ExhibitB-1RateSheet_Group_4(protect).xlsx

XLSX spreadsheet 384 KB Posted

Attached to
6000001982 - Concrete Pumping Services
Solicitation number
0000000343
Issued by
California

About this file

This is a Rate Sheet (Exhibit B-1) from the California Department of Corrections and Rehabilitation (CDCR) for Bid Number 6000001982 requesting Concrete Pumping Services for the Inmate Ward Labor Program at Ventura Youth Correctional Facility. The rate sheet details requirements for various concrete pumping equipment including 85', 100', and 120' booms, maximum 1" aggregate hose pump, 3/8" pea gravel line hose pump, and grout pump. Each equipment type requires pricing for equipment and operator hours, rate per yard of material, and setup/cleanup and round trip travel fees, with estimated quantities ranging from 20-30 hours of operation and 500-1000 yards of material per equipment type.

The pricing structure requires bidders to submit rates for all items, with any zero dollar amounts interpreted as services to be performed at no cost to the state. A discount option is available for invoices paid within 30 days of receipt, requiring at least 0.5% discount and minimum of $50.00. The document notes that quantities listed are estimates only and the State reserves the right to modify work quantities as needed. Bidders must submit both electronic (Excel) and printed versions of the completed rate sheet, with pricing inclusive of all fees and taxes.

View the file

Other files

File Type Posted
ExhibitB-1RateSheet_Group_8(protect).xlsx XLSX spreadsheet
ExhibitB-1RateSheet_Group_2(protect).xlsx XLSX spreadsheet
ExhibitB-1RateSheet_Group_3(protect).xlsx XLSX spreadsheet
ExhibitB-1Rate_Sheet_Group_1(protect).xlsx XLSX spreadsheet
ExhibitB-1RateSheet_Group_9(protect).xlsx XLSX spreadsheet
ExhibitB-1RateSheet_Group_10(protect).xlsx XLSX spreadsheet
ExhibitB-1RateSheet_Group_5(protect).xlsx XLSX spreadsheet
ExhibitB-1RateSheet_Group_6(protect).xlsx XLSX spreadsheet
ExhibitB-1RateSheet_Group_7(protect).xlsx XLSX spreadsheet
IFB_6000001982.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONCRETE PUMPING SERVICES
Inmate Ward Labor Program

Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.

Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells. Bidders should include a Compact Disk or diskette of the completed Excel version of the Rate Sheet along with the printed version when submitting their bid.

NOTE: Bidder is required to bid each item. Rates must include all fees and taxes. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicating a zero dollar amount shall perform any such services at no cost to the State.

GROUP 4 - Ventura Youth Correctional Facility

A. 85' Boom (or equivalent)

1. Rate per hour for Equipment & Operator hr. X 20 hours = $ - 0

2. Rate per yard X 1000 yards (est.) = $ - 0

3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0

ITEM A SUBTOTAL (Add 1 thru 3) = $ - 0

B. 100' Boom (or equivalent)

1. Rate per hour for Equipment & Operator hr. X 20 hours = $ - 0

2. Rate per yard X 1000 yards (est.) = $ - 0

3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 Trips = $ - 0

ITEM B SUBTOTAL (Add 1 thru 3) = $ - 0

C. 120' Boom (or equivalent)

1. Rate per hour for Equipment & Operator hr. X 30 hours = $ - 0

2. Rate per yard X 1000 yards (est.) = $ - 0

3. Total Fee for Setup/Cleanup & Round Trip Travel X 2 Trips = $ - 0

ITEM C SUBTOTAL (Add 1 thru 3) = $ - 0

D. Maximum 1" aggregate hose pump

1. Rate per hour for Equipment & Operator hr. X 20 hours = $ - 0

2. Rate per yard X 1000 yards (est.) = $ - 0

3. Total Fee for Setup/Cleanup & Round Trip Travel X 2 = $ - 0

ITEM D SUBTOTAL (Add 1 thru 3) = $ - 0

E. 3/8" Pea gravel line hose pump

1. Rate per hour for Equipment & Operator hr. X 20 hours = $ - 0

2. Rate per yard X 500 yards (est.) = $ - 0

3. Total Fee for Setup/Cleanup & Round Trip Travel X 2 = $ - 0

ITEM E SUBTOTAL (Add 1 thru 3) = $ - 0

F. Grout pump

1. Rate per hour for Equipment & Operator hr. X 20 hours = $ - 0

2. Rate per yard X 500 yards (est.) = $ - 0

3. Total Fee for Setup/Cleanup & Round Trip Travel X 2 = $ - 0

ITEM F SUBTOTAL (Add 1 thru 3) = $ - 0

GROUP 1- TOTAL BID AMOUNT (Add Subtotals A through F)=$ - 0
BASIS OF AWARD

TOTAL BID AMOUNT $ - 0

Contractor may offer a discount on invoices in order for the invoices to be pad within 30 days of receipt Discount offered must be at least one-half of one perent and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt = %

In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

California Department of Corrections and Rehabilitation (CDCR) Rate Sheet Bid Number 6000001982 Exhibit B-1

&P of 2

Sheet2

Sheet3

File details come from the government source that posted it. Updated .