ExhibitB-1RateSheet_Group_9(protect).xlsx
XLSX spreadsheet 384 KB Posted
- Attached to
- 6000001982 - Concrete Pumping Services
- Solicitation number
- 0000000343
- Issued by
- California
About this file
This is a Rate Sheet (Exhibit B-1) for Concrete Pumping Services issued by the California Department of Corrections and Rehabilitation (CDCR) for the California Men's Colony (CMC), Bid Number 6000001982. The document outlines requirements for various concrete pumping equipment and services, including 85', 100', and 120' boom equipment, maximum 1" aggregate hose pump, 3/8" pea gravel line hose pump, and grout pump services. Each equipment category requires hourly rates for equipment and operator (estimated 30 hours each), rates per yard (estimated 800 yards for boom equipment and 1" aggregate pump, 500 yards for pea gravel and grout pumps), and setup/cleanup and round trip travel fees for 3 trips per category.
The pricing structure requires bidders to submit rates for all items, with zero dollar amounts interpreted as services to be provided at no cost to the state. The document includes a discount option for invoices paid within 30 days of receipt, requiring a minimum discount of one-half percent and at least $50.00. In the event of a tie bid, the lowest responsible bid with the highest discount will prevail. Bidders must submit both electronic (Excel) and printed versions of the completed rate sheet, with all quantities listed being CDCR's estimates only and subject to change.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ExhibitB-1RateSheet_Group_4(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_8(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_2(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_3(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1Rate_Sheet_Group_1(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_10(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_5(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_6(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_7(protect).xlsx | XLSX spreadsheet | |
| IFB_6000001982.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONCRETE PUMPING SERVICES |
| Inmate Ward Labor Program |
Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells. Bidders should include a Compact Disk or diskette of the completed Excel version of the Rate Sheet along with the printed version when submitting their bid.
NOTE: Bidder is required to bid each item. Rates must include all fees and taxes. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicating a zero dollar amount shall perform any such services at no cost to the State.
GROUP 9 - California Men's Colony (CMC)
A. 85' Boom (or equivalent)
1. Rate per hour for Equipment & Operator hr. X 30 hours = $ - 0
2. Rate per yard X 800 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0
ITEM A SUBTOTAL (Add 1 thru 3) = $ - 0
B. 100' Boom (or equivalent)
1. Rate per hour for Equipment & Operator hr. X 30 hours = $ - 0
2. Rate per yard X 800 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0
ITEM B SUBTOTAL (Add 1 thru 3) = $ - 0
C. 120' Boom (or equivalent)
1. Rate per hour for Equipment & Operator hr. X 30 hours = $ - 0
2. Rate per yard X 800 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0
ITEM C SUBTOTAL (Add 1 thru 3) = $ - 0
D. Maximum 1" aggregate hose pump
1. Rate per hour for Equipment & Operator hr. X 30 hours = $ - 0
2. Rate per yard X 800 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0
ITEM D SUBTOTAL (Add 1 thru 3) = $ - 0
E. 3/8" Pea gravel line hose pump
1. Rate per hour for Equipment & Operator hr. X 30 hours = $ - 0
2. Rate per yard X 500 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0
ITEM E SUBTOTAL (Add 1 thru 3) = $ - 0
F. Grout pump
1. Rate per hour for Equipment & Operator hr. X 30 hours = $ - 0
2. Rate per yard X 500 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0
ITEM F SUBTOTAL (Add 1 thru 3) = $ - 0
| GROUP 1- TOTAL BID AMOUNT (Add Subtotals A through F) | = | $ - 0 |
| BASIS OF AWARD |
TOTAL BID AMOUNT $ - 0
Contractor may offer a discount on invoices in order for the invoices to be pad within 30 days of receipt Discount offered must be at least one-half of one perent and a minimum of $50.00.
Discount offered on invoices to be paid within 30 days of receipt = %
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.
California Department of Corrections and Rehabilitation (CDCR) Rate Sheet Bid Number 6000001982 Exhibit B-1
&P of 2
Sheet2
Sheet3
File details come from the government source that posted it. Updated .