The file is a Schedule of Items for the Reconstruct Bonito Amphitheater project located in the Coconino National Forest, Flagstaff Ranger District. The detailed spreadsheet outlines 35 line items for a comprehensive reconstruction effort, including mobilization, demolition, concrete work, framing, electrical infrastructure, benching, lighting, and site preparation. Measurement methods include Lump Sum (LSQ), Estimated Quantity (EQ), and Actual Quantity (AQ), with quantities ranging from 1 to 11 units across various categories.

The related federal contract opportunity is a competitive Small Business Set-aside Request for Proposal valued between $500,000 and $1,000,000, issued by the Department of Agriculture Forest Service. The project involves reconstructing an amphitheater approximately 200 feet from its original location due to previous flood damage from the Shultz (2010) and Tunnel/Pipeline (2022) fires. The new site is located at latitude 35.370594 and longitude -111.540781, with work focusing on constructing a new amphitheater structure, sidewalks, and lighting. The NAICS code is 237990 (Other Heavy And Civil Engineering Construction), and the Product Service Code is Y1PA for construction of recreation facilities.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

SCHEDULE OF ITEMS
Project:Reconstruct Bonito AmphitheaterRegion:Southwest Region 3
Forest:Coconino National ForestDistrict:Flagstaff Ranger District
Base Bid Line Items
Item NumberSchedule of Item DesciptionMethod of MeasureQuantityPay UnitUnit PriceTotal Cost
010000 (01)MOBILIZATION, BONDING, CONSTRUCTION STAKINGLSQ1LS$$
024119 (01)DEMOLITION, AMPHITHEATER, LIGHTSLSQ1LS$$
033000 (01)SIDEWALK, 4", REINFORCEDEQ910SF$$
033000 (02)CONCRETE PAD, 4", REINFORCED, AMPHITHEATEREQ1690SF$$
033000 (03)POST FOOTING, TIE-BACK AND SCREEN POSTSAQ4EA$$
042000 (01)AMPHITHEATER, PROJECTOR STAND, CMULSQ1LS$$
060000 (01)AMPHITHEATER, FRAMING, SCREEN, SHEDLSQ1LS$$
074113 (01)METAL ROOFLSQ1LS$$
081416 (01)DOOR, WOODAQ2EA$$
087100 (01)DOOR HARDWARELSQ1LS$$
099113 (01)WOOD STAINING / POST PAINTINGLSQ1LS$$
129300 (01)BENCH, PILOT ROCK, 16', EXPANDED METALAQ2EA$$
129300 (02)BENCH, PILOT ROCK, 10', EXPANDED METALAQ8EA$$
129300 (03)BENCH, PILOT ROCK, 4', EXPANDED METALAQ4EA$$
129300 (04)AMPHITHEATER, TIE-BACK POSTAQ2EA$$
260000 (01)ELECTRICAL, WIRING/CONDUIT, AMPHITHEATERLSQ1LS$$
265000 (01)LIGHT, BOLLARDAQ11EA$$
265000 (02)FLOOD LIGHT, W/ SWITCHAQ1EA$$
260519 (01)LOW VOLTAGE WIRINGEQ390LF$$
260544 (01)ELECTRICAL PULL BOX, CONCRETEAQ2EA$$
260544 (02)ELECTRICAL CONDUIT, 1-1/2" PVC CONDUITEQ367LF$$
262726 (01)CONVENIENCE RECEPTACLE, GFCIAQ2EA$$
310516 (01)RIPRAP, INLET AND OUTLET PROTECTIONEQ2LCY$$
310516 (02)SELECT BORROWEQ29LCY$$
311100 (01)CLEARING AND GRUBBINGEQ408SY$$
312316 (01)EXCAVATIONEQ63LCY$$
312316 (02)EXCAVATION, ELECTRICAL TRENCHEQ367LF$$
312323 (01)ROUGH & FINE GRADING, COMPACTIONEQ284SY$$
312323 (02)AGGREGATE BASE COURSE, M.A.G., AMPHI PADEQ21CY$$
312323 (03)AGGREGATE BASE COURSE, M.A.G., SIDEWALKEQ11CY$$
312323 (04)BEDDING COURSE, ELECTRICAL TRENCH / CULVERTEQ16CY$$
312323 (05)BACKFILL, TRENCHES, CUT SLOPES, ETC.LSQ1LS$$
334100 (01)CORRUGATED PE DRAINAGE PIPE, 20'AQ1EA$$
BASE BID TOTAL$

Lists

Method Of MeasurePay Unit
AQActual QuantityACAcre
EQEstimated QuantityCFCubic Feet
LSQLump Sum QuantityCYCubic Yard (In Place)
DYDay
EAEach
GLGallon
HRHour
LBPound
LCYLoose Cubic Yards
LFLinear Foot
LSLump Sum
MIMile
MOMonth
SFSquare Feet
SYSquare Yard
TNTon
YDYard