Exhibit R_Design Manual Plumbing.pdf

PDF 2 MB Posted

Attached to
X1AA--36C24722R0028 | Goose Creek Specialty Care Clinic | New Lease RLP
Solicitation number
36C24722R0028
Issued by

View the file

Other files

File Type Posted
Exhibit E_GSA3517B-16.pdf PDF
Exhibit M_Design Review Checklist - HVAC.pdf PDF
Exhibit C_ Security Level II Standards.pdf PDF
Exhibit V_Design Manual - HVAC.pdf PDF
Exhibit Q_Design Review Checklist - Architectural.pdf PDF
Exhibit CC_VA Handbook 0730 - Security and Law Enforcement.pdf PDF
Exhibit A_36C24722L0006 - Template Lease.pdf PDF
Exhibit S_Design Manual - Physical Security and Resiliency.pdf PDF
Exhibit D_GSA 3516-12.pdf PDF
Exhibit J_ Seismic Offer Forms.pdf PDF
Exhibit B_ Agency Space Requirements - Rev 1.pdf PDF
36C24722R0028_3.docx DOCX document
Exhibit EE_Design Guide - OIT - Standards Alert.pdf PDF
Exhibit Z_Space Planning - Eye Clinic.pdf PDF
Exhibit DD_Design Guide - Room Finishes.pdf PDF
Exhibit X_ Design Manual - Fire Protection.pdf PDF
Exhibit P_Design Review Checklist - Electrical.pdf PDF
Exhibit AA_Space Planning - Pulmonary.pdf PDF
Exhibit F_GSA 1364 - Proposal to Lease Space.pdf PDF
Exhibit G_GSA 1217 - Lessors Annual Cost Statement.pdf PDF
Exhibit W_Design Manual - Electrical.pdf PDF
Exhibit H_GSA12000-11.pdf PDF
Exhibit K_Telecommunications and Video Surveillance Services or Equipment.pdf PDF
Exhibit FF_Design Guide - OIT - Infrastructure Standard for Telecom Spaces.pdf PDF
Exhibit T_Design Manual - Lighting.pdf PDF
Exhibit Y_Design Manual - Architectural.pdf PDF
Exhibit U_Design Manual - Interior Design.pdf PDF
36C24722R0028.pdf PDF
Exhibit BB_VHA Directive 1061 - Legionella and Scald Prevention.pdf PDF
Exhibit N_Design Review Checklist - Telecommunications.pdf PDF
Exhibit L_Other Standards and Requirements.pdf PDF
Exhibit I _ Davis Bacon Wage Rate.pdf PDF
Exhibit O_Design Review Checklist - Plumbing.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PG 18-10 – PLUMBING DESIGN MANUAL June 1, 2022

TABLE OF CONTENTS i

TABLE OF CONTENTS

TABLE OF CONTENTS .............................................................................................................. i 1 GENERAL REQUIREMENTS ....................................................................................... 1-1

1.1 PURPOSE .................................................................................................................. 1-1

1.2 RESPONSIBILITY ....................................................................................................... 1-2

1.3 SUSTAINABLE DESIGN .............................................................................................. 1-2

1.4 COMMISSIONING .................................................................................................... 1-2

1.5 METERING ................................................................................................................ 1-2

1.6 NATIONAL CODES AND STANDARDS ....................................................................... 1-2

1.7 VA HOSPITAL BUILDING SYSTEM ............................................................................. 1-3

1.8 VA DESIGN STANDARDS .......................................................................................... 1-3

1.8.1 Master Construction Specifications (PG-18-1)........................................................ 1-3

1.8.2 Design and Construction Procedures (PG-18-3) ..................................................... 1-3

1.8.3 Standard Details and CAD Standards (PG-18-4) ..................................................... 1-4

1.8.4 Equipment Guide List (PG-18-5) ............................................................................. 1-4

1.8.5 Design Manuals (PG-18-10) .................................................................................... 1-4

1.8.6 Design Guides (PG-18-12) ....................................................................................... 1-4

1.8.7 Barrier Free Design Standard (PG-18-13) ............................................................... 1-4

1.8.8 Design Submission Requirements (PG-18-15) ........................................................ 1-5

1.8.9 Design and Standards Alerts ................................................................................... 1-5

1.8.10 VA Building Information Modeling (BIM) Guide ..................................................... 1-5

1.8.11 Seismic Design Handbook (H-18-8) ......................................................................... 1-5

1.8.12 Signage Design Manual ........................................................................................... 1-5

1.8.13 Cultural Resource Management Procedures (H-7545) ........................................... 1-5

1.9 ADDITIONAL DESIGN CRITERIA AND STANDARDS ................................................... 1-5

1.9.1 National Fire Protection Association (NFPA) .......................................................... 1-5

1.9.2 Centers for Disease Control and Prevention Biosafety in Microbiological and

Biomedical Laboratories (CDC BMBL) ..................................................................... 1-5

1.9.3 Implementing Instructions: Federal Agency Implementation of Water

Efficiency and Management Provisions .................................................................. 1-6

1.9.4 Architectural Barriers Act Accessibility Standards (ABAAS) ................................... 1-6

1.9.5 Sustainability and Historic Federal Buildings .......................................................... 1-6

1.9.6 National Environmental Policy Act (NEPA) ............................................................. 1-6

1.9.7 National Historic Preservation Act (NHPA) and related standards......................... 1-6

1.10 COORDINATION ....................................................................................................... 1-7

1.11 LOCAL CODES AND REQUIREMENTS ....................................................................... 1-7

1.11.1 Local Utility Providers ............................................................................................. 1-7

1.12 PROJECT SPECIFIC REQUIREMENTS AND INFORMATION........................................ 1-7

1.12.1 VA Provided Materials ............................................................................................ 1-7

1.12.2 Proprietary Items .................................................................................................... 1-8

1.13 Computer Aided Facilities Management Requirements (CAFM) ............................ 1-8

2 PLUMBING DESIGN CRITERIA ................................................................................... 2-1

2.1 TEST PRIOR TO DESIGN ............................................................................................ 2-1

TABLE OF CONTENTS ii

2.2 EQUIPMENT PADS ................................................................................................... 2-1

2.3 PIPING ...................................................................................................................... 2-1

2.4 PIPE SUPPORT DESIGN ............................................................................................. 2-1

2.5 BASE AND VIBRATION ISOLATORS ........................................................................... 2-1

2.6 FREEZE CONDITIONS ................................................................................................ 2-2

2.7 SEISMIC REQUIREMENTS ......................................................................................... 2-2

2.8 CONTRACT DRAWINGS ............................................................................................ 2-2

2.8.1 General .................................................................................................................... 2-2

2.8.2 Basic Design Parameters ......................................................................................... 2-2

2.8.3 Plumbing Fixture Numbers ..................................................................................... 2-3

2.8.4 Symbols and Abbreviations ..................................................................................... 2-3

2.8.5 Cross Sections ......................................................................................................... 2-4

2.8.6 Stack and Riser Diagrams ........................................................................................ 2-4

2.8.7 Equipment Schedules .............................................................................................. 2-4

2.9 INTERDISCIPLINE COORDINATION ........................................................................... 2-5

2.10 CALCULATIONS AND REVIEW SUBMITTALS ............................................................. 2-5

3 PLUMBING FIXTURES, FAUCETS, FITTINGS AND EQUIPMENT .................................... 3-1

3.1 PLUMBING FIXTURES ............................................................................................... 3-1

3.1.1 General .................................................................................................................... 3-1

3.1.2 Bariatric Plumbing Fixtures ..................................................................................... 3-3

3.2 SPECIAL EQUIPMENT ............................................................................................... 3-3

3.2.1 Dialysis Machines .................................................................................................... 3-3

3.2.2 Heart and Lung Machines ....................................................................................... 3-3

3.2.3 Distilled Water Stills ................................................................................................ 3-3

3.2.4 Sterilizers ................................................................................................................. 3-4

3.2.5 Film Processing Areas ............................................................................................. 3-4

3.2.6 Chemical Fume Hoods ............................................................................................ 3-4

3.2.7 Kitchen Equipment .................................................................................................. 3-4

3.2.8 Trash Room/Loading Dock ...................................................................................... 3-4

3.3 ELECTRIC WATER COOLERS ..................................................................................... 3-4

3.4 REDUCED-PRESSURE BACKFLOW PREVENTERS ...................................................... 3-5

3.5 PLUMBING FIXTURE SCHEDULE ............................................................................... 3-5

4 WATER SUPPLY AND DISTRIBUTION ........................................................................ 4-1

4.1 GENERAL .................................................................................................................. 4-1

4.2 DOMESTIC HOT WATER SYSTEMS ........................................................................... 4-1

4.2.1 Water Heater Efficiency .......................................................................................... 4-2

4.2.2 Water Heaters for Patient Care and Research Buildings ........................................ 4-2

4.2.3 Water Heaters for Non-Patient Care Buildings ....................................................... 4-4

4.2.4 Instantaneous Tankless Water Heaters (Point of Use) ........................................... 4-4

4.2.5 Sizing of Water Heaters .......................................................................................... 4-4

4.2.6 Thermostatic Mixing Valves .................................................................................... 4-5

4.2.7 Hot-Water Recirculation Loops and Return Piping ................................................. 4-5

4.2.8 Shut-Off and Balancing Valves ................................................................................ 4-6

TABLE OF CONTENTS iii

4.2.9 Heat Traps ............................................................................................................... 4-7

4.3 DEVICE CALIBRATION .............................................................................................. 4-7

4.4 GENERAL PIPING DESIGN GUIDELINES .................................................................... 4-7

4.4.1 Definitions ............................................................................................................... 4-7

4.4.2 Requirements for Piping Systems ........................................................................... 4-7

4.5 LEGIONELLA MITIGATION IN VA FACILITIES ............................................................ 4-9

4.5.1 Purpose ................................................................................................................... 4-9

4.5.2 Background ........................................................................................................... 4-10

4.5.3 Piping Design Guidelines for Legionella Mitigation .............................................. 4-11

4.5.4 Supplemental Water Disinfection Methods ......................................................... 4-12

4.5.5 Emergency Water Disinfection Methods .............................................................. 4-13

4.5.6 Special Use Water Systems (e.g., hemodialysis, laboratory, pharmacy compounding) ....................................................................................................... 4-14

4.6 INSPECTIONS AND WITNESS OF TESTS .................................................................. 4-14

4.7 WATER DISTRIBUTION SYSTEMS ........................................................................... 4-14

4.7.1 Metering for Use ................................................................................................... 4-14

4.7.2 Measuring and Indicating Devices ........................................................................ 4-15

4.7.3 Water Hammer Arrestors ..................................................................................... 4-15

4.7.4 Trap Primers .......................................................................................................... 4-16

4.8 WALL HYDRANTS ................................................................................................... 4-16

4.9 COORDINATION ..................................................................................................... 4-16

4.10 BACKFLOW PREVENTERS ....................................................................................... 4-16

4.10.1 Reduced Pressure Backflow Preventers ............................................................... 4-16

4.10.2 Atmospheric Vacuum Breakers ............................................................................. 4-17

4.10.3 Hose Connection Vacuum Breakers ...................................................................... 4-17

4.10.4 Fire Sprinkler Systems and Standpipes ................................................................. 4-17

4.11 PRESSURE-REDUCING VALVES ............................................................................... 4-17

4.12 DOMESTIC WATER BOOSTER SYSTEMS ................................................................. 4-18

4.12.1 Minimum Pressure ................................................................................................ 4-18

4.12.2 Patient Care Buildings ........................................................................................... 4-18

4.12.3 Non-Patient Care Buildings ................................................................................... 4-18

4.13 SOLAR DOMESTIC WATER HEATING ...................................................................... 4-19

4.13.1 Basic Solar System Design ..................................................................................... 4-19

4.13.2 Simple System Calculation .................................................................................... 4-20

5 SANITARY DRAINAGE SYSTEMS ............................................................................... 5-1

5.1 SANITARY DRAINAGE ............................................................................................... 5-1

5.1.1 Pipe Design .............................................................................................................. 5-1

5.1.2 Floor Drains ............................................................................................................. 5-1

5.1.3 Fixture Units ............................................................................................................ 5-1

5.1.4 Sanitary Connections .............................................................................................. 5-1

5.1.5 Fats, Oil, and Grease (FOG) Removal Systems ........................................................ 5-2

5.1.6 Dialysis Sanitary Drains ........................................................................................... 5-2

5.1.7 Waste Neutralization Systems ................................................................................ 5-2

TABLE OF CONTENTS iv

5.1.8 Chemical-Resistant Piping ....................................................................................... 5-3

5.1.9 Cast Iron Piping ....................................................................................................... 5-3

5.1.10 Cleanouts ................................................................................................................ 5-3

5.1.11 Waste and Vent Systems ........................................................................................ 5-4

5.2 GRAY WATER RECYCLING SYSTEM .......................................................................... 5-4

5.3 SCHEDULE OF FLOOR DRAINS ................................................................................. 5-4

6 BUILDING STORM DRAINAGE SYSTEMS.................................................................... 6-1

6.1 STORM SYSTEM DRAINAGE ..................................................................................... 6-1

6.2 ROOF DRAIN LEADER INSULATION .......................................................................... 6-1

6.3 CALCULATIONS ........................................................................................................ 6-1

6.4 STORM CONNECTIONS ............................................................................................ 6-1

6.5 SCHEDULE OF AREA/ROOF DRAINS ......................................................................... 6-1

6.6 LOCATION OF DRAIN LEADERS ................................................................................ 6-1

6.7 UNDERSLAB AND FOUNDATION DRAINAGE ........................................................... 6-1

6.8 RAIN WATER HARVESTING SYSTEM ........................................................................ 6-1

7 SPECIALTY TRAPS, INTERCEPTORS, AND SEPARATORS .............................................. 7-1

7.1 SAND/GRIT TRAPS ................................................................................................... 7-1

7.2 OIL/WATER INTERCEPTORS ..................................................................................... 7-1

7.3 GREASE INTERCEPTORS ........................................................................................... 7-1

7.4 PLASTER TRAPS/INTERCEPTORS .............................................................................. 7-1

7.5 CONTAMINATED WATER AND SANITARY WATER RETENTION ............................... 7-2

8 MEDICAL GASES AND VACUUM ............................................................................... 8-1

8.1 GENERAL .................................................................................................................. 8-1

8.1.1 Water Cooled Equipment ....................................................................................... 8-1

8.1.2 Renovation Projects ................................................................................................ 8-1

8.2 MEDICAL GAS AND VACUUM SYSTEMS .................................................................. 8-1

8.2.1 Oxygen, Medical Compressed Air, Medical Vacuum, Nitrous Oxide, Nitrogen

Systems, Carbon Dioxide, Waste Anesthesia Gas Disposal and Instrument Air ............................................................................................................................ 8-1

8.2.2 Central Supply Systems ........................................................................................... 8-2

8.2.3 Piping Systems ........................................................................................................ 8-4

8.2.4 Alarms ..................................................................................................................... 8-5

8.2.5 Connections to Existing Medical Gas Systems ........................................................ 8-6

8.3 LABORATORY GAS AND VACUUM SYSTEMS FOR RESEARCH AND MEDICAL

LABORATORIES ........................................................................................................ 8-7

8.3.1 Central Supply Systems ........................................................................................... 8-7

8.3.2 Piping Systems ........................................................................................................ 8-9

8.3.3 Alarms ................................................................................................................... 8-10

8.4 ORAL EVACUATION SYSTEM .................................................................................. 8-10

8.4.1 High Volume Oral Evacuation (HVE) - General ..................................................... 8-10

8.4.2 Airflow and Vacuum Requirements ...................................................................... 8-10

8.4.3 Vacuum Relief Valves ............................................................................................ 8-11

8.4.4 High Volume Oral Evacuation (HVE) Systems ....................................................... 8-11

TABLE OF CONTENTS v

8.5 DENTAL COMPRESSED AIR SYSTEMS ..................................................................... 8-12

8.5.1 Dental Compressed Air Systems and Equipment ................................................. 8-12

8.5.2 Central Supply System Pressure Requirements .................................................... 8-12

8.5.3 Piping Systems ...................................................................................................... 8-13

8.5.4 Dental Air System Demand ................................................................................... 8-14

8.6 DESIGN FOR DENTAL UNIT WATER LINES.............................................................. 8-15

9 FUEL GAS SYSTEMS .................................................................................................. 9-1

9.1 INTERIOR FUEL GAS SYSTEMS ................................................................................. 9-1

10 SPECIALTY SYSTEMS .............................................................................................. 10-1

10.1 PLUMBING FOR BIOLOGICAL SAFETY LEVEL 3 LABORATORIES ............................. 10-1

10.2 LABORATORY WATER SYSTEMS ............................................................................. 10-1

10.3 PLUMBING FOR ANIMAL CARE (VIVARIUM) FACILITIES ........................................ 10-2

10.4 HEMODIALYSIS WATER DISTRIBUTION SYSTEM DESIGN ...................................... 10-2

10.4.1 General .................................................................................................................. 10-2

10.4.2 Hemodialysis Water Treatment System Description ............................................ 10-3

10.4.3 Hemodialysis Water Treatment Monitoring System ............................................ 10-3

10.5 PHARMACY PLUMBING REQUIREMENTS .............................................................. 10-4

10.6 STERILE PROCESSING SERVICES (SPS) .................................................................... 10-4

10.6.1 General Considerations ......................................................................................... 10-4

10.6.2 Physical Layout ...................................................................................................... 10-5

10.6.3 Water Distribution and Storage ............................................................................ 10-5

10.6.4 Water Quality Monitoring ..................................................................................... 10-6

10.6.5 10-6

10.7 SILVER RECOVERY SYSTEM .................................................................................... 10-6

10.7.1 Automatic Film Processor ..................................................................................... 10-6

10.7.2 Silver Recovery Equipment ................................................................................... 10-6

10.7.3 Pipe Stub ............................................................................................................... 10-6

10.8 SHOP COMPRESSED AIR SYSTEM .......................................................................... 10-7

10.9 THERAPEUTIC POOL EQUIPMENT.......................................................................... 10-7

10.9.1 Water Treatment System ...................................................................................... 10-7

10.9.2 Pipes and Equipment ............................................................................................ 10-7

10.9.3 Filter ...................................................................................................................... 10-7

10.9.4 Water Heater ........................................................................................................ 10-7

10.9.5 Disinfection ........................................................................................................... 10-7

10.9.6 pH Balancing.......................................................................................................... 10-7

10.9.7 Recirculating Pump ............................................................................................... 10-7

10.9.8 Equipment Room .................................................................................................. 10-7

10.9.9 Vacuum Cleaning Equipment ................................................................................ 10-7

10.10 LAUNDRY ............................................................................................................... 10-8

10.10.1 Laundry Equipment ............................................................................................... 10-8

10.10.2 Floor Sinks and Floor Drains .................................................................................. 10-8

10.10.3 Dedicated Sump .................................................................................................... 10-8

10.11 WATER SOFTENING SYSTEM.................................................................................. 10-8

TABLE OF CONTENTS vi

10.11.1 Softener ................................................................................................................. 10-8

10.11.2 When Required ..................................................................................................... 10-8

10.11.3 Salt Storage ........................................................................................................... 10-9

10.11.4 Dealkalizing Equipment ......................................................................................... 10-9

10.11.5 Dealkalizer Tank .................................................................................................... 10-9

10.11.6 Brine and Caustic Soda Tanks ............................................................................... 10-9

10.11.7 Miscellaneous ....................................................................................................... 10-9

10.12 REAGENT GRADE WATER SYSTEMS ....................................................................... 10-9

10.12.1 Floor Space for Central Reagent Grade Equipment .............................................. 10-9

10.12.2 Floor Space for Regenerant Chemicals ................................................................. 10-9

10.12.3 Emergency Shower and Eye/Face Wash ............................................................... 10-9

10.12.4 Negative Pressure Ventilation .............................................................................. 10-9

10.12.5 Chemical-Resistant Piping and Drains ................................................................ 10-10

10.13 PLUMBING FOR PARKING STRUCTURES .............................................................. 10-10

10.13.1 Water Distribution Systems ................................................................................ 10-10

10.13.2 Storm Drainage Systems ..................................................................................... 10-10

11 APPENDIX A: VA HOSPITAL BUILDING SYSTEM ...................................................... 11-1

11.1 DESCRIPTION OF MODULES .................................................................................. 11-1

11.1.1 Introduction .......................................................................................................... 11-1

11.1.2 Structural Bays ...................................................................................................... 11-1

11.1.3 Service Zones ........................................................................................................ 11-1

11.1.4 Functional Zones ................................................................................................... 11-1

11.1.5 Fire Compartmentation ........................................................................................ 11-1

11.1.6 Plumbing Utilities .................................................................................................. 11-1

11.2 ZONING OF PLUMBING SYSTEMS .......................................................................... 11-1

11.3 REFERENCES ........................................................................................................... 11-2

12 APPENDIX B: COMPUTER AIDED FACILITIES MANAGEMENT (CAFM) ...................... 12-1

12.1 CAFM AND EQUIPMENT SCHEDULE UTILIZATION ................................................. 12-1

12.1.1 Introduction .......................................................................................................... 12-1

12.1.2 Submission Requirements .................................................................................... 12-1

12.1.3 Electronic Documentation .................................................................................... 12-1

12.1.4 Schedules .............................................................................................................. 12-1

13 APPENDIX C: A/E SUBMISSION REQUIREMENTS AND PLUMBING DESIGN

MANUAL COORDINATION ............................................................................. 13-1

13.1 GENERAL ................................................................................................................ 13-1

13.1.1 Introduction .......................................................................................................... 13-1

13.1.2 Coordination ......................................................................................................... 13-1

13.1.3 Compliance Requirements .................................................................................... 13-1

13.1.4 BIM Requirements ................................................................................................ 13-1

13.1.5 Specific Drawing Requirements ............................................................................ 13-1

13.1.6 Equipment Schedules ............................................................................................ 13-2

13.1.7 Schematic Design Level 1 (SD1) Submission Requirements ................................. 13-3

13.1.8 Schematic Design Level 2 (SD2) Submission Requirements ................................. 13-4 vii

13.1.9 Design Development Level 1 (DD1) Submission Requirements ........................... 13-4

13.1.10 Design Development Level 2 (DD2) Submission Requirements ........................... 13-5

13.1.11 Construction Document Level 1 (CD1) Submission Requirements ....................... 13-5

14 APPENDIX D: SCHEMATIC DIAGRAMS ................................................................... 14-1

14.1 INTRODUCTION ..................................................................................................... 14-1

14.1.1 Master Thermostatic Mixing Valve ....................................................................... 14-1

14.1.2 Temporary Eradication System Connection ......................................................... 14-2

14.1.3 Cold Water / Hot Water Connection of Plumbing Fixture { XE "schematic diagrams:cold water/hot water connection of plumbing fixture" } ..................... 14-3

14.1.4 Acid Waste Neutralization System ........................................................................ 14-3

14.1.5 Hot Water / Hot Water Return Pipe Routing in a Typical Ward ........................... 14-5

14.1.6 Hot Water Circulation with Master Thermostatic Mixing Valve .......................... 14-6

15 APPENDIX E: SERVICE PIPE SCHEDULE .................................................................... 15-1

15.1 PIPE SERVICE, MATERIAL, FITTINGS AND JOINTS .................................................. 15-1

16 INDEX .................................................................................................................... 16-1

General Requirements 1-1

1 GENERAL REQUIREMENTS

1.1 PURPOSE

This manual is a directive for Architecture and Engineering design professionals (hereafter referred to as A/E or designer) for the planning and design of the drainage, waste, vent, water distribution, storm drainage, natural gas and fuel gas, medical gas, medical vacuum, and specialty systems at Department of Veterans Affairs (VA) facilities. VA facilities have a wide range of occupants including patients, employees, volunteers, and visitors. An important mission of VA is to provide healthcare to Veterans who, in some cases, have severe disabilities, including sight, hearing, and mobility. The A/E must always keep the interest of the sick and/or disabled Veteran in mind when making decisions in locations where design choices affect Veterans.

This design manual shall be utilized for all VA projects, including major, minor, and NRM projects. It is expected that systems designed shall meet their primary intent of providing a sanitary, safe, reliable, and sustainable facility. In order to provide the latitude needed to accommodate new technologies, methods and materials, and/or pre-existing field conditions, technical deviations from the stipulations of this manual may be made only if a safe, reliable, and sustainable design shall result. Such deviations must be approved by VA Authorities.

Unless otherwise directed by VA, the Authority Having Jurisdiction is the VA Project Manager and/or the local VA Medical Center. Deviations that are not permitted are requirements included in public laws, federal regulations, Executive Orders, and all applicable codes.

Deviations from Section 4.5 Legionella Mitigation in VA Facilities shall be approved by the Facility Water Safety Committee. This manual is intended for use by the A/E and others engaged in the design and renovation of VA facilities. These facilities include but are not limited to:

• Acute Care

• Ambulatory Care Centers

• Animal Research Facilities

• Clinical Additions

• Community-Based Outpatient Clinic

(CBOC)

• Community Living Centers (CLC)

• Domiciliary

• Drug/Alcohol Rehabilitation

• New Hospitals

• Energy Centers

• Laundries

• Laboratory Buildings

• Medical Research

• Mental Health - Inpatient

• Outpatient Clinics

• Parking Structures

• Psychiatric Care Facility

• Rehabilitation Medicine

• Rehabilitation/Prosthetics

• Replacement Hospitals

• VBA Offices

• Warehouses

General Requirements 1-2

1.2 RESPONSIBILITY

The A/E shall provide all necessary professional services to perform planning and design of the systems for the project. The A/E is responsible and liable for the professional design in accordance with the contract, good engineering practices, VA standards, VA project-specific requirements (if any), and applicable codes.

1.3 SUSTAINABLE DESIGN

VA’s design and construction program is required to comply with numerous federal mandates, Executive Orders, and VA policies related to energy efficiency, renewable energy, water conservation, and other sustainability requirements. Refer to Construction and Facilities Management’s (CFM’s) Technical Information Library (TIL) for details of VA’s Sustainable Design Program which includes VA Policies, Handbooks, and Design Guidance. Sustainability Goals shall be established by the Integrated Design Team (VA and A/E). Overarching goals may be directed solely by the VA.

1.4 COMMISSIONING

The scope of work shall include Total Building Commissioning in accordance with the Whole Building Commissioning Process Manual and Specification published by CFM and posted in the VA Technical Information Library (TIL) http://www.cfm.va.gov/til/.

1.5 METERING

Install building level utility meters in new major construction and renovation projects to track and continuously optimize performance to measure consumption of potable water, gas, steam, electricity, and thermal energy in federal buildings and other facilities and grounds. Metering systems should be coordinated with the VA facility and the VA national metering reporting system. Meters shall be installed in accordance with the VA Sustainable Design Manual.

Metering requirements should be included in all Energy Savings Performance Contracts (ESPC) and Utility Energy Service Contracts (UESC), as appropriate.

1.6 NATIONAL CODES AND STANDARDS

The International Plumbing Code (IPC), National Fire Protection Association (NFPA) 54 (National Fuel Gas Code), and NFPA 99 (Health Care Facilities Code), American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) 90.1-2013 (Energy Standard for Building Except Low-Rise Residential Buildings) and ASHRAE Handbook HVAC Applications, and the American Society of Plumbing Engineers (ASPE) Data Books are the major referenced standards used in the Plumbing Design Manual. Most of these references are available to VA employees on the CEOSH website (http://vaww.ceosh.med.va.gov/) accessible via the VA intranet or can be obtained from the following sources:

• The latest IPC can be obtained from the International Code Council, 5203 Leesburg Pike, Suite 600; Falls Church, VA, 22041, http://www.iccsafe.org.

• The latest NFPA 54 and NFPA 99 can be obtained from National Fire Protection Association, 1 Battery March Park, Quincy, MA 02269, http://www.nfpa.org.

http://www.cfm.va.gov/til/ http://vaww.ceosh.med.va.gov/ http://vaww.ceosh.med.va.gov/ http://www.iccsafe.org/ http://www.iccsafe.org/ http://www.nfpa.org/ http://www.nfpa.org/

General Requirements 1-3

• The latest ASHRAE Standards and Guidelines can be obtained at https://www.ashrae.org/.

• The latest ASPE Data Book can be obtained at http://www.aspe.org.

Unless specifically stated otherwise, the latest edition adopted by the VA shall be used.

Additionally, Chapter 13 of the IPC lists standards that are referenced in various sections of the IPC and VA Master Plumbing Specifications. These references are also given in the text of this manual where appropriate.

1.7 VA HOSPITAL BUILDING SYSTEM

The VA Hospital Building System (VAHBS) is a methodology based on a modular concept for planning, designing, and constructing hospitals.

Due to the modular concept of the VA Hospital Building System and the Guiding Principle of Integrated Design, the A/E will find that plumbing schematic/design development decisions occur much earlier in the overall planning/design process when compared to a conventional design process. Equipment selection and main distribution sizing should be evaluated as soon as the size and number of modules is determined.

The methodology has been successfully used nationwide for capital and operating cost containment, shortened delivery schedules, and improved space utilization flexibility. All new and replacement VA hospital buildings shall use the VAHBS system. This system is also recommended for major additions to existing hospitals where future adaptability is an important factor.

See VHA Program Guide PG-18-3, Design and Construction Procedures, Topic 3, VA Hospital Building System for further guidance. The complete reference for the VAHBS is contained in the 1976 Development Study (called the Redbook) and the 2006 Supplement. Additional details are included in Appendix 11-A.

1.8 VA DESIGN STANDARDS

VA standards are described in this section. All the manuals, guides, details, lists, requirements and references in this section are found on the CFM TIL at http://www.cfm.va.gov/til/ unless otherwise noted. The key VA Design Standards concerning plumbing system design are listed below.

1.8.1 Master Construction Specifications (PG-18-1)

This reference defines a standardized specification for the A/E to assure that the contractors provide equipment and systems that meet the design intent in terms of performance, quality, regulatory compliance, and cost.

1.8.2 Design and Construction Procedures (PG-18-3)

This reference establishes minimum consistent design/construction practices and references the VAHBS methodology.

https://www.ashrae.org/ https://www.ashrae.org/ http://www.aspe.org/ http://www.aspe.org/ http://www.cfm.va.gov/til/ http://www.cfm.va.gov/til/

General Requirements 1-4

1.8.3 Standard Details and CAD Standards (PG-18-4)

VA has adopted the U.S. National CAD Standard (NCS) Version 4, which is amended by the VHA National CAD Standard Application. A link to the NCS standards and the VHA National CAD Standard Application Guide is found on the TIL website.

Note: The A/E shall utilize VA Standard Details to the fullest extent possible. A modification to a Standard Detail requires the approval of VA Authorities.

1.8.4 Equipment Guide List (PG-18-5)

This is a reference for planning and development of equipment requirements for VA facilities.

1.8.5 Design Manuals (PG-18-10)

These standards are intended to convey general and specific design requirements for VA facilities.

• Fire Protection Design Manual: Provides the fire protection engineering design criteria for all categories of VA construction and renovation projects.

• Asbestos Abatement Design Manual: Serves as a guide for the planning and design of asbestos abatement projects location at VA facilities.

• Site Development Design Manual and Appendix: Provides planning and design of the site layout, storm water management, building location and orientation, site utilities, landscaping and irrigation.

• Physical Security Design Manual for VA Facilities: Provides physical security standards required for facilities to continue operation during a natural or manmade extreme event and for facilities that are required to protect the life safety of patients and staff in an emergency. Standards are provided in two separate manuals:

o Mission Critical Facilities Design Manual o Life-Safety Protected Design Manual

• Cost Estimating: Provides general and specific VA cost estimating philosophies.

• Sustainable Design Manual: Covers sustainability-related requirements that all projects must comply with.

• Transport Systems (Elevators) Design Manual: Provides engineering design criteria for elevator systems.

1.8.6 Design Guides (PG-18-12)

Provides the designer with specific layout templates and medical equipment lists for all types of spaces/uses and specific design parameters for structural, electrical and mechanical design.

1.8.7 Barrier Free Design Standard (PG-18-13)

This supplement to Architectural Barriers Act Accessibility Standards (ABAAS) provides guidelines to better meet the barrier free needs of VA in its healthcare facilities.

General Requirements 1-5

1.8.8 Design Submission Requirements (PG-18-15)

These references provide a staged list of tasks in various design categories to define the A/E scope and assure thorough and timely completion of the final design package and bid documents.

1.8.9 Design and Standards Alerts

CFM uses Standards Alerts to notify designers of changes to design standards that have not yet been included in VA specifications and design manuals. Design Alerts are used to alert designers to important recommendation related to the design of VA facilities. Alerts can be found on CFM’s TIL.

1.8.10 VA Building Information Modeling (BIM) Guide

VA has adopted BIM to achieve better quality documents for construction and to provide electronic data for facilities management.

1.8.11 Seismic Design Handbook (H-18-8)

This reference establishes code and other requirements, including occupancy categories, for new or existing VA facilities located in seismic areas so these facilities remain functionally operational after an earthquake.

1.8.12 Signage Design Manual

This reference provides guidelines for the design of signs and provides detailed information on the development of a signage system.

1.8.13 Cultural Resource Management Procedures (H-7545)

This handbook discusses requirements of cultural resource legal authorities outlined in VA Directive 7545, and elaborates on assignment of responsibilities.

1.9 ADDITIONAL DESIGN CRITERIA AND STANDARDS

There are several other federal and industry design references and standards that are applicable to VA projects. The standards, codes, and guides listed below are to be reviewed and incorporated on a project specific basis as determined by the project scope of work.

1.9.1 National Fire Protection Association (NFPA)

The National Fire Protection Association develops and publishes codes and standards intended to minimize the possibility and effects of fire and other risks (http://www.nfpa.org).

1.9.2 Centers for Disease Control and Prevention Biosafety in Microbiological and Biomedical Laboratories (CDC BMBL)

The latest CDC BMBL publication provides fundamentals of containment include the microbiological practices, safety equipment, and facility safeguards that protect laboratory workers, the environment, and the public from exposure to infectious microorganisms that are handled and stored in the laboratory. (http://www.cdc.gov/biosafety/publications/) http://www.nfpa.org/ http://www.nfpa.org/ http://www.cdc.gov/biosafety/publications/ http://www.cdc.gov/biosafety/publications/

General Requirements 1-6

1.9.3 Implementing Instructions: Federal Agency Implementation of Water Efficiency and Management Provisions

This document provides instructions to federal agencies on implementation of the water use efficiency and management goals of section 2(d) of Executive Order 13514, federal Leadership in Environmental, Energy, and Economic Performance.

(http://www.whitehouse.gov/sites/default/files/water_implementing_instructions.pdf)

1.9.4 Architectural Barriers Act Accessibility Standards (ABAAS)

This document contains scoping and technical requirements for accessibility at federal sites and facilities by individuals with disabilities. These requirements are to be applied during the design, construction, additions to, and alteration of sites, facilities, buildings, and elements to the extent required by regulations issued by federal agencies under the Americans with Disabilities Act of 1990 (ADA). ABAAS replaces the Uniform Federal Accessibility Standards (UFAS), which was VA’s previous standard for accessibility.

1.9.5 Sustainability and Historic Federal Buildings

The goal of this guidance is to assist federal decision makers, usually capital asset managers, facility managers, and other program and project managers, in their considerations regarding sustainability and historic federal buildings. Decision makers will consider historic preservation outcomes; and to take advantage of opportunities for meeting historic preservation, energy efficiency, and sustainability goals together in the administration of federal buildings.

(http://www.achp.gov/docs/SustainabilityAndHP.pdf)

1.9.6 National Environmental Policy Act (NEPA)

The National Environmental Policy Act (NEPA) requires federal agencies to integrate environmental values into their decision making processes by considering the environmental impacts of their proposed actions and reasonable alternatives to those actions.

To meet NEPA requirements federal agencies conduct environmental impact assessments during project planning. In some cases an agency prepares a detailed statement known as an Environmental Impact Statement (EIS). The results of NEPA analysis are integrated into planning and decision making, and often influence the design of projects. NEPA requirements must be addressed beginning at the earliest possible point in project planning; the A/E shall be tasked to provide VA with the data and expert advice needed to address these requirements.

1.9.7 National Historic Preservation Act (NHPA) and related standards

The National Historic Preservation Act (NHPA) and related laws, regulations and executive orders collectively require federal agencies to consider, where possible protect, and if feasible make productive use of historic buildings, structures, sites, landscapes, and other types of “cultural resource” (See VA Directive/Handbook 7545). Under regulations implementing Section 106 of the NHPA, agencies review and consult about the effects of their proposed actions on historic properties, and execute binding commitments that must be reflected in the design of projects. Detailed standards issued by the Secretary of the Interior (http://www.nps.gov/tps/standards.htm) influence the design of projects that modify historic http://www.whitehouse.gov/sites/default/files/water_implementing_instructions.pdf http://www.whitehouse.gov/sites/default/files/water_implementing_instructions.pdf http://www.achp.gov/docs/SustainabilityAndHP.pdf http://www.achp.gov/docs/SustainabilityAndHP.pdf http://www.nps.gov/tps/standards.htm http://www.nps.gov/tps/standards.htm

General Requirements 1-7 buildings and structures. Like NEPA requirements, those of the NHPA and related authorities must be addressed beginning at the earliest possible point in project planning; the A/E is often tasked to provide VA with the data and expert advice needed to address them.

1.10 COORDINATION

The A/E shall coordinate all work to avoid design conflicts and eliminate potential change orders. Of particular focus, shall be concealed and underground areas and site utility coordination.

The A/E shall coordinate with federal, state, county, and local agencies to determine required permitting for the project and provide the VA Project Manager with a summary of the permit requirements, copies of permit applications and copies of correspondence, meeting minutes and other supporting documentation.

1.11 LOCAL CODES AND REQUIREMENTS

The A/E shall bring local and regional climatic and geographic conditions and provisions of local building codes that are significantly different from national codes and conditions to the attention of VA. Of particular focus, shall be local codes, code amendments, and/or conditions related to coastal, hurricane-prone, arctic, seismically active regions, or other climatic or regional conditions that warrant additional measures to protect the integrity of systems.

1.11.1 Local Utility Providers

The A/E shall follow the rules and regulations of local utility companies, where applicable. The A/E shall investigate potential rebates, and other programs offered by local utility companies for the use of specific types of equipment and provide a detailed summary of potential savings to the VA Project Manager.

The A/E shall coordinate with local utility providers to verify the location, size and characteristics of existing utility mains and/or service lines available for connection to the proposed facility.