Exhibit1_640-14-123P_SCI Refresh_DRAWINGS.pdf
PDF 46 MB Posted
- Solicitation number
- 36C26122R0083
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26122R0083 0003.pdf | ||
| 36C26122R0083 0002.pdf | ||
| SITE VISIT LOG 36C26122R0083.pdf | ||
| 36C26122R0083 0001.pdf | ||
| Exhibit4_640-14-123P_SCI Refresh_STRUCTUALCALC.pdf | ||
| S02 - RFI Form - 36C26122R0083.docx | DOCX document | |
| Exhibit 3 ICRA Form.pdf | ||
| 36C26122R0083.pdf | ||
| S02 Attachment C_Contractor Certification RE Safety and EMR.docx | DOCX document | |
| S02 Attachment B_Price Breakdown.xlsx | XLSX spreadsheet | |
| Exhibit2_640-14-123P_SCI Refresh_SPECS.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AESUS DESIGN GROUP PROJECT NO. 210043801 MIRANDA AVENUE, PALO ALTO, CA 94304
VA PROJECT # 640-14-123P NOVEMBER 10, 2021
OFFICE OF CONSTRUCTION
AND FACILITIES MANAGEMENT
Department of Veterans Affairs
FINAL BID SET
SUBMITTAL DOCUMENTS
AESUS DESIGN GROUP
RENOVATE BUILDING 7 FOR SPINAL CORD
INJURY
NOV 10, 2021
ARCHITECT, INTERIORS & MEDICAL PLANNING
AESUS DESIGN GROUP
1050 E SOUTHERN AVE, SUITE 5D
TEMPE, ARIZONA 85282
STRUCTURAL ENGINEER
MECHANICAL, PLUMBING, & FIRE PROTECTION
ELECTRICAL , TELECOM, & FIRE ALARM
AESUS DESIGN GROUP
1050 E SOUTHERN AVE, SUITE 5D
TEMPE, ARIZONA 85282
AESUS DESIGN GROUP
1050 E SOUTHERN AVE, SUITE 5D
TEMPE, ARIZONA 85282
PANGOLIN STRUCTURAL
6868 N 7TH AVE, SUITE 203
PHOENIX, AZ 85013
& And L Angle @ At C Centerline Ø Diameter or Round # Pound or Number
(E) Existing
(N) New
(R) Relocated A.B. Anchor Bolt A.C. Air Conditioning ACOUS. Acoustical A.D. Area Drain ADDN. Additional ADJ. Adjustable A.F.F. Above Finish Floor AGGR. Aggregate AL. Aluminum ALT. Alternate A.P. Access Panel APPROX. Approximate ARCH. Architectural ASB. Asbestos A.V. Audio Visual B.B. Bulletin Board B.O. Bottom of BD. Board BKG. Backing BLDG. Building BLK. Block BLKG. Blocking BM. Beam BOT. Bottom CAB. Cabinet CEM. Cement CER. Ceramic C.G. Corner Guard C.J. Construction Joint C.J.P. Complete Joint Penetration C.O. Cased Opening C.R.C. Cold Rolled Channel C.T. Curtain Track CLG. Ceiling CLKG. Caulking CLO. Closet CLR. Clear COL. Column COMP. Composite CONC. Concrete CONF. Conference CONN. Connection CONSTR. Construction CONSUL. Consultation CONT. Continuous CORR. Corridor CPT. Carpet CTSK. Countersunk D.C.S. Diaper Changing Station D.O. Door Opening DET. Detail DEMO. Demolition D.F. Drinking Fountain DIA. Diameter DIM. Dimension DISP. Dispenser DN. Down DR. Door DWR. Drawer DS. Downspout DWG. Drawing E. East E.B. Expansion Bolt E.J. Expansion Joint E.P.B. Electrical Panel Board E.EW. Emergency Eyewash E.W.C. Electric Water Cooler EA. Each EL. Elevation ELEC. Electrical ELEV. Elevator EMER. Emergency ENCL. Enclosure ENGR. Engineer EQ. Equal EQPT. Equipment EXP. Expansion EXT. Exterior F.A. Fire Alarm F.D.C. Fire Department Connection F.D.V. Fire Department Valve F.E. Fire Extinguisher F.E.C. Fire Extinguisher Cabinet F.F. Finish Floor F.H.V.C. Fire Hose Valve Cabinet F.H.W.S. Flat Head Wood Screw F.O.C. Face of Concrete F.O.G. Face of Gypsum Wallboard F.O.S. Face of Stud F.S. Full Size FD. Floor Drain FIN. Finish FIXT. Fixture FL. Floor FLUOR. Fluorescent FS. Floor Sink FT. Foot or Feet FURR. Furring FUT. Future G.B. Grab Bar G.C.P. Gas Control Panel G.F.R.G. Glass Fiber Reinforced Gypsum GA. Gauge GALV. Galvanized GD.R. Guard Rail GL. Glass GND. Ground GR. Grade GSF. Gross Square Foot GYP. Gypsum H. High H.B. Hose Bibb H.P. High Point HDWD. Hardwood HDWE. Hardware HT. Height HOR. Horizontal HR. Hour I.D. Inside Diameter I.P. Isolation Panel ID. Identification INFO. Information INSUL. Insulation INT. Interior INTER. Intermediate
JAN. Janitor JT. Joint L.P. Low Point LAB. Laboratory LAM. Laminate LAV. Lavatory LKR. Locker LT. Light M.A.P. Medical Gas Alarm Panel M.B. Machine Bolt M.T. Make-up Tile M.V.B. Medical Gas Valve Box MAN. Management MAS. Masonry MAT. Material MAX. Maximum MECH. Mechanical MED. Medical MEMB. Membrane MET. Metal MFR. Manufacturer MIN. Minimum MIR. Mirror MISC. Miscellaneous MT. Mounting MTD. Mounted MUL. Mullion N/A Not Applicable N. North N.I.C. Not In Contract N.S. Nurse Station N.T.S. Not To Scale NO. Number NOM. Nominal NSF. Net Square Foot O.A. Overall O.C. On Center O.D. Outside Diameter O.H. Opposite Hand OBS. Obscure OBSERV. Observation OD. Overflow Drain OFF. Office OPNG. Opening OPP. Opposite O.T. Occupational Therapy P.J.P. Partial Joint Penetration P.LAM. Plastic Laminate P.T. Physical Therapy P.T.D. Paper Towel Dispenser P.T.D./R Combination Paper Towel
Dispenser & Receptacle P.T.R. Paper Towel Receptacle PERPEND. Perpendicular PL. Plate PLAS. Plaster PR. Pair PROJ. Projection PT. Point PTN. Partition QTY. Quantity R. Riser R.O. Rough Opening R.W.L. Rain Water Leader R.H. Robe Hook RAD. Radius RD. Roof Drain REC. Reception REF. Reference REFL. Reflected REFR. Refrigerator RGTR. Register REQ. Required/ Requirement(s) RESIL. Resilient RM. Room RUB. Rubber S. South S.C.D. Seat Cover Dispenser S.D. Soap Dispenser S.M.S. Sheet Metal Screw S.N.D. Sanitary Napkin Dispenser S.N.R. Sanitary Napkin Receptacle S.P. Steel Pipe S.ST. Stainless Steel S.SK. Service Sink S.T. Steel Tube SCHED. Schedule SECT. Section SH. Shelf SHR. Shower SHT. Sheet SIM. Similar SPEC. Specification SQ. Square STA. Station STD. Standard STL. Steel STOR. Storage SUSP. Suspended SYM. Symmetrical T. Tread T.B. Towel Bar T.&G. Tongue and Groove T.O. Top of T.O.C. Top of Concrete T.O.D. Top of Deck T.O.S. Top of Steel T.P.B. Telephone Panel Board T.P.D. Toilet Paper Dispenser TV. Television TYP. Typical U.O.N. Unless Otherwise Noted UNF. Unfinished UR. Urinal V.A.T. Vinyl Asbestos Tile V.I.F. Verify In Field VAR. Varies VER. Vertical VEST. Vestibule VC VA Furnished Contractor Installed VV VA Furnished VA Installed W. West W/ With W/O Without W.C. Water Closet W.F. Wide Flange W.O. Where Occurs WD. Wood WIN. Window WP. Waterproof WSCT. Wainscot WT. Weight W.R. Water Resistant
ABBREVIATIONS
TRUE
NORTH
PROJECT
NORTH
THE SPINAL CORD INJURY FACILITY LOCATED WITHIN BUILDING 7 WILL BE RENOVATED IN PREPARATION OF THE WING E DEMOLITION OF BUILDING 7 (PERFORMED UNDER A SEPARATE CONTRACT). THE SCOPE OF THE PROJECT WILL BE TO RELOCATE THE DISPLACED FUNCTIONS OF WING 7E AND PROVIDE SPECIFIC UPGRADES WITHIN THE REMAINING PORTIONS OF BUILDING 7. RELOCATED FUNCTIONS INCLUDE INPATIENT THERAPY SPACES, HOME CARE SERVICES, OFFICES, STORAGE, HOME ENVIRONMENT LEARNING APARTMENT, ELECTRO-PHYSIOLOGY LAB, EXERCISE PHYSIOLOGY LAB, CONFERENCE ROOM. NEW PROGRAM SPACES WILL INCLUDE NEW OUTPATIENT THERAPY GYM.
RENOVATED PROGRAM AREAS WILL INCLUDE STAFF LOUNGE AND RESTROOMS.
• NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
- 2021 NFPA 1
- 2021 NFPA 13
- 2021 NFPA 98
- 2021 NFPA 99
- 2021 NFPA 101, 101A LIFE SAFETY CODE
- 2021 NFPA 220
• 2018 INTERNATIONAL BUILDING CODE (IBC)
• NATIONAL ELECTRIC CODE (NEC) NFPA 70
• MECHANICAL CODES (ASME)
• INTERNATIONAL PLUMBING CODE (IPC)
• 2019 ASHRAE STANDARDS
• OCCUPATIONAL, SAFETY, AND HEALTH
ADMINISTRATION (OSHA) STANDARDS
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,
BARRIER FREE DESIGN GUIDE (PG-18-13)
• VA PALO ALTO DESIGN STANDARDS
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• VA SPACE PLANNING CRITERIA (PG-18-9)
• UNIFORM FEDERAL ACCESSIBILITY STANDARDS
(UFAS)
• VA PHYSICAL SECURITY GUIDELINES FOR MISSION
CRITICAL BUILDINGS OR LIFE SAFETY BUILDINGS
• ENERGY POLICY ACT OF 2005 (EPACT)
• U.S. GREEN BUILDING COUNCIL (USGBC) - LEED V.3
• VA DIRECTIVES, DESIGN MANUALS, MASTER
SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE, AND OTHER GUIDANCE ON THE
TECHNICAL INFORMATION LIBRARY (TIL)
(HTTP://WWW.CFM.VA.GOV/TIL/).
• HEALTH INSURANCE PORTABILITY AND
ACCOUNTABILITY ACT OF 1996 (HIPAA)
• FACILITY GUIDELINES INSTITUTE (FGI) GUIDELINES FOR
DESIGN AND CONSTRUCTION OF HEALTH CARE
FACILITY
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND
RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE
OF STEEL CONSTRUCTION (AISC)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY
SIGNS. STATED IN THE GENERAL REQUIREMENTS
SECTION 01010 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1- 2019.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS –
ASHRAE STANDARD 15 – 2019.
CONCRETE
BRICK MASONRY
INSULATION, RIGID
INSULATION, BATT
WOOD, LUMBER
WOOD, LUMBER
METAL
GLASS
SOLID SURFACE
MATERIAL (SSM)
MEDIUM DENSITY
FIBER BOARD (MDF)
SOLID WOOD, FINISH
PLYWOOD
ACOUSTICAL CEILING
TILE (ACT)
GYPSUM BOARD
Omit Double Lines at Scale Smaller than 3' = 1'
Through Member
Interrupted Member
AS-102 SHEET NUMBERING
SEQUENCE
NUMBERDISCIPLINE LEVEL 2
COLUMN LINE
LETTERS IN ONE
DIRECTION
NUMBERS IN THE OTHER
DIRECTION
DOOR TAG
PARTITION TAG
SEE AS-912
FOR ADD. INFORMATION
1.1 WINDOW TAG
REVISION
CLOUD AROUND REVISION
OPTIONAL
WORK POINT,
CONTROL POINT,
DATUM POINT
MATCHLINE
SHADED PORTION IS THE
SIDE CONSIDERED
SECTION
SECTION NUMBER
SHEET WHERE SECTION
IS LOCATED
ELEVATION(S)
ELEVATION NUMBER
SHEET WHERE ELEVATION
IS LOCATED
DETAIL
2 SECTION AT KEY
PLAN
ELEVATION AT KEY
PLAN
SPOT ELEVATION
AT SLAB, ROOF
INSULATION, OR METAL
DECK
+1'-3"
TO REMAIN
TO BE DEMOLISHED
EXISTING &
DEMOLITION
CORNER GUARD
END CAP
CONSTRUCTION
BARRICADE
SHOWER CURTAIN
CUBICAL CURTAIN
TRACK
DIMENSION LINE
TO CENTERLINE OF
COLUMN OR STUD
TO FACE OF FINISH
TO CENTER OF OPENING
ACCESS PANEL
LIGHTING FIXTURE
AND OTHER CEILING
DEVICES
SUPPLY DIFFUSER
RETURN DIFFUSER
LINEAR DIFFUSER
FLUORESCENT
LIGHTING FIXTURE
PENDANT LIGHTING
FIXTURE
RECESSED DOWN
LIGHTING FIXTURE
SURGICAL LIGHTING
FIXTURE
EQUIPMENT BOOM
LOCATION OF
ADJACENT AREA
DISCIPLINE LEVEL 1
FIRE SPRINKLER HEAD
EXIT DIRECTION
EXIT SIGN
SIGN FACING DIRECTION
WALL MOUNT (OMIT
IF CEILING
MOUNTED)
NAME
NUMBER
CEILING HEIGHT, W.O.
ROOM TAG
SECURITY CAMERAC
H HEAT DETECTOR
MOTION SENSORM
N NURSE CALL
PHOTOCELLP
D SMOKE DETECTOR
MICROPHONEm
SPEAKERS
X-RAY/ LASER WARNINGX
B3-009.1 INCREMENT (OMIT IF
ONLY ONE DOOR IN
ROOM)ASSOCIATED ROOM
NUMBER
*6bs
AS-300
AS-901
1 DETAIL NUMBER
SHEET WHERE DETAIL IS
LOCATED
AS-500
5 .
5 .
30 15
1A
ROOM NAME
B3-208A
10'-0"
1/ AS-101
1.1
TYPE 1
TYPE 2
WINDOW TREATMENT
TYPE 1
TYPE 2
HW
EQUIPMENT TAG
SEE AS-941
FOR ADD. INFORMATION018745
T4* COUNTERTOP TAG
SEE AS-940
FOR ADD. INFORMATION
CASEWORK TAG
SEE AS-940
FOR ADD. INFORMATION
A4
N L
SHEET WHERE DETAIL IS
LOCATED
REPLACE (E) GYP. BD.
AND FINISHES, W.O.
CRASH RAIL
WALL PROTECTION
EXHAUST DIFFUSER
SOUND INSULATION
NON RATED
NEW PARTITION
SMOKE RATED
1-HOUR FIRE RATED
1-HOUR FIRE/SMOKE
2-HOUR FIRE RATED
2-HOUR FIRE/SMOKE
WALL MOUNTED
CABINET/ EQUIPMENT
F.E.C. TYPE (SEE ABBREV.
LIST)
LEAD LINED
COILING DOOR TAGC1
FIRE SPEAKERF
INTEGRATION SPEAKERs
ADA CLEARANCE LINE
AREA OF WORK
EXISTING AREA TO REMAIN
SHADE
BLACKOUT SHADE
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Renovate B7 SCI - Refresh Project
Location:
FINAL BID SET
NOV 10, 2021
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
640-14-123P
VA Palo Alto Health Care System
3801 Miranda Ave. Palo Alto, CA 94304-1290
AESUS
B7
WING D
WING F
WING E
WING A
GI-001
PROJECT DATA, CODE, INFORMATION,
SYMBOL LEGEND
PROJECT TEAM
MATERIALSSYMBOLS & LEGENDS
PROJECT AREA & OCCUPANCY
LEVEL
TOTAL FLOOR
AREA SCOPE OF WORK AREA OF WORK PREDOMINENT OCCUPANCY
FIRST
FLOOR
116,495 SF PROJECT AREA 17,004 SF CHAPTER 19 - EXISTING HEALTHCARE
CONSTRUCTION REQUIREMENTS
BUILDING ELEMENT
FIRE-RESISTANCE RATING
FIRE RESISTIVE ASSEMBLYPER NFPA 220
PER IBC 2012
TABLE 601
TYPE II (000) TYPE IIB
PRIMARY STRUCTURAL FRAME 0 HOUR
PRIMARY STRUCTURAL FRAME - ROOF ONLY 0 HOUR
BEAMS, GIRDERS, TRUSSES 0 HOUR
COLUMNS - MULTIPLE FLOORS 0 HOUR
COLUMNS - ROOF ONLY 0 HOUR
FLOOR CEILING ASSEMBLIES 0 HOUR 0 HOUR
ROOF ASSEMBLIES 0 HOUR
FIRST FLOOR ROOM SCHEDULE
ROOM NUMBER ROOM NAME AREA (NSF)
A119 LIVING/ DINING 389 SF
A119A CLOSET 23 SF
A119B BEDROOM 169 SF
A119C CLOSET 22 SF
A119D CLOSET 9 SF
A119E BATH 95 SF
A119F KITCHEN 167 SF
A120 OFFICE 350 SF
A121 STAFF LOUNGE 332 SF
A121A STAFF TOILET 70 SF
A121B ADA PUBLIC TOILET 70 SF
A123 OFFICE 172 SF
A123A EXERCISE PHYSIOLOGY 436 SF
A124 CONFERENCE 432 SF
A125 OFFICE 224 SF
A126 BONE DENSITY 380 SF
A126A STORAGE 142 SF
A-CO3 CORRIDOR 698 SF
A-CO4 CORRIDOR 686 SF
A-CO5 CORRIDOR 189 SF
D106 ALCOVE 269 SF
D106A OFFICE 91 SF
D106B DIRTY UTILITY 35 SF
D107 OT ASSISTIVE TECH LAB 270 SF
D108 OFFICE 105 SF
D109 THERAPY GYM 2174 SF
D109B ADL TRAINING KITCHEN 173 SF
D110 ADL TRAINING BATHROOM 113 SF
D113 QUIET 166 SF
D114 THERAPIST OFFICE 530 SF
D115 THERAPY EQUIPMENT STORAGE 678 SF
D135 PATIENT ADA TOILET 73 SF
D180 STORAGE 1555 SF
D-CO1 CORR. 821 SF
D-CO3 CORRIDOR 176 SF
D-CO4 CORRIDOR 676 SF
E145 OUTPATIENT THERAPY 1363 SF
E145A THERAPIST OFFICE 172 SF
E145B QUIET 167 SF
E145H EQUIPMENT STORAGE 412 SF
E146 HOME CARE OFFICE 545 SF
E147 HOME CARE STORAGE 240 SF
F137 UPPER EXTREMITY EXAM 252 SF
TOTAL SQUARE FOOTAGE 16108 SF
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Renovate B7 SCI - Refresh Project
Location:
FINAL BID SET
NOV 10, 2021
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
640-14-123P
VA Palo Alto Health Care System
3801 Miranda Ave. Palo Alto, CA 94304-1290
AESUS
B7
WING D
WING F
WING E
WING A
GI-002
SHEET INDEX
MD-240 PARTIAL FIRST FLOOR DEMO MECHANICAL DUCT PLAN - D WING
MD-250 PARTIAL ROOF DEMOLITION PLAN - E-F-C WING
MH-210 PARTIAL MECHANICAL FLOOR PLAN - E/F/C WING
MH-220 PARTIAL MECHANICAL FLOOR PLAN - A/B/D WING
MH-240 PARTIAL MECHANICAL FLOOR PLAN - D WING
MH-250 PARTIAL ROOF PLAN E/F/C WING
MH-300 MECHANICAL DETAILS
MH-400 CONTROL DIAGRAM
MP-210 PARTIAL MECHANICAL PIPING PLAN - E/F/C WING
MP-220 PARTIAL MECHANICAL PLAN - A/B/D WING
MP-240 PARTIAL MECHANICAL PIPING PLAN - D WING
PLUMBING
PP-001 LEGEND, SCHEDULES, GENERAL NOTES
PD-210 PARTIAL FIRST FLOOR DEMO PLUMBING PLAN - E/F/C WING
PD-220 PARTIAL FIRST FLOOR DEMO PLUMBING PLAN - A/B/D WING
PD-240 PARTIAL FIRST FLOOR DEMO PLUMBING PLAN - D WING
PP-210 PARTIAL FIRST FLOOR PLUMBING PLAN - E/F/C WING
PP-220 PARTIAL FIRST FLOOR PLUMBING PLAN - A/B/D WING
PP-240 PARTIAL FIRST FLOOR PLUMBING PLAN - D WING
PL-301 PLUMBING DETAILS
ELECTRICAL
E-001 LEGEND AND GENERAL NOTES
ED-210 PARTIAL ELECTRICAL DEMOLITION PLAN -E/F/C WING
ED-220 PARTIAL ELECTRICAL DEMOLITION PLAN - A/B/D WING
ED-240 PARTIAL ELECTRICAL DEMOLITION PLAN - D WING
EL-011 LIGHTING FIXTURE SCHEDULE
EL-210 PARTIAL LIGHTING PLAN - E/F/C/ WING
EL-220 PARTIAL LIGHTING PLAN - A/B/D WING
EL-240 PARTIAL LIGHTING PLAN - D WING
EP-210 PARTIAL POWER PLAN - E/F/C WING
EP-220 PARTIAL POWER PLAN - A/B/D WING
EP-240 PARTIAL POWER PLAN - D WING
E-311 SINGLE LINE DIAGRAM - NORMAL POWER
E-312 SINGLE LINE DIAGRAM - EMERGENCY POWER
E-501 DETAILS
E-502 DETAILS
E-611 PANEL BOARD SCHEDULES
E-612 PANEL BOARD SCHEDULES
TND-210 PARTIAL SIGNAL DEMOLITION PLAN - E/F/C WING
TND-220 PARTIAL SIGNAL DEMOLITION PLAN - A/B/D WING
TND-240 PARTIAL SIGNAL DEMOLITION PLAN - D WING
TN-210 PARTIAL SIGNAL PLAN - E/F/C WING
TN-220 PARTIAL SIGNAL PLAN - A/B/D
TN-230 PARTIAL SIGNAL PLAN - F WING
TN-240 PARTIAL SIGNAL PLAN - D WING
FIRE ALARM
FA-001 FIRE ALARM LEGENDS AND GENERAL NOTES
FAD-210 PARTIAL FIRE ALARM DEMOLITION PLAN - E/F/C WING
FAD-220 PARTIAL FIRE ALARM DEMOLITION PLAN - A/B/D WING
FAD-240 PARTIAL FIRE ALARM DEMOLITION PLAN - D WING
FA-210 PARTIAL FIRE ALARM PLAN - E/F/C WING
FA-220 PARTIAL FIRE ALARM PLAN - A/B/D WING
FA-240 PARTIAL FIRE ALARM PLAN - D WING
FA-311 FIRE ALARM RISER DIAGRAM
FA-501 FIRE ALARM DETAILS
FA-611 FIRE ALARM CACULATIONS
FIRE PROTECTION
FS-210 PARTIAL FIRST FLOOR FIRE SPRINKLER PLAN - E/F/C WING
FS-220 PARTIAL FIRST FLOOR FIRE SPRINKLER PLAN - A-B-D WING
FS-240 PARTIAL FIRST FLOOR FIRE SPRINKLER PLAN - D WING
GENERAL
GI-001 PROJECT DATA, CODE, INFORMATION, SYMBOL LEGEND
GI-002 SHEET INDEX
GI-211 CODE COMPLIANCE - SMOKE COMPARTMENT PLANS
ARCHITECTURAL
AS-100 FIRST FLOOR EXISTING PLAN
AD-101 PHASING / DEMOLITION PLAN
AD-102 INTERUM LIFE SAFETY PLAN - PHASE 1
AD-103 INTERUM LIFE SAFETY PLAN - PHASE 2
AD-104 INTERUM LIFE SAFETY PLAN - PHASE 3
AS-200 FIRST FLOOR KEY PLAN
AS-210 PARTIAL FIRST FLOOR PLAN - E/F/C WING
AS-220 PARTIAL FIRST FLOOR PLAN - A/B/D WING
AS-240 PARTIAL FIRST FLOOR PLAN - D WING
AS-250 ROOF PLAN
AS-500 INTERIOR ELEVATIONS
AS-501 INTERIOR ELEVATIONS
AS-610 PARTIAL REFLECTED CEILING PLAN - E/F/C WING
AS-620 PARTIAL REFLECTED CEILING PLAN - A/B/D/ WING
AS-640 PARTIAL REFLECTED CEILING PLAN - D WING
AS-910 TYPICAL INTERIOR FRAMING DETAILS
AS-911 TYPICAL INTERIOR FRAMING DETAILS & ROOF DETAILS
AS-912 PARTITION SCHEDULE & DETAILS
AS-920 DOOR & GLAZING SCHEDULES & DETAILS
AS-930 TYPICAL CEILING & SOFFIT DETAILS
AS-931 CEILING DETAILS
AS-940 TYPICAL CASEWORK & MILLWORK DETAILS
AS-941 CASEWORK DETAILS & MEDICAL EQUIP. ANCHORAGE SCHEDULE
AS-950 FIRE RATED ASSEMBLIES - U419, BW-S-0001, BW-S-0023
AS-951 FIRE RATED ASSEMBLIES - HW-D-0538, HW-D-0539
AS-952 FIRE RATED ASSEMBLIES - HW-D-0388, HW-D-0218
AS-953 FIRE RATED ASSEMBLIES - HW-D-0259, HW-D-0634
AS-954 FIRE RATED ASSEMBLIES - HW-D-0639
AS-955 FIRE RATED ASSEMBLIES - W-L-1222, W-L-5073, W-L-8081, C-AJ-3214, C-AJ-3260, C-AJ-3285
AF-200 FIRST FLOOR FINISH SCHEDULES
AF-210 PARTIAL FIRST FLOOR FINISH PLAN - E/F/C WING
AF-220 PARTIAL FIRST FLOOR FINISH PLAN - A/B/D WING
AF-240 PARTIAL FIRST FLOOR FINISH PLAN - D WING
AG-210 PARTIAL FIRST FLOOR SIGNAGE PLAN - E/F/C WING
AG-220 PARTIAL FIRST FLOOR SIGNAGE PLAN - A/B/D WING
AG-240 PARTIAL FIRST FLOOR SIGNAGE PLAN - D WING
AG-910 SIGNAGE DETAILS & SCHEDULE
QH-210 PARTIAL FIRST FLOOR EQUIPMENT PLAN - E/F/C WING
QH-220 PARTIAL FIRST FLOOR EQUIPMENT PLAN - A/B/D WING
QH-240 PARTIAL FIRST FLOOR EQUIPMENT PLAN - D WING
QH-250 FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE
QH-251 FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE
STRUCTURAL
S-101 GENERAL STRUCTURAL NOTES AND SPECIAL INSPECTION MATRICES
S-201 PARTIAL CEILING PLANS AND DETAILS
S-301 FRAMING DETAILS 201-215
MECHANICAL
MH-001 MECHANICAL LEGENDS, NOTES, ABBREVIATIONS & SCHEDULE
MH-002 MECHANICAL SCHEDULES
MD-210 PARTIAL FIRST FLOOR DEMO MECHANICAL DUCT PLAN - E-F-C WING
MD-220 PARTIAL FIRST FLOOR DEMO MECHANICAL DUCT PLAN - A-B-D WING
DN
OFFICE
OFFICE
CONFERENCE
EXERCISE
PHYSIOLOGY
ADA
PUBLIC
TOILET
STAFF
TOILET
OFFICE
STAFF
LOUNGE
BEDROOM
BONE
DENSITY
THERAPY
GYM
ADL
TRAINING
BATHROOM
QUIET
THERAPIST
OFFICE
THERAPY
EQUIPMENT
STORAGE
OFFICE
OT
ASSISTIVE
TECH LAB
CORR.
KITCHEN
BATH
LIVING/
DINING
CLOSET
CLOSET
CLOSET
STAIR
ELEC. EEG TEST
ROOM
OFFICE
OFFICE WOMENS
TELE/DATA
OFFICE
WOMENS
MENS
OFFICE OFFICE CONFERENCE EXAM
ROOM 04
EXAM
ROOM 03
OFFICE/
STORAGE
OFFICE/
STORAGE
EXAM
ROOM 02
EXAM
ROOM 01OFFICERECEPTION
PATIENT
WAIT AREA
CORRIDOR
MEETING
ROOM
OFFICE
OFFICE
STORAGE
TREATMENT
ROOM
TREATMENT
ROOM
DAY ROOM
OFFICE
OFFICE
OFFICE
KITCHEN
OFFICE/LAB
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LAB
COPY/
STORAGE
OFFICE
CORRIDOR
CORR.
LAB
STORAGE
OFFICE
STORAGE
EQUIP.
STORAGE
LAB
LASER LAB
STORAGESTORAGE
NEURO
LAB
STORAGE LAB
STOR.
CLO.
TOILETTOILET
STORAGE
REFRIG
LAB
LAB
LAB
LAB
STORAGE
TELE/DATA
RESTROOMRESTROOM
CORRIDORCORRIDORCORR.
CORRIDOR
CORRIDOR
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
BATH
NOURISH
PATIENT
BATH
PATIENT
BATH
CONF/CLASS
ROOM
DINING
ROOM
BIOHAZARD
SUPPLY
ROOM
SCI
STORAGE
JAN
LINEN
ROOM
MED ROOM
CORR.
CORRIDOR
EXAM
EXAM
EXAM
WAITING
ROOM
CORR.
STOR RESTROOM
SOILED
UTILITY
JAN
UPPER
EXTREMITY
EXAM
CORRIDOR
STORAGE
OFFICE
OFFICE
OFFICE
KITCHEN
STORAGE
ADMIN
BREAK CORRIDOR
CORR. KITCHEN
OPEN
OFFICE
OFFICE
OFFICE
EXAMCYSTO
HALLWAY
OFFICE
CORRIDOR
OFFICE
CORRIDOR
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
RECEPTION
TOILET TOILET
PVA
OFFICE
CORR.
PATIENT
ADA
TOILET
JAN.
STOR
ELEC.
TELE DATA CORRIDOR
STORAGE
REC
THERAPY
STORAGE
POOL
STORAGE
EQUIP
ROOM B
ELEC.
EQUIP
ROOM A
REST
ROOM
CORRIDOR
PVA
OFFICE
OFFICE
SCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BED
SCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BED
SCI/D BED
PATIENT
LITTER
BATHROOM
ELEC
ROOM
IT ROOM
MED EQUIP
STORAGE
QUIET
ROOM
DAY ROOM
WORK
STATIONS
NURSE
STATION
MEDICATION
DOCUMENT
CONTROL
OFFICE
NOURISHMENTPUBLIC
TOILET
BREAK
ROOM
CORR.
CORRIDOR
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LAUNDRY
SOILED
UTILITY/
LINEN
PATIENT
LITTER
BATHROOM
SCI/D BED SCI/D BED
PATIENT
LITTER
BATHROOM
CLEAN
UTILITY
CLEAN
LINEN
PUBLIC
TOILET
HOUSE
KEEPING
CORRIDOR
OUTPATIENT
THERAPY
HOME
CARE
OFFICE
HOME
CARE
STORAGE
VESTIBULE
HAC
JAN
ELEC.
CORRIDOR
FINAL LOCATION AND EXTENT OF FUTURE
EXTERIOR WALL TO BE DESIGNED AND
CONSTRUCTED UNDER SEPARATE PROJECT.
EXISTING SMOKE COMPARTMENT TO BE
RELOCATED TO NEW WALL.
EXIT
F-A
EXIT
E-A
EXIT
E-B
EXIT
C-A
EXIT
A-A
EXIT
A-B
EXIT
B-C
EXIT
B-B
EXIT
B-A
EXIT
H-A
EXIT
H-B
EXIT
H-C
EXIT
D-B
EXIT
F-C
EXIT
F-D
EXIT
F-B
SCTR-A1
SCTR-B1
SCTR-D1
EXIT
D-A
EXIT
D-C
EXIT
D-D
EXIT
C-B
EXIT
A-C
DAY ROOM
NURSE
STATION
CORRIDOR
ISOLATION
ROOM
ANTE
RESTROOM
ENTRY
NURSE
REPORT 01
INPATIENT
STAFF
LOUNGE
PATIENT
RESTROOM
RESTROOM
PATIENT PATIENT
RESTROOM
TELE/DATA
PATIENT
CORR.
PATIENT
RESTROOM
RESTROOM
PATIENT
CORRIDOR
TOILET
ASST.
NURSE
MANAGERS
(2)
OXY
STORAGE
ELEC
LAUNDRY
ROOM
WOMENS
LOCKER
MENS
LOCKER
CLINICAL
DIETICS
OFFICE
PATIENT PATIENT PATIENT PATIENT PATIENT PATIENT
RESTROOM
RESTROOM
PATIENT PATIENT PATIENT PATIENT
RESTROOM
RESTROOM
CORRIDOR
REST
ROOM
SOILED
UTIL.
BATHROOM
RESTROOM
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
LOUNGE
OFFICE
OFFICE
(PATIENT)
OFFICE
OFFICE
(PATIENT)
OFFICE
(PATIENT)
OFFICE
OFFICE
OFFICE
OT/PT/EEG
LAB
COPY
STORAGE
OFFICE OFFICE
CORRIDOR
OFFICE OFFICE OFFICE EEG TEST
ROOM
STOR.
PATIENT
LINEN
SOILED
LINEN
DAY ROOM
TOILET
DAY ROOM
STORAGE
DAY ROOM
STORAGE
ELEC
ACT DAILY
LIVING APT
RESTROOM
BEDROOM
BONE
MEASURE
LAB
EMS
PM&R
RESIDENTS
OFFICE
PSYCH
OFFICE -
NEURO-REHAB
SCI NURSE
MANAGER
OFFICE
SOCIAL
WORK
OFFICE
SOCIAL
WORK
OFFICE
ADMIN
STORAGE
RESEARCH
& SCI
SECRETARY
ADMIN.
STORAGE
PT/OT
OFFICES
(10WORKSTATIONS)
SCI
RESEARCH
OFFICE
PT/OT
QUIET
TREATMENT
ELEC
ELEC/FIRE/DATA
REC.THERAPY
& PEER
SUPPORT
OFFICE
CONFERENCE
ROOM
OT
ASSISTIVE
TECHNOLOGY
LAB
LAUNDRY
ROOM
PT/OT
THERAPY
EQUIP
STORAGE
SOILED
UTIL
ADL ROOMBATH
EQUIPMENT
STORAGE
TOILET
SUPPLY
ROOM
SOILED
UTIL.
GURNEY
STORAGE
PHARMACY
OFFICE
CLINICAL
OUTCOMES
AND
VOCATIONAL
REHAB
OFFICE
NURSE
EDUCATOR
INPATIENT
CLINICAL
NURSE
SPECIALIST
WOMENS
TOILET
JAN STORAGE
NURSE
STATION
LAUNDRY
PT/OT
THERAPY
CORRIDOR
ALCOVE
ENTRY
ADL
TRAINING
KITCHEN
QUIET
THERAPIST
OFFICE
FEC
FEC
FEC
FEC
4bs
4bs
4bs
4b
4b
SMOKE
COMPARTMENT
E/F
SMOKE
COMPARTMENT F
SMOKE
COMPARTMENT
C/E/F
SMOKE
COMPARTMENT
A
SMOKE
COMPARTMENT
D
SMOKE
COMPARTMENT
H
SMOKE
COMPARTMENT
B
1/2 HOUR FIRE RATED
SMOKE BARRIER PER
NFPA 19.3
SMOKE BARRIER TRAVEL
DISTANCE PER NFPA 101
19.3.7.1 (1)
SCTR-10
PATH OF TRAVEL
NUMBER
SMOKE-RATED
CORRIDOR PER NFPA
19.3.6.2
2 HOUR HORIZONTAL
EXIT/SMOKE BARRIER
EGRESS PATH OF TRAVEL
BUILDING EXIT OR
HORIZONTAL EXIT
ETR-1
PATH OF TRAVEL
NUMBER
EXIT
L3-A
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Renovate B7 SCI - Refresh Project
Location:
FINAL BID SET
NOV 10, 2021
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
640-14-123P
VA Palo Alto Health Care System
3801 Miranda Ave. Palo Alto, CA 94304-1290
AESUS
B7
WING D
WING F
WING E
WING A
GI-211
CODE COMPLIANCE - SMOKE
COMPARTMENT PLANS
SCALE: 1/16" = 1'-0"
5 SMOKE COMPARTMENT AND EGRESS PLAN
SMOKE COMPARTMENT TRAVEL DISTANCE...
PATH OF TRAVEL NUMBER DISTANCE
SCTR-A1 167' - 3"
SCTR-B1 104' - 7"
SCTR-CEF 13' - 3"
SCTR-D1 149' - 6"
SCTR-EF1 12' - 0"
SMOKE COMPARTMENT SIZE (NFPA 101 SECTION 19.3.7.1)
SMOKE COMPARTMENT AREA
SMOKE COMPARTMENT A 14,582 SF
SMOKE COMPARTMENT B 12,562 SF
SMOKE COMPARTMENT C/E/F 5,713 SF
SMOKE COMPARTMENT D 12,577 SF
SMOKE COMPARTMENT E/F 12,505 SF
SMOKE COMPARTMENT F 18,330 SF
SMOKE COMPARTMENT H 10,886 SF
LEGEND
EXITS PROVIDED (NFPA 101 - SECTION 7.1.2.2)
EGRESS
COMPONENT
OCCUPANT
LOAD
DISTRIBUTION
TOTAL
OCCUPANT
LOAD
EXIT WIDTH
REQUIRED PROVIDED
A-A 1/3A 61 12.2" 48"
A-B 1/3A 61 12.2" 48"
A-C 1/3A 61 12.2" 88"
B-A 1/3B 59 11.8" 72"
B-B 1/3B 59 11.8" 72"
B-C 1/3B 58 11.6" 42"
C-A 1/3C 16 3.2" 72"
C-B 1/3C 16 3.2" 88"
D-A 1/4D 59 11.8" 88"
D-B 1/4D 59 11.8" 42"
D-C 1/4D 58 11.6" 72"
D-D 1/4D 58 11.6" 88"
E-A 1/2E 29 5.8" 88"
E-B 1/2E + 1/3C 45 9.0" 88"
F-A 1/4F 101 20.1" 72"
F-B 1/4F 101 20.1" 88"
F-C 1/4F 101 20.1" 88"
F-D 1/4F 101 20.1" 80"
H-A 1/3H 31 6.2" 48"
H-B 1/3H 30 6.0" 48"
H-C 1/3H 30 6.0" 48"
EGRESS ZONE OCCUPANT LOAD
Egress Zone Occupant Load
Egress Zone A 177
Egress Zone B 175
Egress Zone C 49
Egress Zone D 237
Egress Zone E 56
Egress Zone F 404
Egress Zone H 91
61012
161718
A
B
C
D
F
Q
R
S
U
V
CC
GG
LL
PP
D.2
K.1
N.1
Q.1
S.1
U.1
V.1
X.1
CC.1
GG.1
PP.1
38.1
38.142.147.149.149.4
50.1
50.1
49.2
S.12
S.14
S.15
S.16
5.8
6.5
S.18
S.19
S.20 S.22 S.23 S.24 S.25 S.28
TOILET
A102A
TOILET
A102
STORAGE
A106B
LAB
A106
STOR.
A106A
CLO.
A107B
STORAGE
A107C
STORAGE
A107A
NEURO LAB
A107
LAB
A138
LAB
A134
REFRIG
A136
STORAGE
A137
LASER LAB
A108
LAB
A109
LAB
A133
LAB
A132
EQUIP
STORAGE
A113
STORAGE
A114
OFFICE
A115
STORAGE
A115A
LAB
A131
SCI ADMIN
STORAGE
A128
REST ROOM
A127A
REST ROOM
A127
TELE/
DATA
A129
POLYTRAUMA
THERAPY
OFFICE
A123B
POLYTRAUMA
KITCHEN
A123D
POLYTRAUMA
THERAPY
TREATMENT
A123
BATHROOM
A123A
JANITOR
A124
QUIET
ROOM
A123F
ELEC
A118
OFFICE
A119
OFFICE
A119A
OFFICE
A120
OFFICE
A120A
OFFICE
A121
CORRIDOR
A-CO1
CORR.
A-CO2
CORRIDOR
A-CO3
STAIRS
CORRIDOR
A-CO5
CORR.
A-CO6
CORRIDOR
A-CO7
CORRIDOR
A-CO8
OFFICE
B101
OT/PT/EEG
LAB
B102
STORAGE
B102A
COPY
B102B
OFFICE
B103
OFFICE
B103A
OFFICE
B103B
MENS
B104
WOMENS
B104A
TELE/
DATA
B104B
OFFICE
B105
OFFICE
B105A
OFFICE
B106
OFFICE
B107
OFFICE
B108A
LAB
B108B
COPY/
STORAGE
B108C
OFFICE
B108D
OFFICE
B108E
OFFICE
B108F
OFFICE
B109
KITCHEN
B110
OFFICE/LAB
B111
OFFICE
B112
OFFICE
B114
OFFICE
B115
OFFICE
B117A
CONFERENCE
B117
EXAM
ROOM 04
B118F
EXAM
ROOM 03
B118E
OFFICE/
STORAGE
B118E2
OFFICE/
STORAGE
B118E1
EXAM
ROOM 02
B118D
EXAM
ROOM 01
B118C
OFFICE
B118B
OFFICE
B118A
PATIENT
WAIT AREA
B120
WOMENS
B121B
MENS
B121A
DAY ROOM
B124A
TREATMENT
ROOM
B124B
TREATMENT
ROOM
B124C
STORAGE
B124H
OFFICE
B124E
OFFICE
B124F
MEETING
ROOM
B124G
OFFICE
B125
EEG TEST
ROOM
B126
EEG TEST
ROOM
B128
OFFICE
B129
OFFICE
B130
OFFICE
B131
CORRIDOR
B-CO2
CORRIDOR
B-CO3A
CORRIDOR
B-CO3B
CORRIDOR
B-CO5
CORR.
B-CO4
CORRIDOR
B-CO7
CORR.
B-CO6
CORR.
B-CO8
CORRIDOR
B-CO9
TOILET
B127
CORRIDOR
B-CO1
PHYSICIAN
C101
STAFF
PHYSICIAN
C102
RESEARCH
OFFICE
C103
NURSE
PRACTITIONER
OFFICE
C104
STAFF
PHYSICIANS
(2) C105
FELLOWS
(2) C106
INPATIENT
PSYCH
OFFICE
C108
ADMIN.
OFFICER
OFFICE
C110
PHYSICIAN
OFFICE
C112
PROGRAM
SUPPORT
OFFICE
C114
SCI
LIBRARY/
CONFERENCE
C115
ENDOWMENT
CHAIR'S
OFFICE
C115A
SCI CHIEF
OFFICE
C115B
OFFICE
A122A
OFFICE
D101A
OFFICE
(PATIENT)
D102
OFFICE
(PATIENT)
D103
OFFICE
D104
OFFICE
(PATIENT)
D105
MED ROOM
D106A
NURSE
STATION
D106
LUNCH
ROOM
D108
OFFICE
D108A
CONFERENCE
ROOM
D108B
ENTRY
D108C
KITCHEN
D109
LINEN
ROOM
D111
SUPPLY
ROOM
D112
RESTROOM
D113
RESTROOM
D115A
PATIENT
ROOM
D115
PATIENT
D116
RESTROOM
D116A
PATIENT
D117
RESTROOM
D117A
PATIENT
D118
REST ROOM
D118A
PATIENT
D119
REST ROOM
D119A
PATIENT
D120
REST ROOM
D120A
PATIENT
LAUNDRY
D121
TELE DATA
D122
ELEC.
D123
STOR.
D124
PATIENT
D125
REST ROOM
D125A
PATIENT
D126
REST ROOM
D126A
PATIENT
D127BATH
ROOM
D128
PATIENT
D129
PATIENT
D130
PATIENT
D131
REST ROOM
D131A
SOILED
UTIL ROOM
D132
PATIENT
D133
REST ROOM
D133A PATIENT
D134
REST ROOM
D134A
TOILET
D135
HAC
D136
LOUNGE
D138
TOILET
D137
OFFICE
D139
OFFICE
D139A
OFFICE
D140
CORR.
D-CO1
CORRIDOR
D-CO2
CORRIDOR
D-CO3
CORRIDOR
D-CO4
CORRIDOR
C-CO1
CORRIDOR
D-CO5
PVA INFO
DESK
E101
STOR.
E102
WOMENS
TOILET
E103
MENS
TOILET
E104
PATIENT
E105
RESTROOM
E105A
PATIENT
E106
RESTROOM
E106A
PATIENT
E107
RESTROOM
E107A
LINEN
E108
NOURISH
E109
SOILED
LINEN
E110
DAY ROOM
E111
TOILET
E112
MED ROOM
E113A
DAY ROOM
STORAGE
E114
DAY ROOM
STORAGE
E114A
DAY ROOM
STORAGE
E114B
ELEC
E125
ACT DAILY
LIVING APT
E126
KITCHEN
E126A
RESTROOM
E126B
BEDROOM
E126C
BONE
MEASURE
LAB
E127
EMS
E128
PM&R
RESIDENTS
OFFICE
E129
PSYCH
OFFICE
NEURO
REHAB
E130
SCI NURSE
MANAGER
OFFICE
E131
SOCIAL
WORK
OFFICE
E132
EXERCISE
PHYSIOLOGY
LAB
E133
SOCIAL
WORK
OFFICE
E134
ADMIN
STORAGE
E135
RESEARCH
& SCI
SECRETARY
E135A
ADMIN
STORAGE
E135B
PT/OT
OFFICES
(10WORKSTATIONS)
E137
SCI
RESEARCH
OFFICE
E138A
PT/OT
QUIET
TREATMENT
E138B
ELEC
E139
ELEC/FIRE/DATA
E140
REC.THERAPY
& PEER
SUPPORT
OFFICE
E141
CONFERENCE
ROOM
E142
OT
ASSISTIVE
TECHNOLOGY
LAB
E143
LAUNDRY
ROOM
E143B
PT/OT
THERAPY
E145
PT/OT
THERAPY
E145A
EQUIP
STORAGE
E145B
SOILED
UTIL
E145C
CLEAN UTIL
E145D
ADL ROOM
E145F
BATH
E145G
EQUIPMENT
STORAGE
E145H
TOILET
E145I
SUPPLY
ROOM
E146
SOILED
UTIL
E147
GURNEY
STORAGE
E148
PHARMACY
OFFICE
E149
CLINICAL
OUTCOMES
AND
VOCATIONAL
REHAB
OFFICE
E150
NURSE
EDUCATOR
INPATIENT
CLINICAL
NURSE
SPECIALIST
E151
WOMENS
TOILET
E152
JAN
E153
STORAGE
E148B
NURSE
STATION
E113
CORRIDOR
E-CO1
CORRIDOR
E-CO2
CORRIDOR
E-CO3
CORRIDOR
E-CO4
CORR.
E-CO5
CORR.
E-CO6
CORR.
E-CO7
CORR.
E-CO8
CORRIDOR
E-CO9
PATIENT
F101
RESTROOM
F101A
PATIENT
F102
RESTROOM
F102A
PATIENT
F103
RESTROOM
F103A
LINEN
ROOM
F104
PATIENT
PANTRY
F105 MED ROOM
F106
TOILET
F107
DAY ROOM
F108
NURSE
STATION
F109
MED ROOM
F109A
ANTE
F110ISOLATION
ROOM
F110A
RESTROOM
F110B
NURSE
REPORT 01
F111
INPATIENT
STAFF
LOUNGE
F112
PATIENT
F113
REST-
ROOM
F113A
PATIENT
F114
REST-
ROOM
F114A
PATIENT
F115
REST-
ROOM
F115A
TELE/
DATA
F116
PATIENT
F117
PATIENT
F118
REST-
ROOM
F118A
PATIENT
F120
REST ROOM
F120A
PATIENT
F121
RESTROOM
F121A
PATIENT
F122
OXY
STORAGE
F123
LAUNDRY
ROOM
F123A
CLINICAL
DIETICS
OFFICE
F124
WOMENS
LOCKER
F124A
MES
LOCKER
F124B
WOMENS
TOILET
F124C
MENS
TOILET
F124D
CONF/CLASS
ROOM
F125
ELEC
F125A
DINING
ROOM
F126
NURSING
SUPPLY
ROOM
F127
SOILED
UTILITY
F128
ASST.
NURSE
MANAGERS
(2) F129
INPATIENT
AND
OUTPATIENT
STORAGE
F130
JAN
F131
EXAM
F132 EXAM
F133
REST ROOM
F134
SOILED
UTIL
F135
JAN
F136
UPPER
EXTREMITY
EXAM
F137
EXAM
ROOM
F138
CYSTOSCOPIC
F139
CYSTO
STORAGE
F139B
PSYCH
EXAM
F140
EXAM
F141
WAITING
ROOM
F142
COPY/ FILE
F143
NURSE
MANAGER
F143A
OUTPATIENT
OPEN
OFFICE
F144
OUTPATIENT
SOCIAL
WORK
OFFICE
F144A
OUTPATIENT
PSYSCH
OFFICE
F144B
HAC
F126B
RETHERM
KITCHEN
F126C
HAC
F126C
KITCHEN
STORAGE
F126D
CASE
MANAGER
F126K
CASE
MANAGER
F126J
CASE
MANAGER
F126H
ADMIN.
STAFF
LOUNGE
F-126L
ELEC
F126A
CORR.
F-CO1
CORRIDOR
F-CO2
CORRIDOR
F-CO3
ENTRY
F-CO4
CORRIDOR
F-CO5
CORR.
F-CO6
CORRIDOR
F-CO7
CORR.
F-CO8
CORRIDOR
F-CO9
CORR.
F-CO10
CORRIDOR
F-CO11
CORR.
F-CO12
ENTRY
F-CO13
CORRIDOR
F-CO14
CORRIDOR
F-CO15
CORR.
F-CO16
CORR.
F-CO17
HALL
F-CO18
CLOSET
F144D
ACTIVITY
CENTER
STORAGE
STORAGE
EQUIP
ROOM B
ELEC
EQUIP
ROOM A
REST ROOM
DECK
POOL B
107C
POOL A
107B
PATIENT
LAUNDRY
G-100
SOILED
UTILITY/
LINEN
G-101
SCI/D BED
G-150
PATIENT
LITTER
BATHROOM
G-150A
SCI/D BED
G-102
PATIENT
LITTER
BATHROOM
G-102A
SCI/D BED
G-149
PATIENT
LITTER
BATHROOM
G-149A
SCI/D BED
G-103
PATIENT
LITTER
BATHROOM
G-103A
SCI/D BED
G-148
PATIENT
LITTER
BATHROOM
G-148A
CLEAN
UTILITY
G-105
CLEAN
LINEN
G-106
SCI/D BED
G-147
PATIENT
LITTER
BATHROOM
G-147A
PUBLIC
TOILET
G-110
PUBLIC
TOILET
G-113
HOUSE
KEEPING
G-111
DOCUMENT
CONTROL
G-117
SCI/D BED
G-146
PATIENT
LITTER
BATHROOM
G-146A
NOURISHMENT
G-114
OFFICE
G-116
SCI/D BED
G-145
PATIENT
LITTER
BATHROOM
G-145A
SCI/D BED
G-139
PATIENT
LITTER
BATHROOM
G-139A
MEDICATION
G-118
BREAK
ROOM
G-112
SCI/D BED
G-138
PATIENT
LITTER
BATHROOM
G-138A
DAY ROOM
G-125
QUIET
ROOM
G-126
SCI/D BED
G-137
PATIENT
LITTER
BATHROOM
G-137A
IT ROOM
G-128A
ELEC ROOM
G-129
SCI/D BED
G-136
PATIENT
LITTER
BATHROOM
G-136A
SCI/D BED
G-135
PATIENT
LITTER
BATHROOM
G-135A
MED EQUIP
STORAGE
G-127
CORR.
GC-3
ALCOVE
GC-3B
ALCOVE
GC-3A
NURSE
STATION
G-115
ALCOVE
GC-1C
ALCOVE
GC-1B
ALCOVE
GC-1A
CORRIDOR
GC-1
WORK
STATIONS
G-120
CORR.
GC-2
SIGNALS
G-128
LAUNDRY
E126D
CORR.
A-C02A
CORR.
E-C01
PT/OT
THERAPY
E145J
REC
THERAPY
YARD
SCI CLERK/
RECEPTION
A-C02B
LOCKER
VESTIBULE
F-126M
Y.1
OFFICE
D101
OFFICE
107E
EJ
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Renovate B7 SCI - Refresh Project
Location:
FINAL BID SET
NOV 10, 2021
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
640-14-123P
VA Palo Alto Health Care System
3801 Miranda Ave. Palo Alto, CA 94304-1290
AESUS
B7
WING D
WING F
WING E
WING A
AS-100
FIRST FLOOR EXISTING PLAN
SCALE: 1/16" = 1'-0"
5 FIRST FLOOR - EXISTING
161718
A
B
C
D
F
Q
R
S
U
V
CC
FF
GG
JJ
LL
PP PP
D.2
K.1
N.1
U.1
V.1
X.1
CC.1
GG.1
PP.1
38.1
38.149.149.4
50.1
50.1
49.2
S.17
S.18
S.19
S.20
Y.1
AD-101
EXISTING TOILET &
SINK TO REMAIN
PATIENT
TOILET TOILET
STORAGE
LAB
STOR.
CLO. STORAGE STORAGE
NEURO
LAB
LAB
LAB
REFRIG
STORAGE
LASER LAB
LAB
LAB
LAB
EQUIP
STORAGE
STORAGE
OFFICE
STORAGE
LAB
SCI ADMIN
STORAGE
REST
ROOM
REST
ROOM
TELE/
DATA
POLYTRAUMA
THERAPY
OFFICE
POLYTRAUMA
KITCHEN
POLYTRAUMA
THERAPY
TREATMENT
BATHROOM JANITOR
QUIET
ROOM
ELECOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
CORR.
CORRIDOR
STAIRS
CORRIDOR
CORR.
CORRIDOR
CORRIDOR
OFFICE
OT/PT/EEG
LAB
STORAGE
COPY
OFFICE OFFICE
EEG TEST
ROOMOFFICEOFFICEOFFICE
CORRIDOR
PHYSICIAN
STAFF
PHYSICIAN
RESEARCH
OFFICE
NURSE
PRACTITIONER
OFFICE
STAFF
PHYSICIANS
(2)
FELLOWS
(2)
INPATIENT
PSYCH
OFFICE
ADMIN.
OFFICER
OFFICE
PHYSICIAN
OFFICE
PROGRAM
SUPPORT
OFFICE
SCI
LIBRARY/
CONFERENCE
ENDOWMENT
CHAIR'S
OFFICE
SCI CHIEF
OFFICE
OFFICE
OFFICE
OFFICE
(PATIENT)
OFFICE
(PATIENT)
OFFICE
OFFICE
(PATIENT)
MED ROOM
NURSE
STATION
LUNCH
ROOM
OFFICE
CONFERENCE
ROOM
ENTRY
KITCHEN
LINEN
ROOM
SUPPLY
ROOM
RESTROOM
RESTROOM
PATIENT
ROOM
PATIENT
RESTROOM
PATIENT
RESTROOM
PATIENT
REST
ROOM
PATIENT
REST
ROOM
PATIENT
REST
ROOM
PATIENT
LAUNDRY
TELE DATA
ELEC.STOR.
PATIENT
REST
ROOM
PATIENT
REST
ROOM
PATIENT
BATH
ROOM
PATIENT
PATIENT
REST
ROOM
SOILED
UTIL ROOM
PATIENT
REST
ROOM
PATIENT
REST
ROOM TOILET HAC
LOUNGE
TOILET
OFFICE
OFFICE
OFFICE
CORR.
CORRIDOR CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PVA INFO
DESK
STOR.
WOMENS
TOILET
MENS
TOILET
PATIENT
RESTROOM
PATIENT
RESTROOM
PATIENT
RESTROOM
LINEN
NOURISH
SOILED
LINEN
DAY ROOM
TOILET
MED ROOM
DAY ROOM
STORAGE
DAY ROOM
STORAGE
ELEC
ACT DAILY
LIVING APT
KITCHEN
RESTROOM
BEDROOM
BONE
MEASURE
LAB
EMS
PM&R
RESIDENTS
OFFICE
PSYCH
OFFICE
NEURO
REHAB
SCI NURSE
MANAGER
OFFICE
SOCIAL
WORK
OFFICE
EXERCISE
PHYSIOLOGY
LAB
SOCIAL
WORK
OFFICE
ADMIN
STORAGE
RESEARCH
& SCI
SECRETARY
ADMIN
STORAGE
PT/OT
OFFICES
(10WORKSTATIONS)
SCI
RESEARCH
OFFICE
PT/OT
QUIET
TREATMENT
ELEC
ELEC/FIRE/DATA
REC.THERAPY
& PEER
SUPPORT
OFFICE
CONFERENCE
ROOM
OT
ASSISTIVE
TECHNOLOGY
LAB
LAUNDRY
ROOM
PT/OT
THERAPY
PT/OT
THERAPY
EQUIP
STORAGE
SOILED
UTIL
CLEAN
UTIL
ADL ROOMBATH
EQUIPMENT
STORAGE
TOILET
SUPPLY
ROOM
SOILED
UTIL
GURNEY
STORAGE
PHARMACY
OFFICE
CLINICAL
OUTCOMES
AND
VOCATIONAL
REHAB
OFFICE
NURSE
EDUCATOR
INPATIENT
CLINICAL
NURSE
SPECIALIST
WOMENS
TOILET
JAN STORAGE
NURSE
STATION
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORR.
CORR.
CORR.
CORR.
CORRIDOR
PATIENT
RESTROOM
PATIENT
RESTROOM
PATIENT
RESTROOM
LINEN
ROOM
PATIENT
PANTRY MED ROOM
TOILETDAY ROOM
NURSE
STATION
MED ROOM
ANTE
ISOLATION
ROOM
RESTROOM
NURSE
REPORT 01
INPATIENT
STAFF
LOUNGE
PATIENT
REST-
ROOM
PATIENT
REST-
ROOM
PATIENT
REST-
ROOM
TELE/
DATA
PATIENT
PATIENT
REST-
ROOM
PATIENT REST
ROOM
PATIENT
RESTROOM
PATIENT
OXY
STORAGE
LAUNDRY
ROOM
CLINICAL
DIETICS
OFFICE
WOMENS
LOCKER
MES
LOCKER
WOMENS
TOILET
MENS
TOILET
CONF/CLASS
ROOM
ELEC
DINING
ROOM
NURSING
SUPPLY
ROOM
SOILED
UTILITY
ASST.
NURSE
MANAGERS
(2)
INPATIENT
AND
OUTPATIENT
STORAGE
JAN
EXAM
EXAM
REST
ROOM
SOILED
UTIL
JAN
UPPER
EXTREMITY
EXAM
EXAM
ROOMCYSTOSCOPIC CYSTO
STORAGE
PSYCH
EXAM
EXAM
WAITING
ROOM
COPY/ FILE
NURSE
MANAGER
OUTPATIENT
OPEN
OFFICE
OUTPATIENT
SOCIAL
WORK
OFFICE
OUTPATIENT
PSYSCH
OFFICE
HAC
RETHERM
KITCHEN
HAC
KITCHEN
STORAGE
CASE
MANAGER
CASE
MANAGER
CASE
MANAGER
ADMIN.
STAFF
LOUNGE
ELEC
CORR.
CORRIDOR
CORRIDOR
ENTRY
CORRIDOR
CORR.
CORRIDOR
CORR.
CORRIDOR
CORR.
CORRIDOR
CORR.
ENTRY CORRIDOR CORRIDOR
CORR.
CORR.
HALL
CLOSET
ACTIVITY
CENTER
CORRIDOR
STORAGE
PATIENT
LAUNDRY
SOILED
UTILITY/
LINEN
SCI/D BED
PATIENT
LITTER
BATHROOM
SCI/D BEDPATIENT
LITTER
BATHROOM
SCI/D BED
ALCOVE
LAUNDRY
CORR.
CORR.
PT/OT
THERAPY
REC
THERAPY
YARD
SCI CLERK/
RECEPTION
LOCKER
VESTIBULE
OFFICE
OFFICE
EXISTING AREA NOT IN SCOPE
PHASING BOUNDARY
37 LEGEND
CONSTRUCTION BARRICADE
VA# 640-14-132P:
36 CONSTRUCTION PROJECT &
PHASING SEQUENCE
PHASE #1:
COMPLETE DEMOLITION AND NEW
CONSTRUCTION WORK.
START PHASE #2 AFTER THE VA HAS OCCUPIED
PHASE #1.
PHASE #2:
START PHASE #3 AFTER THE VA HAS
OCCUPIED PHASE #2.
COMPLETE DEMOLITION AND NEW
CONSTRUCTION WORK PRIOR TO BEGINNING
PHASE #3 WORK
WORK SHALL PROCEED IN NUMERICAL AND
ALPHABETICAL ORDER.
PHASE #3:
COMPLETE DEMOLITION AND INSTALL OF
NEW CORRIDOR E-C01 ACCESS DOOR FROM
EQUIPMENT ROOM E-145H PRIOR TO ANY
DEMOLITION OF PT/OT THERAPY GYM E-145.
THIS PHASE ALSO INCLUDES ALL NEW
CONSTRUCTION WORK FOR OUTPATIENT
THERAPY GYM.
38 DEMOLITION NOTES
1. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE
INSTALLATION OF CONSTRUCTION TUNNEL AND BARRICADES.
RELOCATE CONSTRUCTION BARRICADES AS NECESSARY FOR
CONSTRUCTION WORK AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
2. CONSTRUCTION TUNNEL AND BARRICADE LOCATIONS ARE
NOT ALL SHOWN ON DRAWING AND ARE DIAGRAMMATIC ONLY.
CONSTRUCTION TUNNEL AND BARRICADE LOCATIONS SHOWN
ARE BASICALLY FOR THE PURPOSES OF MAINTAINING THE
FIRE/ EMERGENCY EXIT ROUTES AND FOR MINIMIZING THE
DISRUPTION HOSPITAL CONTINUOUS OPERATION DURING
CONSTRUCTION.
3. REFER TO 1/4" = 1' - 0" FLOOR PLANS FOR ADDITIONAL
BARRICADE LAYOUT, RESPONSIBILITY, AND SEQUENCING.
4. SUBMIT BARRICADE LOCATIONS DRAWINGS TO VA FOR
REVIEW AND APPROVAL PRIOR TO THE INSTALLATION.
5. BIDDERS ARE REQUIRED TO REVIEW ALL ARCHITECTURAL,
MECHANICAL, PLUMBING AND ELECTRICAL CONSTRUCTION
DOCUMENTS AND FULLY UNDERSTAND THE UTILITIES'
REQUIREMENTS. IT IS CONTRACTOR'S SOLE RESPONSIBILITY
TO PROVIDE TEMPORARY UTILITIES AND/OR TO MODIFY
UTILITIES TO ENSURE THE HOSPITAL'S CONTINUOUS
OPERATION AT NO ADJUSTMENT TO THE BID PRICE. FOR
MODIFICATION OF UTILITIES DESIGN, CONTRACTOR SHALL
REQUIRE PRIOR APPROVAL FROM THE VA.
6. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED
AREAS AS REQUIRED AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
7. ACCESS DOORS IN CONSTRUCTION BARRICADE ARE NOT
SHOWN. CONTRACTOR TO PROVIDE ACCESS DOORS AS
NECESSARY FOR CONSTRUCTION WORK. LOCATIONS OF
DOOR SHALL HAVE VA APPROVAL PRIOR TO INSTALLATION.
8. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS
PER THE IBC AND VA GUIDELINES. ALL EGRESS PATHS SHALL
REMAIN CLEAR AT ALL TIMES.
9. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT
COMPLETION OF EACH PHASE AND EACH PROJECT'S
CONSTRUCTION WORK, U.O.N.
10. COMPLETE DEMOLITION OF CEILING, FLOOR FINISHES,
FURRING, AND PARTITIONS WHERE SHOWN DASHED, EXISTING
CASEWORK (EXISTING CASEWORK NOT ALL SHOWN, BIDDER
SHALL VERIFY AT PROJECT SITE), UNLESS OTHERWISE NOTED.
11. REMOVE AND SALVAGE EXISTING LED LIGHTING IN AREA OF
DEMOLITION. CONTRACTOR TO STORE FOR RE-USE. REFER TO
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
12. REMOVE ALL MISCELLANEOUS TRIMS, SHELVES, WINDOW
SILLS, EQUIPMENT, SURFACE MOUNTED CONDUITS, AND
OTHER SURFACE MOUNTED ITEMS WHETHER SHOWN OR NOT
SHOWN ON PARTITIONS TO BE DEMOLISHED.
13. FLOOR FINISHES TO BE REMOVED TO THE TOP OF EXISTING
CONCRETE SLAB. TOP OF EXISTING SLAB TO BE LEFT
SMOOTH AND FREE OF ALL ADHESIVE AND READY FOR
INSTALLATION OF NEW FLOORING, UNLESS OTHERWISE
NOTED.
14. THE BIDDER SHALL TAKE INTO CONSIDERATION AND INCLUDE
IN THEIR BASE BID THAT THE REMOVAL OF EXISTING FLOOR
AND CEILING MATERIAL MAY INCLUDE MORE THAN ONE LAYER.
15. PATCH TO MATCH EXISTING FLOORS, CEILINGS, WALLS,
PARTITIONS, AND OTHER ITEMS THAT ARE DAMAGED
RESULTING FROM DEMOLITION WORK AND NEW
CONSTRUCTION WORK.
16. CONTRACTOR SHALL PROTECT ALL EXISTING CONSTRUCTION
NOT INCLUDED IN THIS CONTRACT. IF THERE IS ANY DAMAGE
TO THE EXISTING CONSTRUCTION, THE CONTRACTOR SHALL
BE RESPONSIBLE FOR THE REPAIR AND RESTORATION OF THE
EXISTING CONSTRUCTION TO THE ORIGINAL CONDITION AT NO
ADDITIONAL COST TO THE VA.
17. THE BIDDER SHALL VISIT THE PROJECT SITE TO OBTAIN THE
EXTENT OF DEMOLITION AND PATCHING WORK PRIOR TO
BIDDING AND SHALL INCLUDE IN THEIR BID COST THE SCOPE
OF WORK NECESSARY TO COMPLETELY PATCH, REPAIR OR
REPLACE THE (E) FLOORS, PARTITIONS, AND CEILINGS,
INTERIOR OR EXTERIOR, AFFECTED BY THE (N) WORK,
WHETHER OR NOT SHOWN WITHIN THE PROJECT AREA. THIS
WORK SHALL BE ACCOMPLISHED WITH NO INCREASE TO THE
CONTRACT SUM. THE EXTENT OF DEMOLITION AND
PATCHING WORK INCLUDES ALL INSTALLATION OF HVAC,
PLUMBING, AND ELECTRICAL WORK IN THIS MAIN PROJECT
SITE AND ANYWHERE WITHIN THIS BUILDING.
18. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL
MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING
WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS
SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE
TO THE PUBLIC.
19. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
5'-0"
4" X 16 GA. STEEL STUD
DIAGONAL KICKER
SEE
1 HOUR HORIZONTAL
BARRICADE FROM 4" X
16 GA. STEEL STUD @
24" O.C. W/ (1) LAYER
OF 5/8" TYPE 'X' GYP.
BD. EA. SIDE
(E) PTN. TO REMAIN
(E) PTN. TO BE
DEMOLISHED,
W.O.
TUNNEL
CONSTRUCTION
SIDE
NON
CONSTRUCTION
SIDE
NON
CONSTRUCTION
SIDE
1 HOUR
BARRICADE,
SIMILAR TO
PTN. TYPE 4b
SEE AS-912.
FOR DOOR
DETAILS REFER
TO AS-920 FIRE
RATED DOOR
HEADS AND
JAMBS
/3 AS-931
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Renovate B7 SCI - Refresh Project
Location:
FINAL BID SET
NOV 10, 2021
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
640-14-123P
VA Palo Alto Health Care System
3801 Miranda Ave. Palo Alto, CA 94304-1290
AESUS
B7
WING D
WING F
WING E
WING A
AD-101
PHASING / DEMOLITION PLAN
SCALE: 1/16" = 1'-0"
5 FIRST FLOOR - DEMO
PHASE 1
PHASE 3
PHASE 1
PHASE 2
SCALE: 1/4" = 1'-0"
40 CONSTRUCTION TUNNEL & BARRICADES
CONSTRUCTION BARRICADES TO BE REMOVED
FOLLOWING COMPLETION OF PHASE I
EXISTING CORRIDORS TO REMAIN
WINDOWS AND DOOR TO REMAIN IN PLACE
AND TO BE DEMOLISHED IN SEPARATE
PROJECT. CONSTRUCTION BARICADE TO BE
REMOVED AFTER RATED PARTITION IS
INSTALLED.
PHASE 2
EXISTING FLOORING,
CEILINGS, AND CEILING
MOUNTED EQUIPMENT TO
REMAIN. REMOVE ALL
MILLWORK AND SINK.
LIMITED SCOPE OF WORK:
EXISTING FIXTURES, MILLWORK
AND FINISHES TO REMAIN.
REMOVE AND SALVAGE FOR RE-
USE CEILING AND FIXTURES FOR
PATIENT LIFT INSTALLATION ONLY.
DEMO WALL FOR NEW DOOR
PRIOR TO PT/OT SHUTDOWN.
EXISTING FLOORS, CEILING,
FIXTURES TO REMAIN.
EXIT
EXIT EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT EXIT
161718
535557
A
B
C
D
F
Q
R
S
U
V
CC
FF
GG
JJ
LL
PP PP
D.2
K.1
N.1
U.1
V.1
X.1
CC.1
GG.1
PP.1
38.149.149.450.1
S.17
S.18
S.19
S.20
Y.1
CORR.
STAIR
ELEC. EEG TEST
ROOM
OFFICE
OFFICE WOMENS
TELE/DATA
OFFICE
WOMENS
MENS
OFFICE OFFICE CONFERENCE EXAM
ROOM 04
EXAM
ROOM 03
OFFICE/
STORAGE
OFFICE/
STORAGE
EXAM
ROOM 02
EXAM
ROOM 01OFFICERECEPTION
PATIENT
WAIT AREA
CORRIDOR
MEETING
ROOM
OFFICE
OFFICE
STORAGE
TREATMENT
ROOM
TREATMENT
ROOM
DAY ROOM
OFFICE
OFFICE
OFFICE
KITCHEN
OFFICE/LAB
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LAB
COPY/
STORAGE
OFFICE
CORRIDOR
CORR.
LAB
STORAGE
OFFICE
STORAGE
EQUIP.
STORAGE
LAB
LASER LAB
STORAGESTORAGE
NEURO
LAB
STORAGE LAB
STOR.
CLO.
TOILETTOILET
STORAGE
REFRIG
LAB
LAB
LAB
LAB
STORAGE
TELE/DATA
RESTROOMRESTROOM
CORRIDORCORRIDORCORR.
CORRIDOR
CORRIDOR
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
BATH
NOURISH
PATIENT
BATH
PATIENT
BATH
CONF/CLASS
ROOM
DINING
ROOM
BIOHAZARD
SUPPLY
ROOM
SCI
STORAGE
JAN
LINEN
ROOM
MED ROOM
CORR.
CORRIDOR
EXAM
EXAM
EXAM
WAITING
ROOM
CORR.
STOR RESTROOM
SOILED
UTILITY
JAN
UPPER
EXTREMITY
EXAM
CORRIDOR
STORAGE
OFFICE
OFFICE
OFFICE
KITCHEN
STORAGE
ADMIN
BREAK CORRIDOR
CORR. KITCHEN
OPEN
OFFICE
OFFICE
OFFICE
EXAMCYSTO
HALLWAY
OFFICE
CORRIDOR
OFFICE
CORRIDOR
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
RECEPTION
TOILET TOILET
PVA
OFFICE
CORR.
PATIENT
ADA
TOILET
JAN.
STOR
ELEC.
TELE DATA
REC
THERAPY
STORAGE
POOL
STORAGE
EQUIP
ROOM B
ELEC.
EQUIP
ROOM A
REST
ROOM
CORRIDOR
PVA
OFFICE
OFFICE
SCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BED
SCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BED
SCI/D BED
PATIENT
LITTER
BATHROOM
ELEC
ROOM
IT ROOM
MED EQUIP
STORAGE
QUIET
ROOM
DAY ROOM
WORK
STATIONS
NURSE
STATION
MEDICATION
DOCUMENT
CONTROL
OFFICE
NOURISHMENTPUBLIC
TOILET
BREAK
ROOM
CORR.
CORRIDOR
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LAUNDRY
SOILED
UTILITY/
LINEN
PATIENT
LITTER
BATHROOM
SCI/D BED SCI/D BED
PATIENT
LITTER
BATHROOM
CLEAN
UTILITY
CLEAN
LINEN
PUBLIC
TOILET
HOUSE
KEEPING
CORRIDOR
VESTIBULE
HAC
JAN
ELEC.
CORRIDOR
DAY ROOM
NURSE
STATION
CORRIDOR
ISOLATION
ROOM
ANTE
RESTROOM
ENTRY
NURSE
REPORT 01
INPATIENT
STAFF
LOUNGE
PATIENT
RESTROOM
RESTROOM
PATIENT PATIENT
RESTROOM
TELE/DATA
PATIENT
CORR.
PATIENT
RESTROOM
RESTROOM
PATIENT
CORRIDOR
TOILET
ASST.
NURSE
MANAGERS
(2)
OXY
STORAGE
ELEC
LAUNDRY
ROOM
WOMENS
LOCKER
MENS
LOCKER
CLINICAL
DIETICS
OFFICE
PATIENT PATIENT PATIENT PATIENT PATIENT PATIENT
RESTROOM
RESTROOM
PATIENT PATIENT PATIENT PATIENT
RESTROOM
RESTROOM
CORRIDOR
REST
ROOM
SOILED
UTIL.
BATHROOM
RESTROOM
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
LOUNGE
OFFICE
OFFICE
(PATIENT)
OFFICE
OFFICE
(PATIENT)
OFFICE
(PATIENT)
OFFICE
OFFICE
OFFICE
OT/PT/EEG
LAB
COPY
STORAGE
OFFICE OFFICE
CORRIDOR
OFFICE OFFICE OFFICE EEG TEST
ROOM
STOR.
PATIENT
LINEN
SOILED
LINEN
DAY ROOM
TOILET
DAY ROOM
STORAGE
DAY ROOM
STORAGE
ELEC
ACT DAILY
LIVING APT
RESTROOM
BEDROOM
BONE
MEASURE
LAB
EMS
PM&R
RESIDENTS
OFFICE
PSYCH
OFFICE -
NEURO-REHAB
SCI NURSE
MANAGER
OFFICE
SOCIAL
WORK
OFFICE
SOCIAL
WORK
OFFICE
ADMIN
STORAGE
RESEARCH
& SCI
SECRETARY
ADMIN.
STORAGE
PT/OT
OFFICES
(10WORKSTATIONS)
SCI
RESEARCH
OFFICE
PT/OT
QUIET
TREATMENT
ELEC
ELEC/FIRE/DATA
REC.THERAPY
& PEER
SUPPORT
OFFICE
CONFERENCE
ROOM
OT
ASSISTIVE
TECHNOLOGY
LAB
LAUNDRY
ROOM
PT/OT
THERAPY
EQUIP
STORAGE
SOILED
UTIL
ADL ROOMBATH
EQUIPMENT
STORAGE
TOILET
SUPPLY
ROOM
SOILED
UTIL.
GURNEY
STORAGE
PHARMACY
OFFICE
CLINICAL
OUTCOMES
AND
VOCATIONAL
REHAB
OFFICE
NURSE
EDUCATOR
INPATIENT
CLINICAL
NURSE
SPECIALIST
WOMENS
TOILET
JAN STORAGE
NURSE
STATION
LAUNDRY
PT/OT
THERAPY
ENTRY
EXERCISE
PHYSIOLOGY
LAB
PT/OT
THERAPY
MED ROOM
NURSE
STATION
LUNCH
ROOM
OFFICE
CONFERENCE
ROOM
KITCHEN
LINEN
ROOM
SUPPLY
ROOM
RESTROOM
RESTROOM
PATIENT
ROOM
PATIENT
RESTROOM
PATIENT
RESTROOM
PATIENT
REST
ROOM
PATIENT
REST
ROOM
PATIENT
REST
ROOM
PATIENT
LAUNDRY
CORRIDOR
CORRIDOR
CORRIDOR
ACTIVITY
CENTER
CORRIDOR
POLYTRAUMA
THERAPY
OFFICE
POLYTRAUMA
KITCHEN
POLYTRAUMA
THERAPY
TREATMENT
BATHROOM
JANITOR
QUIET
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICECORRIDOR
DN
F-A
E-A
E-B C-A
A-A
A-B
B-C
B-B
B-A
H-A
H-B
H-C
D-B
F-C
F-D
F-B
D-A
D-C
D-D
C-B A-C
EXIT
F-A
EXIT
E-A
EXIT
E-B
EXIT
C-A
EXIT
A-A
EXIT
A-B
EXIT
B-C
EXIT
B-B
EXIT
B-A
EXIT
H-A
EXIT
H-B
EXIT
H-C
EXIT
D-B
EXIT
F-C
EXIT
F-D
EXIT
F-B
EXIT
D-A
EXIT
D-C
EXIT
D-D
EXIT
C-B
EXIT
A-C
PHASE 1 TEMPORARY
CONSTRUCTION WALL
WITH EXIT DOOR
ILS 1
ILS 2
EXIT PATH OF TRAVEL
MAINTAINED DURING
PHASE 1 CONSTRUCTION
EXIT PATH OF TRAVEL
RE-DIRECTED SOUTH
DURING PHASE 1
CONSTRUCTION.
EXIT CORRIDOR WIDTH
REDUCED DURING PHASE 1
CONSTRUCTION
NOTE:
SEE AD-101 FOR COMPLETE
DEMOLITION NOTES AT EACH PHASE
PHASE 1PHASE 1
PHASE 1
P H
A S
E
P H
A S
E
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Renovate B7 SCI - Refresh Project
Location:
FINAL BID SET
NOV 10, 2021
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
640-14-123P
VA Palo Alto Health Care System
3801 Miranda Ave. Palo Alto, CA 94304-1290
AESUS
B7
WING D
WING F
WING E
WING A
AD-102
INTERUM LIFE SAFETY PLAN - PHASE 1
EXIT EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT EXIT
161718
535557
A
B
C
D
F
Q
R
S
U
V
CC
FF
GG
JJ
LL
PP PP
D.2
K.1
N.1
U.1
V.1
X.1
CC.1
GG.1
PP.1
38.149.149.450.1
S.17
S.18
S.19
S.20
Y.1
OFFICE
OFFICE
CONFERENCE
EXERCISE
PHYSIOLOGY
ADA
PUBLIC
TOILET
STAFF
TOILET
OFFICE
STAFF
LOUNGE
BEDROOM
BONE
DENSITY
CORR.
KITCHEN
BATH
LIVING/
DINING
CLOSET
CLOSET
CLOSET
STAIR
ELEC. EEG TEST
ROOM
OFFICE
OFFICE WOMENS
TELE/DATA
OFFICE
WOMENS
MENS
OFFICE OFFICE CONFERENCE EXAM
ROOM 04
EXAM
ROOM 03
OFFICE/
STORAGE
OFFICE/
STORAGE
EXAM
ROOM 02
EXAM
ROOM 01OFFICERECEPTION
PATIENT
WAIT AREA
CORRIDOR
MEETING
ROOM
OFFICE
OFFICE
STORAGE
TREATMENT
ROOM
TREATMENT
ROOM
DAY ROOM
OFFICE
OFFICE
OFFICE
KITCHEN
OFFICE/LAB
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LAB
COPY/
STORAGE
OFFICE
CORRIDOR
CORR.
LAB
STORAGE
OFFICE
STORAGE
EQUIP.
STORAGE
LAB
LASER LAB
STORAGESTORAGE
NEURO
LAB
STORAGE LAB
STOR.
CLO.
TOILETTOILET
STORAGE
REFRIG
LAB
LAB
LAB
LAB
STORAGE
TELE/DATA
RESTROOMRESTROOM
CORRIDORCORRIDORCORR.
CORRIDOR
CORRIDOR
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
BATH
NOURISH
PATIENT
BATH
PATIENT
BATH
CONF/CLASS
ROOM
DINING
ROOM
BIOHAZARD
SUPPLY
ROOM
SCI
STORAGE
JAN
LINEN
ROOM
MED ROOM
CORR.
CORRIDOR
EXAM
EXAM
EXAM
WAITING
ROOM
CORR.
STOR RESTROOM
SOILED
UTILITY
JAN
UPPER
EXTREMITY
EXAM
CORRIDOR
STORAGE
OFFICE
OFFICE
OFFICE
KITCHEN
STORAGE
ADMIN
BREAK CORRIDOR
CORR. KITCHEN
OPEN
OFFICE
OFFICE
OFFICE
EXAMCYSTO
HALLWAY
OFFICE
CORRIDOR
OFFICE
CORRIDOR
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
RECEPTION
TOILET TOILET
PVA
OFFICE
CORR.
PATIENT
ADA
TOILET
JAN.
STOR
ELEC.
TELE DATA
REC
THERAPY
STORAGE
POOL
STORAGE
EQUIP
ROOM B
ELEC.
EQUIP
ROOM A
REST
ROOM
CORRIDOR
PVA
OFFICE
OFFICE
SCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BED
SCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BED
SCI/D BED
PATIENT
LITTER
BATHROOM
ELEC
ROOM
IT ROOM
MED EQUIP
STORAGE
QUIET
ROOM
DAY ROOM
WORK
STATIONS
NURSE
STATION
MEDICATION
DOCUMENT
CONTROL
OFFICE
NOURISHMENTPUBLIC
TOILET
BREAK
ROOM
CORR.
CORRIDOR
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LITTER
BATHROOM
SCI/D BEDSCI/D BED
PATIENT
LITTER
BATHROOM
PATIENT
LAUNDRY
SOILED
UTILITY/
LINEN
PATIENT
LITTER
BATHROOM
SCI/D BED SCI/D BED
PATIENT
LITTER
BATHROOM
CLEAN
UTILITY
CLEAN
LINEN
PUBLIC
TOILET
HOUSE
KEEPING
CORRIDOR
VESTIBULE
HAC
JAN
ELEC.
CORRIDOR
DAY ROOM
NURSE
STATION
CORRIDOR
ISOLATION
ROOM
ANTE
RESTROOM
ENTRY
NURSE
REPORT 01
INPATIENT
STAFF
LOUNGE
PATIENT
RESTROOM
RESTROOM
PATIENT PATIENT
RESTROOM
TELE/DATA
PATIENT
CORR.
PATIENT
RESTROOM
RESTROOM
PATIENT
CORRIDOR
TOILET
ASST.
NURSE
MANAGERS
(2)
OXY
STORAGE
ELEC
LAUNDRY
ROOM
WOMENS
LOCKER
MENS
LOCKER
CLINICAL
DIETICS
OFFICE
PATIENT PATIENT PATIENT PATIENT PATIENT PATIENT
RESTROOM
RESTROOM
PATIENT PATIENT PATIENT PATIENT
RESTROOM
RESTROOM
CORRIDOR
REST
ROOM
SOILED
UTIL.
BATHROOM
RESTROOM
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
LOUNGE
OFFICE
OFFICE
(PATIENT)
OFFICE
OFFICE
(PATIENT)
OFFICE
(PATIENT)
OFFICE
OFFICE
OFFICE
OT/PT/EEG
LAB
COPY
STORAGE
OFFICE OFFICE
CORRIDOR
OFFICE OFFICE OFFICE EEG TEST
ROOM
STOR.
PATIENT
LINEN
SOILED
LINEN
DAY ROOM
TOILET
DAY ROOM
STORAGE
DAY ROOM
STORAGE
ELEC
ACT DAILY
LIVING APT
RESTROOM
BEDROOM
BONE
MEASURE
LAB
EMS
PM&R
RESIDENTS
OFFICE
PSYCH
OFFICE -
NEURO-REHAB
SCI NURSE
MANAGER
OFFICE
SOCIAL
WORK
OFFICE
SOCIAL
WORK
OFFICE
ADMIN
STORAGE
RESEARCH
& SCI
SECRETARY
ADMIN.
STORAGE
PT/OT
OFFICES
(10WORKSTATIONS)
SCI
R…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .