This is a Rate Sheet (Exhibit B-1) from the California Department of Corrections and Rehabilitation (CDCR) for concrete pumping services under Bid Number 6000001982 for the Inmate Ward Labor Program. The services requested include various concrete pumping equipment with operators, specifically for Group 3 - Richard J. Donovan facility. The equipment requirements include 85' Boom (80 hours), 100' Boom (60 hours), 120' Boom (50 hours), maximum 1" aggregate hose pump (60 hours), 3/8" Pea gravel line hose pump (50 hours), and grout pump (50 hours), with estimated concrete volumes ranging from 500 to 1,000 yards per equipment type.
The pricing structure requires bidders to submit rates for equipment and operator hours, per yard costs, and setup/cleanup and round trip travel fees for each equipment type. Bidders must bid on all items, with zero dollar amounts interpreted as no-cost service to the State. The document includes provisions for electronic submission via Excel spreadsheet along with printed versions. A prompt payment discount of at least 0.5% and minimum $50 is available for invoices paid within 30 days, which serves as a tiebreaker in the event of equal bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ExhibitB-1RateSheet_Group_4(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_8(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_2(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1Rate_Sheet_Group_1(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_9(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_10(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_5(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_6(protect).xlsx | XLSX spreadsheet | |
| ExhibitB-1RateSheet_Group_7(protect).xlsx | XLSX spreadsheet | |
| IFB_6000001982.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONCRETE PUMPING SERVICES |
| Inmate Ward Labor Program |
Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells. Bidders should include a Compact Disk or diskette of the completed Excel version of the Rate Sheet along with the printed version when submitting their bid.
NOTE: Bidder is required to bid each item. Rates must include all fees and taxes. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicating a zero dollar amount shall perform any such services at no cost to the State.
GROUP 3 - Richard J. Donovan
A. 85' Boom (or equivalent)
1. Rate per hour for Equipment & Operator hr. X 80 hours = $ - 0
2. Rate per yard X 1000 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 6 Trips = $ - 0
ITEM A SUBTOTAL (Add 1 thru 3) = $ - 0
B. 100' Boom (or equivalent)
1. Rate per hour for Equipment & Operator hr. X 60 hours = $ - 0
2. Rate per yard X 1000 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 6 Trips = $ - 0
ITEM B SUBTOTAL (Add 1 thru 3) = $ - 0
C. 120' Boom (or equivalent)
1. Rate per hour for Equipment & Operator hr. X 50 hours = $ - 0
2. Rate per yard X 1000 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 6 Trips = $ - 0
ITEM C SUBTOTAL (Add 1 thru 3) = $ - 0
D. Maximum 1" aggregate hose pump
1. Rate per hour for Equipment & Operator hr. X 60 hours = $ - 0
2. Rate per yard X 1000 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 5 = $ - 0
ITEM D SUBTOTAL (Add 1 thru 3) = $ - 0
E. 3/8" Pea gravel line hose pump
1. Rate per hour for Equipment & Operator hr. X 50 hours = $ - 0
2. Rate per yard X 500 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 = $ - 0
ITEM E SUBTOTAL (Add 1 thru 3) = $ - 0
F. Grout pump
1. Rate per hour for Equipment & Operator hr. X 50 hours = $ - 0
2. Rate per yard X 500 yards (est.) = $ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel X 3 = $ - 0
ITEM F SUBTOTAL (Add 1 thru 3) = $ - 0
| GROUP 1- TOTAL BID AMOUNT (Add Subtotals A through F) | = | $ - 0 |
| BASIS OF AWARD |
TOTAL BID AMOUNT $ - 0
Contractor may offer a discount on invoices in order for the invoices to be pad within 30 days of receipt Discount offered must be at least one-half of one perent and a minimum of $50.00.
Discount offered on invoices to be paid within 30 days of receipt = %
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.
California Department of Corrections and Rehabilitation (CDCR) Rate Sheet Bid Number 6000001982 Exhibit B-1