This document outlines requirements for a Request for Lease Proposal from the Department of Veterans Affairs for approximately 17,381 ABOA square feet of clinic space and 95 parking spaces in Lancaster, Ohio. Space must be in an existing building located within the delineated area bounded by Coonpath Rd/Hwy 31, Duffy Rd SE, Lawrence St., S Maple St., E. Main St., Cedar Hill Rd, and Lancaster-Circleville Rd. The space will be used as a Community Based Outpatient Clinic. The lessor must also provide an Operation and Maintenance Plan detailing janitorial services, HVAC, electrical, plumbing, life safety systems, security, exterior maintenance, and other requirements.

View the file

Other files

File Type Posted
Exhibit W - Finish Requirement - ISSUED - 05.20.2024.pdf PDF
36C25024R0004 - AMEND 0002 - ISSUED.pdf PDF
RLP 36C25024R0004 -Amended 05.20.2024 - ISSUED.pdf PDF
36C25024R0004 0001.pdf PDF
36C25024R0004.pdf PDF
Exhibit D - GSA 3516 Solicitation Provisions.pdf PDF
RLP 36C25024R0004 -Lancaster OH VA Clinic.pdf PDF
Exhibit U - VA Handbook 6500 6 Contract Security Appendix A.pdf PDF
Exhibit B - Agency Specific Requirements.pdf PDF
Exhibit M - DOL Wage JAN 2024.pdf PDF
Exhibit C - FSL II Requirements and Pricing.pdf PDF
Exhibit O - Contract Confidentiality Certificate.pdf PDF
Exhibit H - GSA 12000 Prelease FPLS.pdf PDF
Exhibit T - Clinic Janitorial Service and Pest Control 15 Dec. 2023.pdf PDF
Exhibit J - Tenant Improvement Cost Summary TICs.xlsx XLSX spreadsheet
Exhibit E - GSA Form 3517B General Clauses.pdf PDF
Exhibit R - 527 Contract Qualifications.pdf PDF
Exhibit K - Past Performance Survey.pdf PDF
Exhibit V - PIV Badge Instructions and Attachments - CBOC - Combined with Attachments.pdf PDF
Exhibit S - SF330 A-E Qualifications.pdf PDF
Exhibit G - 1217 Lessor Annual Cost Statement.pdf PDF
Exhibit I - Lancaster Clinic Conceptual Drawing Schedules and Design Requirements.pdf PDF
Exhibit Q - Certificate of Bldg Performance.pdf PDF
Exhibit A - 36C25024L0006 Lancaster.pdf PDF
Exhibit F - 1364 Proposal to Lease Space.pdf PDF
Exhibit L - Program for Design.pdf PDF
Exhibit N - FAR 52.204-24.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lancaster, Ohio Clinic Lease OPERATION AND MAINTENANCE (O&M) PLAN

CHILLICOTHE VAMC, OHIO DATE OF SPEC VERSION: 27 May 2022

SECTION LESSOR’S OPERATION AND MAINTENANCE PLAN SUBMITTAL REQUIREMNTS

TABLE OF CONTENTS

PART 1 - LESSOR’S OPERATION AND MAINTENANCE PLAN SUBMITTAL REQUIREMENTS 1

PART 2 - Review and Evaluation of Operations 3

PART 3 - Protection of Government Leased Property 4

PART 4 - Security 4

PART 5 - Safety and Infection Control 5

PART 6 - VA PIV Badge 7

PART 7 - VA HANDBOOK 6500.6 Appendix B VA Acquisition Regulation Solicitation Provision and Contract Clause 8

PART 8 - VA HANDBOOK 6500.6 Appendix C VA INFORMATION AND INFORMATION

SYSTEM SECURITY/PRIVACY LANGUAGE FOR INCLUSION INTO CONTRACTS 8

PART 9 - VA Handbook 6500.6 Appendix D CONTRACTOR RULES OF BEHAVIOR

(REQUIRED TO BE SIGNED ANNUALLY – SUBMIT TO VA CONTRACTING OFFICER AND

CONTRACTING OFFICER REPRESENTATIVE) 18

PART 1 - LESSOR’S OPERATION AND MAINTENANCE PLAN SUBMITTAL REQUIREMENTS

1.01 GENERAL

A. This lease will require the Lessor to maintain the building, equipment and systems, the exterior, and interior of the leased premises as well as the common areas, over the term of the lease.

B. The Government requires assurance that the building will be kept in good condition with high quality, professional management and maintenance over the full term of the lease. Consequently, the proposed Operation and Maintenance (O&M) Plan for the building will be carefully evaluated.

C. The lease shall be maintained with documentation to be fully compliant with Joint Commission requirements for Environment of Care and Life Safety chapters. Documentation of maintenance testing, and inspection activities required shall be maintained and submitted to the VA COR.

D. The Operation and Maintenance (O&M) Plan shall be kept up to date throughout the duration of the lease. Change in personnel shall be submitted to the COR as changes are made.

1.02 Personnel

A. The Lessor shall identify and provide addresses and contact information for entities that will maintain the leased premises (Lessor’s building superintendent, designated local property management firm, and any contractors or subcontractors). Additionally key personnel that shall be listed in the plan shall include but be not limited to Janitorial Services Superintendent including points of contact that will be used for sources of Consumables and Equipment as listed in the Janitorial Services SOW, Security Alarm Monitoring POC, Fire Alarm and Fire Suppression monitoring

POC.

B. The Lessor shall describe the organization and structure the workforce of both operations and maintenance personnel. Organization charts, staffing plans indicating trades, number of personnel, and experience levels, and operating schedules shall be provided for evaluation.

1.03 Procedures for Managing O&M

A. Lessor shall outline procedures for dealing with scheduled and non-scheduled maintenance and repairs.

B. The O&M Plan shall indicate how the scheduled (routine) maintenance and repair of the building will be managed.

C. For non-scheduled repairs, the O&M Plan shall describe how service calls (emergency and routine) will be addressed. Identify contact information for both normal working hours and for off-hours and holidays. Quantify response times for on and off-site maintenance entities.

D. Service calls will be classified as emergency calls when the condition constitutes an immediate danger to personnel, threatens to damage property, or has a direct impact on operations or security. Classification of calls as emergency shall be at the sole discretion of the government.

E. During normal working hours, Lessor’s on-site superintendent shall respond immediately upon notification. Emergencies occurring at other than normal working hours shall be responded to (on scene) within 60 minutes of receipt of call. Lessor shall repair or neutralize the emergency condition before departing the site. If necessary, Lessor shall acquire material by fastest available means and include work outside normal hours. If further labor or materials are required after the emergency is neutralized, the Lessor shall have the repairs completed within three (3) working days or within such other reasonable time as agreed to by the government. The Lessor shall have available generally used spare parts and common building materials to support emergency requirements. Lack of standard material shall not be a cause for non-performance.

F. Service calls will be classified as routine when the condition does not qualify as an emergency call. Eighty-five (85%) of all routine calls shall be completed within five (5) working days after the receipt of the call, with remainder being completed within ten (10) working days.

1.04 O&M Plan Minimum Requirements

For each activity in the O&M Plan, the Lessor shall identify the responsible entity and frequency of the maintenance. The plan shall address the following activities at a minimum. For each of the requirements address personnel, management equipment, supplies, etc.

A. Janitorial Services including all elements of the Janitorial Services SOW. Specifically address sources for Consumables and Equipment requirements listed in the Janitorial Services SOW

B. Heating Ventilation and Air Conditioning Maintenance and Repair.

Including filters, belts, lubricants, fluids, regular servicing requirements.

C. Electrical Systems Maintenance and Repair. Address bulbs, tubes, starters, ballasts, fixtures, overcurrent protective devices, and UPS located in the IT room.

D. Plumbing System Maintenance and Repair. Supply, waste, and vent.

Specifically address maintenance of hot water recirculation loop elements including heaters, recirculation pumps, controls, thermostatic mixing valves, and checking temperatures for safety at point of use fixtures

E. Life Safety Systems including those building components that fall under NFPA 101 Life Safety Code, Fire Extinguishers, Fire Alarm and Fire Suppression Systems including all required NFPA Inspections, Testing, and Maintenance. Reference the Centrally Monitored Fire Alarm and Fire Suppression Design, Preventative Maintenance, and Testing SOW including monitoring requirements. Documentation of maintenance testing, and inspection activities required shall be maintained and submitted to the VA COR including the requirements of NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, NFPA 72 National Fire Alarm and Signaling Code, NFPA 10 Standard for Portable Fire Extinguishers, NFPA 101 Life Safety code, and any State and Local code requirements.

F. Security Systems to include Intrusion Detection System, CCTV, access control, duress, PA System and monitoring. Reference the Security Design Requirements and Security Operations and Administration SOW.

G. Exterior and Grounds to include parking lot and road repair and/or resurfacing, sidewalks, landscaping/lawn care, exterior painting, windows, roofs, irrigation systems, snow and ice removal, trash removal, recycling pickup, exterior lighting, pest control, and general litter pick-up shall be discussed.

H. Miscellaneous interior maintenance to include doors, floor coverings, walk off carpets, interior painting, ceilings, blinds/draperies, etc

I. Elevators (if applicable)

1.05 Lessor’s Quality Control

Describe how the Lessor will provide quality control to ensure that all services described in the O&M Plan are, in fact, provided, and how the Lessor will maintain quality and appearance of the entire building over the term of the lease.

1.06 Additional Requirements

The lessor’s operations and maintenance staff shall comply with the additional requirements for operations and maintenance listed in this document, the Request for Lease Proposal (RLP), and Lease Documents including all exhibits and attachments.

PART 2 - Review and Evaluation of Operations

2.01 Activity Reports

The Lessor shall provide activity reports. Submit the reports monthly prior to billing or as requested by the COR. The reports shall be at a minimum a checklist verifying all required maintenance has taken place.

2.02 Government Inspections

The Government reserves the right to inspect the quality of work required by this statement of work and make comments to the same. Reports of discrepancies provided shall be promptly addressed and response provided in writing by the Lessor to the COR.

2.03 Documents

The Lessor shall provide copies of all documents listed in this contract to the COR when requested within 24 hours of the request.

PART 3 - Protection of Government Leased Property

During the execution of the work, the Lessor shall take special precautions to protect Government property including furniture, walls, baseboards, and other surfaces. Accidental splashes shall be removed immediately. The Lessor shall return areas damaged as a result of work under this contract to their original condition, to include painting, refinishing, or replacement if necessary without any additional cost to the government.

PART 4 - Security

The Lessor shall comply with all Government security requirements.

4.01 Video Surveillance

The property will be covered by twenty-four hour video surveillance and all Lessor activities are subject to monitoring.

4.02 Keys and PIV Badge

The Lessor shall request keys to be issued to employees through the COR.

The Lessor will be provided keys, PIV Badge, and/or allowed access to all rooms requiring maintenance or repair services. The Government may choose to accompany Lessor personnel when in certain secured areas. Keys provided to the Lessor shall not be duplicated. The Government at the Lessor’s expense shall replace any keys lost by Lessor personnel. In the event a key is lost or duplicated, all locks and keys on that lock system will be replaced by the Government, and the total replacement cost will be deducted from the payment due to the Lessor, or the Government may recover funds by all means available. The Lessor shall immediately report the occurrence of a lost key to the COR.

4.03 Securing Spaces

Lessor employees shall not allow anyone to use any key in their possession. They shall not open locked areas to permit entrance by persons other than Lessor employees performing assigned duties. All areas that are to be locked shall not be left unattended during the maintenance process and shall be relocked by Lessor personnel after completion of duties. Lessor personnel shall turn off all lights in all unoccupied areas. Lessor shall ensure all alarms are set prior to leaving the premises if they are the last to leave.

4.04 Identification Badges

See section of VA PIV Badge. All Lessor personnel requiring access to the VA shall obtain employee identification badge required by the Government.

4.05 Consequences of Illegal Activities

Lessor employees who are found in violation of Government security regulations will be immediately removed from the clinic and barred from performing further work under this contract.

4.06 Loitering

Lessor employees shall not loiter on the clinic grounds when in a non-duty status. After completing assigned work shifts, all Lessor personnel shall promptly depart the clinic.

4.07 Security Checkout Procedures

Upon termination of employment of their employee(s) and or end of the contract, the Lessor is responsible for obtaining and turning over to the COR all government issued keys and badges. The Lessor shall be responsible for all cost associated with obtaining the government issued keys and badges from terminated employees. The Lessor shall also be responsible for any replacement costs as described in section on Keys and PIV Badge.

PART 5 - Safety and Infection Control

5.01 Work Methods

All work performed in delivering the services specified in this contract shall comply with applicable Federal, State, and local safety regulations.

5.02 Personal Protective Equipment (PPE)

Lessor shall be responsible for providing personal protection equipment and protective clothing to their employees as required based on the hazards they will be exposed to.

5.03 INFECTION CONTROL

A. Infection Control is critical in all medical center facilities.

Interior construction activities causing disturbance of existing dust, or creating new dust, must be conducted within ventilation-controlled areas that minimize the flow of airborne particles into patient areas. Exterior construction activities causing disturbance of soil or creates dust in some other manner must be controlled.

B. Work activities that go beyond maintenance that generate dust may require an Infection Control Permit in accordance with Chillicothe VAMC Standard Procedures. Coordinate work requirements with the COR prior to proceeding to determine if an Infection Control Permit will be required.

C. Products and Materials:

1. Sheet Plastic: Fire retardant polystyrene, 6-mil thickness or greater meeting local fire codes, may be used where dust control is the only hazard, and an agreement is reached with the COR

2. High Efficiency Particulate Air-Equipped filtration machine rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. HEPA filters should have ASHRAE 85 or other prefilter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Maintenance of equipment and replacement of the HEPA filters and other filters will be in accordance with manufacturer’s instructions.

3. Exhaust Hoses: Heavy duty, flexible steel reinforced; Ventilation Blower Hose

4. Adhesive Walk-off Mats: Provide minimum size mats of 24 inches x 36 inches

5. Disinfectant: Hospital-approved disinfectant or equivalent product

6. Portable Ceiling Access Module

D. Before any construction on site begins, all Lessor personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.

E. A dust control program will be established and maintained as part of the Lessor’s infection preventive measures in accordance with the Facility Guideline Institute (FGI) Guidelines for Design and Construction of Healthcare Facilities. Prior to start of work, prepare a plan detailing project-specific dust protection measures with associated product data, including periodic status reports, and submit to Contracting Officer Representative for review for compliance with contract requirements.

F. Medical center Infection Control personnel shall at their discretion have access to the site to monitor for airborne disease (e.g.

aspergillosis) during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality with safe thresholds established.

G. In general, the following preventive measures shall be adopted during construction to keep down dust and prevent mold.

1. Lessor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. HEPA filtration is required where the exhaust dust may reenter the medical center.

2. Exhaust hoses shall be exhausted so that dust is not reintroduced to the medical center.

3. Adhesive Walk-off/Carpet Walk-off Mats shall be used at all interior transitions from the construction area to occupied medical center area.

These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times.

4. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently. Remove debris as it is created. Transport these outside the construction area in containers with tightly fitting lids.

5. The Lessor shall not haul debris through patient-care areas without prior approval of the Contracting Officer Representative . When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.

6. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours.

Remove and dispose of porous materials that remain damp for more than 72 hours.

7. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.

H. Final Cleanup:

1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.

2. Perform HEPA vacuum cleaning of all surfaces in the construction area.

This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.

3. All new air ducts shall be cleaned prior to final inspection.

I. Exterior Construction

1. Lessor shall verify that dust will not be introduced into the medical center through intake vents, or building openings. HEPA filtration on intake vents is required where dust may be introduced.

2. Dust created from disturbance of soil such as from vehicle movement will be wetted with use of a water truck as necessary

3. All cutting, drilling, grinding, sanding, or disturbance of materials shall be accomplished with tools equipped with either local exhaust ventilation (i.e. vacuum systems) or wet suppression controls.

PART 6 - VA PIV Badge

All personnel shall also be required to be badged with a PIV badge issued from the Chillicothe VAMC in accordance with the most current version of Chillicothe VAMC PIV Badging Instructions. Additionally applicable to these personnel are VA Handbook 6500.6 Appendix B VA Acquisition Regulation Solicitation Provision and Contract Clause, VA Handbook 6500.6 Appendix C VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE FOR INCLUSION INTO CONTRACTS, and these personnel shall be required to annually sign VA Handbook 6500.6 Appendix D CONTRACTOR RULES OF BEHAVIOR and Submit to the Contracting Officer and Contracting Officer Representative. The PIV badge will be required to gain access to areas for cleaning. Contractor shall be responsible for all travel expenses related to obtaining said badge, and any replacements thereafter.

Contractor employees shall wear the Government furnished badge on the front of their outer clothing, except for protective clothing. When an employee leaves the Contractor's employment, the Contractor shall return all identification badges and passes of the employee issued by the Government to the COR or security personnel within five working days after termination of their employment.

PART 7 - VA HANDBOOK 6500.6 Appendix B VA Acquisition Regulation Solicitation Provision and Contract Clause

852.273-75 - SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY

RESOURCES (INTERIM- OCTOBER 2008)

As prescribed in 839.201, insert the following clause:

The contractor, their personnel, and their subcontractors shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in this contract.

PART 8 - VA HANDBOOK 6500.6 Appendix C VA INFORMATION AND INFORMATION SYSTEM

SECURITY/PRIVACY LANGUAGE FOR INCLUSION INTO CONTRACTS

1. GENERAL

Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

2. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS

a. A contractor/subcontrator shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.

b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.

c. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness.

d. Custom software development and outsourced operations must be located in the U.S. to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor/subcontractor must state where all non-U.S.

services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor.

e. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor’s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.

3. VA INFORMATION CUSTODIAL LANGUAGE

a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).

b. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor’s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with VA’s sanitization requirements. VA reserves the right to conduct on site inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements.

c. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.

d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract.

e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.

f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.

g. If a VHA contract is terminated for cause, the associated BAA must also be terminated and appropriate actions taken in accordance with VHA Handbook 1600.01, Business Associate Agreements. Absent an agreement to use or disclose protected health information, there is no business associate relationship.

h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.

i. The contractor/subcontractor’s firewall and Web services security controls, if applicable, shall meet or exceed VA’s minimum requirements.

VA Configuration Guidelines are available upon request.

j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or

(ii) with VA’s prior written approval. The contractor/subcontractor must refer all requests for, demands for production of, or inquiries about, VA information and information systems to the VA contracting officer for response.

k. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the above mentioned information, that contractor/subcontractor shall immediately refer such court orders or other requests to the VA contracting officer for response.

l. For service that involves the storage, generating, transmitting, or exchanging of VA sensitive information but does not require C&A or an MOU- ISA for system interconnection, the contractor/subcontractor must complete a Contractor Security Control Assessment (CSCA) on a yearly basis and provide it to the COR.

4. INFORMATION SYSTEM DESIGN AND DEVELOPMENT

a. Information systems that are designed or developed for or on behalf of VA at non-VA facilities shall comply with all VA directives developed in accordance with FISMA, HIPAA, NIST, and related VA security and privacy control requirements for Federal information systems. This includes standards for the protection of electronic PHI, outlined in 45 C.F.R. Part 164, Subpart C, information and system security categorization level designations in accordance with FIPS 199 and FIPS 200 with implementation of all baseline security controls commensurate with the FIPS 199 system security categorization (reference Appendix D of VA Handbook 6500, VA Information Security Program). During the development cycle a Privacy Impact Assessment (PIA) must be completed, provided to the COR, and approved by the VA Privacy Service in accordance with Directive 6507, VA Privacy Impact Assessment.

b. The contractor/subcontractor shall certify to the COR that applications are fully functional and operate correctly as intended on systems using the VA Federal Desktop Core Configuration (FDCC), and the common security configuration guidelines provided by NIST or the VA. This includes Internet Explorer 7 configured to operate on Windows XP and Vista (in Protected Mode on Vista) and future versions, as required.

c. The standard installation, operation, maintenance, updating, and patching of software shall not alter the configuration settings from the VA approved and FDCC configuration. Information technology staff must also use the Windows Installer Service for installation to the default “program files” directory and silently install and uninstall.

d. Applications designed for normal end users shall run in the standard user context without elevated system administration privileges.

e. The security controls must be designed, developed, approved by VA, and implemented in accordance with the provisions of VA security system development life cycle as outlined in NIST Special Publication 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems, VA Handbook 6500, Information Security Program and VA Handbook 6500.5, Incorporating Security and Privacy in System Development Lifecycle.

f. The contractor/subcontractor is required to design, develop, or operate a System of Records Notice (SOR) on individuals to accomplish an agency function subject to the Privacy Act of 1974, (as amended), Public Law 93- 579, December 31, 1974 (5 U.S.C. 552a) and applicable agency regulations.

Violation of the Privacy Act may involve the imposition of criminal and civil penalties.

g. The contractor/subcontractor agrees to:

(1) Comply with the Privacy Act of 1974 (the Act) and the agency rules and regulations issued under the Act in the design, development, or operation of any system of records on individuals to accomplish an agency function when the contract specifically identifies:

(a) The Systems of Records (SOR); and

(b) The design, development, or operation work that the contractor/subcontractor is to perform;

(2) Include the Privacy Act notification contained in this contract in every solicitation and resulting subcontract and in every subcontract awarded without a solicitation, when the work statement in the proposed subcontract requires the redesign, development, or operation of a SOR on individuals that is subject to the Privacy Act; and

(3) Include this Privacy Act clause, including this subparagraph (3), in all subcontracts awarded under this contract which requires the design, development, or operation of such a SOR.

h. In the event of violations of the Act, a civil action may be brought against the agency involved when the violation concerns the design, development, or operation of a SOR on individuals to accomplish an agency function, and criminal penalties may be imposed upon the officers or employees of the agency when the violation concerns the operation of a SOR on individuals to accomplish an agency function. For purposes of the Act, when the contract is for the operation of a SOR on individuals to accomplish an agency function, the contractor/subcontractor is considered to be an employee of the agency.

(1) “Operation of a System of Records” means performance of any of the activities associated with maintaining the SOR, including the collection, use, maintenance, and dissemination of records.

(2) “Record” means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, education, financial transactions, medical history, and criminal or employment history and contains the person’s name, or identifying number, symbol, or any other identifying particular assigned to the individual, such as a fingerprint or voiceprint, or a photograph.

(3) “System of Records” means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual.

i. The vendor shall ensure the security of all procured or developed systems and technologies, including their subcomponents (hereinafter referred to as “Systems”), throughout the life of this contract and any extension, warranty, or maintenance periods. This includes, but is not limited to workarounds, patches, hotfixes, upgrades, and any physical components (hereafter referred to as Security Fixes) which may be necessary to fix all security vulnerabilities published or known to the vendor anywhere in the Systems, including Operating Systems and firmware.

The vendor shall ensure that Security Fixes shall not negatively impact the Systems.

j. The vendor shall notify VA within 24 hours of the discovery or disclosure of successful exploits of the vulnerability which can compromise the security of the Systems (including the confidentiality or integrity of its data and operations, or the availability of the system).

Such issues shall be remediated as quickly as is practical, but in no event longer than ____ days.

k. When the Security Fixes involve installing third party patches (such as Microsoft OS patches or Adobe Acrobat), the vendor will provide written notice to the VA that the patch has been validated as not affecting the Systems within 10 working days. When the vendor is responsible for operations or maintenance of the Systems, they shall apply the Security Fixes within ____ days.

l. All other vulnerabilities shall be remediated as specified in this paragraph in a timely manner based on risk, but within 60 days of discovery or disclosure. Exceptions to this paragraph (e.g. for the convenience of VA) shall only be granted with approval of the contracting officer and the VA Assistant Secretary for Office of Information and Technology.

5. INFORMATION SYSTEM HOSTING, OPERATION, MAINTENANCE, OR USE

a. For information systems that are hosted, operated, maintained, or used on behalf of VA at non-VA facilities, contractors/subcontractors are fully responsible and accountable for ensuring compliance with all HIPAA, Privacy Act, FISMA, NIST, FIPS, and VA security and privacy directives and handbooks. This includes conducting compliant risk assessments, routine vulnerablity scanning, system patching and change management procedures, and the completion of an acceptable contingency plan for each system. The contractor’s security control procedures must be equivalent, to those procedures used to secure VA systems. A Privacy Impact Assessment (PIA) must also be provided to the COR and approved by VA Privacy Service prior to operational approval. All external Internet connections to VA’s network involving VA information must be reviewed and approved by VA prior to implementation.

b. Adequate security controls for collecting, processing, transmitting, and storing of Personally Identifiable Information (PII), as determined by the VA Privacy Service, must be in place, tested, and approved by VA prior to hosting, operation, maintenance, or use of the information system, or systems by or on behalf of VA. These security controls are to be assessed and stated within the PIA and if these controls are determined not to be in place, or inadequate, a Plan of Action and Milestones (POA&M) must be submitted and approved prior to the collection of PII.

c. Outsourcing (contractor facility, contractor equipment or contractor staff) of systems or network operations, telecommunications services, or other managed services requires certification and accreditation (authorization) (C&A) of the contractor’s systems in accordance with VA Handbook 6500.3, Certification and Accreditation and/or the VA OCS Certification Program Office. Government-owned (government facility or government equipment) contractor-operated systems, third party or business partner networks require memorandums of understanding and interconnection agreements (MOU-ISA) which detail what data types are shared, who has access, and the appropriate level of security controls for all systems connected to VA networks.

d. The contractor/subcontractor’s system must adhere to all FISMA, FIPS, and NIST standards related to the annual FISMA security controls assessment and review and update the PIA. Any deficiencies noted during this assessment must be provided to the VA contracting officer and the ISO for entry into VA’s POA&M management process. The contractor/subcontractor must use VA’s POA&M process to document planned remedial actions to address any deficiencies in information security policies, procedures, and practices, and the completion of those activities. Security deficiencies must be corrected within the timeframes approved by the government.

Contractor/subcontractor procedures are subject to periodic, unannounced assessments by VA officials, including the VA Office of Inspector General.

The physical security aspects associated with contractor/subcontractor activities must also be subject to such assessments. If major changes to the system occur that may affect the privacy or security of the data or the system, the C&A of the system may need to be reviewed, retested and re-authorized per VA Handbook 6500.3. This may require reviewing and updating all of the documentation (PIA, System Security Plan, Contingency Plan). The Certification Program Office can provide guidance on whether a new C&A would be necessary.

e. The contractor/subcontractor must conduct an annual self assessment on all systems and outsourced services as required. Both hard copy and electronic copies of the assessment must be provided to the COR. The government reserves the right to conduct such an assessment using government personnel or another contractor/subcontractor. The contractor/subcontractor must take appropriate and timely action (this can be specified in the contract) to correct or mitigate any weaknesses discovered during such testing, generally at no additional cost.

f. VA prohibits the installation and use of personally-owned or contractor/subcontractor-owned equipment or software on VA’s network. If non-VA owned equipment must be used to fulfill the requirements of a contract, it must be stated in the service agreement, SOW or contract. All of the security controls required for government furnished equipment (GFE) must be utilized in approved other equipment (OE) and must be funded by the owner of the equipment. All remote systems must be equipped with, and use, a VA-approved antivirus (AV) software and a personal (host-based or enclave based) firewall that is configured with a VA- approved configuration. Software must be kept current, including all critical updates and patches. Owners of approved OE are responsible for providing and maintaining the anti-viral software and the firewall on the non-VA owned OE.

g. All electronic storage media used on non-VA leased or non-VA owned IT equipment that is used to store, process, or access VA information must be handled in adherence with VA Handbook 6500.1, Electronic Media Sanitization upon: (i) completion or termination of the contract or (ii) disposal or return of the IT equipment by the contractor/subcontractor or any person acting on behalf of the contractor/subcontractor, whichever is earlier. Media (hard drives, optical disks, CDs, back-up tapes, etc.) used by the contractors/subcontractors that contain VA information must be returned to the VA for sanitization or destruction or the contractor/subcontractor must self-certify that the media has been disposed of per 6500.1 requirements. This must be completed within 30 days of termination of the contract.

h. Bio-Medical devices and other equipment or systems containing media (hard drives, optical disks, etc.) with VA sensitive information must not be returned to the vendor at the end of lease, for trade-in, or other purposes. The options are:

(1) Vendor must accept the system without the drive;

(2) VA’s initial medical device purchase includes a spare drive which must be installed in place of the original drive at time of turn-in; or

(3) VA must reimburse the company for media at a reasonable open market replacement cost at time of purchase.

(4) Due to the highly specialized and sometimes proprietary hardware and software associated with medical equipment/systems, if it is not possible for the VA to retain the hard drive, then;

(a) The equipment vendor must have an existing BAA if the device being traded in has sensitive information stored on it and hard drive(s) from the system are being returned physically intact; and

(b) Any fixed hard drive on the device must be non-destructively sanitized to the greatest extent possible without negatively impacting system operation. Selective clearing down to patient data folder level is recommended using VA approved and validated overwriting technologies/methods/tools. Applicable media sanitization specifications need to be pre- approved and described in the purchase order or contract.

(c) A statement needs to be signed by the Director (System Owner) that states that the drive could not be removed and that (a) and (b) controls above are in place and completed. The ISO needs to maintain the documentation.

6. SECURITY INCIDENT INVESTIGATION

a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures.

The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.

b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.

c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.

d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.

7. LIQUIDATED DAMAGES FOR DATA BREACH

a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.

b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.

c. Each risk analysis shall address all relevant information concerning the data breach, including the following:

(1) Nature of the event (loss, theft, unauthorized access);

(2) Description of the event, including:

(a) date of occurrence;

(b) data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code;

(3) Number of individuals affected or potentially affected;

(4) Names of individuals or groups affected or potentially affected;

(5) Ease of logical data access to the lost, stolen or improperly accessed data in light of the degree of protection for the data, e.g., unencrypted, plain text;

(6) Amount of time the data has been out of VA control;

(7) The likelihood that the sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons);

(8) Known misuses of data containing sensitive personal information, if any;

(9) Assessment of the potential harm to the affected individuals;

(10) Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate; and

(11) Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised.

d. Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $ _______ per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following:

(1) Notification;

(2) One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports;

(3) Data breach analysis;

(4) Fraud resolution services, including writing dispute letters, initiating fraud alerts and credit freezes, to assist affected individuals to bring matters to resolution;

(5) One year of identity theft insurance with $20,000.00 coverage at $0 deductible; and

(6) Necessary legal expenses the subjects may incur to repair falsified or damaged credit records, histories, or financial affairs.

8. SECURITY CONTROLS COMPLIANCE TESTING

On a periodic basis, VA, including the Office of Inspector General, reserves the right to evaluate any or all of the security controls and privacy practices implemented by the contractor under the clauses contained within the contract. With 10 working-day’s notice, at the request of the government, the contractor must fully cooperate and assist in a government-sponsored security controls assessment at each location wherein VA information is processed or stored, or information systems are developed, operated, maintained, or used on behalf of VA, including those initiated by the Office of Inspector General. The government may conduct a security control assessment on shorter notice (to include unannounced assessments) as determined by VA in the event of a security incident or at any other time.

9. TRAINING

a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems:

(1) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix D relating to access to VA information and information systems;

(2) Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;

(3) Successfully complete the appropriate VA privacy training and annually complete required privacy training; and

(4) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system access [to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document – e.g., any role-based information security training required in accordance with NIST Special Publication 800-16, Information Technology Security Training Requirements.]

b. The contractor shall provide to…