Remove labels that are not permanent.

END OF SECTION 01 77 00

25 | P a g e

SECTION 02 41 19 - SELECTIVE DEMOLITION

1.1 SECTION REQUIREMENTS

A. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify the Contracting Officer.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 DEMOLITION

A. Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

B. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

C. Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill. Do not burn demolished materials.

END OF SECTION 02 41 19

26 | P a g e

SECTION 03 11 00 – CONCRETE FORMING AND ACCESSORIES

1.1 SUMMARY

A. This section covers requirements for concrete forming and accessories, for replacing and new concrete applications.

PART 2 - PRODUCTS

2.1 MATERIALS FOR FORMS

A. General

1. Use wood, metal, or other suitable material for forms.

B. Wood Forms.

1. Provide lumber that is square edges or tongue-and-groove boards, free of raised grain, knotholes, or other surface defects.

2. Provide plywood that complies with NIST PS 1, B-B concrete form panels or better or

APA A135.4, hardboard for smooth form lining.

C. Plastic Forms.

1. Provide plastic forms that contain a minimum of 50 percent post-consumer recycled content, or a minimum of 50 percent post-industrial recycled content.

D. Steel Forms.

1. Provide steel form surfaces that to not contain irregularities, dents, or sags.

PART 3 - EXECUTION

3.1 FORMS

A. Design and construct forms that are free of bulge and warp and allow for removal without injuring the concrete. When concrete contains a retarding admixture, fly ash, or other pozzolan replacement for cement, design the forms for a lateral pressure equal to that exerted by a fluid weighing 150 pounds per cubic foot.

B. Set forms mortar-tight and true to line and grade.

C. Provide formwork with clean-out openings to permit inspection and removal of debris.

D. Before concrete placement, coat the contact surfaces of forms with a form release agent.

E. Use forms that extend the full depth of the concrete.

27 | P a g e

F. Construct formwork to ensure that after removal of forms and prior to patching and finishing of formed surfaces; provide concrete surfaces in accordance with tolerances specified in ACI 301 Section 5 and ACI 117.

G. Reuse forms providing the structural integrity of concrete and the aesthetics of exposed concrete are not compromised. Wood forms must not be clogged with paste and must be capable of absorbing high water-cementitious material ratio paste.

H. Provide form ties in accordance with ACI 301 Section 2.

I. Forms For Standard Rough Form Finish

1. Provide formwork in accordance with ACI 301 Section 5 with a surface finish, SF-1.0, for formed surfaces that are to be concealed by other construction.

J. Forms For Standard Smooth Form Finish

1. Provide formwork in accordance with ACI 301 Section 5 with a surface finish, SF-3.0, for formed surfaces that are exposed to view.

K. After placing concrete, removal of forms must be in accordance with ACI 301 Section 2.

END OF SECTION 03 11 00

28 | P a g e

SECTION 03 15 16 – CONCRETE JOINTS

1.1 SUMMARY

A. This section includes requirements for control, isolation, and construction joints in concrete, both for replacing and new concrete activities.

1.2 SECTION REQUIREMENTS

A. Reference Sections:

1. 07 19 00 – WATER REPELLANTS

2. 07 91 23 – BACKER RODS

PART 2 - PRODUCTS

2.1 MATERIALS

A. Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber, or ASTM D 1752, cork or self-expanding cork.

B. Bond Breaker: Non-staining type which provides positive bond prevention.

1. White opaque polyethylene film under ASTM C 171 except the minimum thickness must be 6 mils.

2. White curing paper under ASTM C 171.

3. Geosynthetic bond breaker.

PART 3 - EXECUTION

3.1 GENERAL

A. Do not vary longitudinal joints more than ½ inch and transverse joints more than ¼ inch from the true alignment.

B. Where a concrete pavement, sidewalk, ramps, and walkways are constructed contiguous to the curb, construct the joints in the curb directly in line with the existing joints.

C. Protect all joints from the intrusion of deleterious matter until sealed.

D. Methods

1. Dry-cut saw method.

a. Install joints as soon as sawing equipment can be supported, and before uncontrolled cracking occurs.

b. Do not ravel the joints while sawing.

c. Do not saw a joint if a crack occurs at or near the joint location before sawing.

d. Discontinue sawing when a crack develops ahead of the saw.

29 | P a g e

2. Tooled.

E. Remove and place newly placed concrete where uncontrolled cracking occurs.

1. Do not saw a joint if a crack occurs at or near the joint location before sawing.

2. Discontinue sawing when a crack develops ahead of the saw.

F. Seal joints which are to receive finish flooring material.

1. Seal with joint sealing compound after concrete curing period.

2. Slightly underfill groove with joint sealing compound to prevent extrusion of compound.

3. Remove excess material as soon after sealing as possible.

G. Where joint sealant is used, apply per the manufacturer’s instructions.

H. Where joints indicated are in direct contact with existing structures, remove foreign and loose materials from the base.

3.2 CONTROL (CONTRACTION) JOINTS

A. Install control joints as shown and detailed in the drawings.

3.3 ISOLATION (EXPANSION) JOINTS

A. Provide joints at points of contact between slabs on grade and vertical surfaces, such as column pedestals, foundation walls, masonry walls, grade beams, and elsewhere as indicated.

B. Fill joints with ½ inch thick joint filler strips, extending full slab depth. Install at proper level below finish floor elevation.

C. Clean groove of foreign matter and loose particles after surface has dried.

D. In lieu of isolation joints and where indicated on the drawings, install base bond breaker. Install bond breaker per the manufacturer’s instructions.

3.4 COLD JOINTS

A. In lieu of isolation joints and where indicated on the drawings, install base bond breaker. Install bond breaker per the manufacturer’s instructions.

B. Provide joints at points of contact between slabs on grade and vertical surfaces, such as column pedestals, foundation walls, masonry walls, grade beams, and elsewhere as indicated.

C. Clean groove of foreign matter and loose particles after surface has dried.

3.5 CONSTRUCTION JOINTS

A. Locate and provide construction joints not indicated so as not to impair the strength and appearance of the concrete, and with the approval of the Contracting Officer.

B. Joints must be perpendicular to main reinforcement.

30 | P a g e

C. Reinforcement must be continued and developed across construction joints.

D. Provide keyways at least 1½ inches deep in construction joints in walls and slabs and between walls and footings.

E. Approved bulkheads may be used for slabs.

3.6 PROTECTION

A. Protect pavement joint sealant from vehicle and foot traffic until fully cured.

END OF SECTION 03 15 16

31 | P a g e

SECTION 03 20 00 – CONCRETE REINFORCING

1.1 SUMMARY

A. This section includes required concrete reinforcement product standards and installation of various types of concrete reinforcement.

1.2 SECTION REQUIREMENTS

A. Submittals:

1. Reinforcing Steel – Product Data, FIO

B. Delivery, Storage, and Handling

1. Store reinforcement and accessories off the ground on platforms, skids, or other supports.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Reinforcing Bars.

1. Deformed, ASTM A615/A615M grade 60 bars and sizes as indicated

B. Tie Bars.

1. Deformed, grade 60 bars conforming to AASHTO M 31 or M 42, except to not use

AASHTO M 42 steel for tie bars bent and re-straightened during construction.

PART 3 - EXECUTION

3.1 REINFORCEMENT

A. Fabricate and place reinforcement steel and accessories as specified and indicated on the drawings. Fabrication and placement details of steel and accessories not specified or shown must be in accordance with ACI SP-66 and ACI 318M ACI 318.

B. Bending may be accomplished in the field or at the mill. Mill bend zinc-coated and epoxy-coated bars prior to coating. Bend all steel cold unless otherwise specified. Do not bend bars after embedment in concrete.

C. Place safety caps on all exposed ends of vertical concrete reinforcement bars that pose a danger to life safety.

D. Face wire tie ends away from the forms.

32 | P a g e

3.2 PLACEMENT

A. Reinforcement must be free from loose rust and scale, dirt, oil, or other deleterious coating that could reduce bond with the concrete.

B. Place reinforcement at locations indicated in the drawings.

C. Prior to concrete pour, secure the reinforcement in its final location using steel wire, precast concrete, or plastic chairs or supports, in accordance with the CSRI’s Ready Reference Reiforcing Steel Resource Guide. Manually holding, pulling, or pushing reinforcement during the concrete pour is NOT permitted.

D. Conform splices of reinforcement to ACI 318 and make only as required or indicated. Bars may be spliced at alternate or additional locations at no additional cost to the Government. Splicing must be by lapping or by mechanical or welded butt connection, except that lap splices must not be used for bars larger

E. DOWEL INSTALLATION

1. Use plain round bars, free from burring or other deformation restricting free movement in the concrete.

2. Dowel with lengths as indicated on the drawings. Immediately prior to placing the dowel, clean hole of dust and other deleterious material with a high-pressure air hose. Fill hole halfway with epoxy or non-shrink grout and insert dowel by rotating it at least one complete turn while tapping it down. Add more epoxy or non-shrink grout to completely fill hole, if necessary.

3. Install dowels in slabs on grade at locations indicated and at right angles to joint being doweled.

4. Accurately position and align dowels parallel to the finished concrete surface before concrete placement.

5. Rigidly support dowels during concrete placement.

6. Install plate dowels according to the manufacturer’s recommendations.

7. Paint half the length of each dowel bar with one coat of tar paint. When the paint dries and immediately before placing the dowels, lubricate the painted end to prevent concrete from bonding to the painted end.

END OF SECTION 03 20 00

33 | P a g e

SECTION 03 30 00 – CAST-IN-PLACE CONCRETE

1.1 SUMMARY

A. This section includes requirements for cast-in-place concrete for various placement applications.

1.2 SECTION REQUIREMENTS

A. Reference Sections:

1. 03 11 00 – CONCRETE FORMING AND ACCESSORIES

2. 03 15 16 – CONCRETE JOINTS

3. 03 20 00 – CONCRETE REINFORCING

4. 07 19 00 – WATER REPELLANTS

5. 31 23 23.13 – BACKFILL

6. 31 23 23.23 – COMPACTION

B. Submittals:

1. Concrete mix design – Design Data, FIO

2. Concrete color – Sample, GA

3. Concrete testing results – Test Reports, FIO

C. Weather Limitations:

1. When air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.

2. When air temperature is less than 40 deg F, use ACI 306 A Guide to Cold Weather

Concreting. Submit a detailed plan for the producing, transporting, placing, protecting, curing, and temperature monitoring of concrete.

3. When rain is threatening during paving operations, stop paving operations and protect the concrete pavement from rain with plastic sheeting or other methods approved by the Contracting Officer. Remove, replace, or repair pavement damaged by rain or hail as directed by the Contracting Officer at no cost to the Government.

D. Ready-Mixed Concrete Producer Qualifications: ASTM C 94/C 94M.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Portland Cement: ASTM C 150, Type I or II.

B. Aggregates: ASTM C 33, Class 3S coarse aggregate or better.

1. Maximum Coarse-Aggregate Size: 1-1/2 inches nominal.

2. Maximum Aggregate Size for Concrete in Insulating Concrete Forms: 3/4 inch.

C. Air-Entraining Admixture: ASTM C 260.

34 | P a g e

D. Chemical Admixtures: ASTM C 494, water reducing, high-range water reducing, water reducing and accelerating, and water reducing and retarding. Do not use calcium chloride or admixtures containing calcium chloride.

E. Color Pigment: ASTM C 979, synthetic mineral-oxide pigments or colored water-reducing admixtures.

F. Synthetic Fiber: ASTM C 1116/C 1116M, Type III, polypropylene fibers, 1/2 to 1-1/2 incheslong.

G. Vapor Retarder: Reinforced sheet, ASTM E 1745, Class A.

H. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

2.2 CONCRETE MIXTURES

A. Normal-Weight Concrete:

1. Minimum Compressive Strength: 4000 psi at 28 days.

2. Maximum Water-Cementitious Materials Ratio: 0.45.

3. Slump Limit: 4 inches for concrete with verified slump of 3 to 5 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch.

4. Air Content: 4-6 percent.

5. Synthetic Fiber: 1.5 lb/CY.

6. Integral Coloring: Davis Colors, Dark Gray Carbon #8048, proportioned and mixed with concrete per the manufacturer’s instructions.

B. Post Footings

1. 4000 psi, sack-mix, fast-setting

C. Measure, batch, mix, and deliver concrete according to ASTM C 94.

1. Maintain temperature of the concrete mixture just before placement between 50 and 90 deg F.

2. Complete concrete discharge operations within 1-1/2 hours after the introduction of the mixing water to the cement and aggregates.

3. Adding water to the mix not permitted beyond the batching and mixing operations.

PART 3 - EXECUTION

3.1 CONCRETING

A. Prepare and compact subgrade and subbase per 31 23 23.13 – BACKFILL and 31 23 23.23 –

COMPACTION.

B. Install forms per 03 11 00 – CONRETE FORMING AND ACCESSORIES.

C. Comply with CRSI's "Manual of Standard Practice" and 03 20 00 – CONCRETE REINFORCING for fabricating, placing, and supporting reinforcement.

D. Obtain written approval by the Contracting Officer of all forms and reinforcement prior to concrete placement.

35 | P a g e

E. Provide 24-hour notice of any concrete placement operations that will be occurring.

F. Place concrete in a continuous operation and consolidate using mechanical vibrating equipment.

1. Place concrete to avoid segregation of material.

2. Do not exceed 30 minutes between deliveries of batches for a single pour.

G. Protect concrete from physical damage, premature drying, and reduced strength due to hot or cold weather during mixing, placing, and curing. Repair and patch defective areas. Methods for protecting concrete and repairing and patching defective areas to be approved by the Contracting Officer.

H. Being curing concrete slabs after finishing.

1. Cure concrete at least 7 days.

2. If high early strength cement is used, cure concrete at least 3 days.

I. Terminate all sidewalks and pathways where concrete meets existing finished earthen grade with the Van Horn Roll. Refer to drawings for Van Horn Roll detail.

3.2 FINISHES

A. Slab Finishes: Comply with ACI 302.1R for screeding, re-straightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces. Provide the following finishes:

1. Scratch finish for surfaces to receive mortar setting beds.

2. Non-slip (medium broom) finish to exterior concrete platforms, sidewalks, steps, ramps, and curb and gutter.

B. Formed Surface Finish: Smooth-formed finish for concrete exposed to view, coated, or covered by waterproofing or other direct-applied material; rough-formed finish elsewhere.

3.3 CONCRETE JOINTS

A. Install control, isolation, and construction joints where indicated, and per 03 15 16 –

CONCRETE JOINTS.

3.4 FIELD QUALITY CONTROL

A. Provide independent certified testing agency, minimum Grade I ACI Concrete Field-Testing Technician.

B. Concrete testing laboratory must have the necessary equipment and experience to accomplish required testing. The laboratory must meet the requirements of ASTM C 1077 and be CCRL inspected.

C. Provide compressive strength testing, per AASHTO T-22 & T-23.

1. 1 set per 30 CY, but not less than 1 set per day.

2. Test two cylinders at 7 days; two cylinders at 28 days and hold two cylinders in reserve.

D. Provide slump test at the site of discharge, per AASHTO T 119, 1 set per 30 CY, but not less than 1 set per day.

36 | P a g e

E. Provide air content test for air-entrained concrete per AASHTO T 152 or T 196, 1 set per 30 CY, but not less than 1 set per day.

F. Determine temperature of concrete at…

This is the start of the file's text. The full file is on GovTribe.