Exhibit J - Tenant Improvement Cost Summary TICs.xlsx

XLSX spreadsheet 433 KB Posted

Attached to
X1DB - Lancaster, OH VA Clinic - New/Replacing Lease
Solicitation number
36C25024R0004
Issued by

About this file

This document contains a request for lease proposal from the Department of Veterans Affairs seeking to lease approximately 17,381 ABOA square feet of space and 95 parking spaces, including 4 ADA accessible spaces, for use as a Community Based Outpatient Clinic in Lancaster, Ohio. The space must be located within an area bounded by Coonpath Road/Highway 31 to the north, Duffy Road SE, Lawrence Street, S Maple Street, E. Main Street, Cedar Hill Road, and Lancaster-Circleville Road SW to the south, Lake Road NE and Lake Road SE to the east, and Route 33 to the west. The VA will only consider space located in an existing building and that will not disrupt current VA operations or patient services. Responses are due by December 31, 1899.

View the file

Other files

File Type Posted
Exhibit W - Finish Requirement - ISSUED - 05.20.2024.pdf PDF
36C25024R0004 - AMEND 0002 - ISSUED.pdf PDF
RLP 36C25024R0004 -Amended 05.20.2024 - ISSUED.pdf PDF
36C25024R0004 0001.pdf PDF
36C25024R0004.pdf PDF
Exhibit D - GSA 3516 Solicitation Provisions.pdf PDF
RLP 36C25024R0004 -Lancaster OH VA Clinic.pdf PDF
Exhibit U - VA Handbook 6500 6 Contract Security Appendix A.pdf PDF
Exhibit B - Agency Specific Requirements.pdf PDF
Exhibit M - DOL Wage JAN 2024.pdf PDF
Exhibit C - FSL II Requirements and Pricing.pdf PDF
Exhibit O - Contract Confidentiality Certificate.pdf PDF
Exhibit H - GSA 12000 Prelease FPLS.pdf PDF
Exhibit T - Clinic Janitorial Service and Pest Control 15 Dec. 2023.pdf PDF
Exhibit E - GSA Form 3517B General Clauses.pdf PDF
Exhibit R - 527 Contract Qualifications.pdf PDF
Exhibit K - Past Performance Survey.pdf PDF
Exhibit V - PIV Badge Instructions and Attachments - CBOC - Combined with Attachments.pdf PDF
Exhibit S - SF330 A-E Qualifications.pdf PDF
Exhibit G - 1217 Lessor Annual Cost Statement.pdf PDF
Exhibit P - Op and Maintenance Plan.pdf PDF
Exhibit I - Lancaster Clinic Conceptual Drawing Schedules and Design Requirements.pdf PDF
Exhibit Q - Certificate of Bldg Performance.pdf PDF
Exhibit A - 36C25024L0006 Lancaster.pdf PDF
Exhibit F - 1364 Proposal to Lease Space.pdf PDF
Exhibit L - Program for Design.pdf PDF
Exhibit N - FAR 52.204-24.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TICS

TENANT IMPROVEMENTS COST SUMMARY (TICS)
for0ABOA SF=- 0
Agency:0TIA PER ABOA SF=$ - 0
December 31, 1899Location:December 31, 1899TOTAL TIA$ - 0
RU FactorERROR:#DIV/0!RSF=- 0
Masterformat CSISystem ElementsTI*SHELL**
Div 1General Requirements$ - 0$ - 0
Div 2Site work & Demolition$ - 0$ - 0
Div 3Concrete$ - 0$ - 0
Div 4Foundations / Masonry$ - 0$ - 0
Div 5Metals$ - 0$ - 0
Div 6Woods & Plastics$ - 0$ - 0
Div 7Thermal & Moisture$ - 0$ - 0
Div 8Doors & Windows$ - 0$ - 0
Div 9Finishes$ - 0$ - 0
Div 10Specialties$ - 0$ - 0
Div 11Equipment$ - 0$ - 0
Div 12Furnishings$ - 0$ - 0
Div 13Special Construction$ - 0$ - 0
Div 15General Construction$ - 0$ - 0
Div 21Fire Suppression$ - 0$ - 0
Div 22Plumbing$ - 0$ - 0
Div 23HVAC$ - 0$ - 0
Div 26.1Electrical$ - 0$ - 0
Div 26.2Lighting$ - 0$ - 0
Div 27Communications, Security & Other Elec. Systems$ - 0$ - 0
Div 28.1Electrical safety & Security$ - 0$ - 0
Div 28.2Security$ - 0$ - 0
Div 32Exterior$ - 0$ - 0
SubtotalTrade Costs$ - 0$ - 0
General Contractor FeePercent$ - 0$ - 0
SubtotalConstruction Costs$ - 0$ - 0
Architectural & Engineering Fees (NIC DID costs)lump sum$ - 0$ - 0
Other Lessor Costs Established Under the Lease$ - 0$ - 0
SubtotalLessor's Costs:$ - 0$ - 0
Lessor's Project Management FeePercent$ - 0
TotalPrice to Government:GRAND TOTAL$ - 0
Cost per ABOA SFERROR:#DIV/0!ERROR:#DIV/0!
Notes:Cost per RSFERROR:#DIV/0!ERROR:#DIV/0!
*Include all subcontractors' costs.
**Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.

&"Arial,Bold"

Page &P

Impact

HIGH IMPACT PERCENTAGE COST ANALYSIS

Cost Impact DescriptionCalculation
ApproximateResulting
% ImpactCost Impact
StructureERROR:#REF!
Structural Upgrades33.0%ERROR:#REF!
foundation workERROR:#REF!
New Constr Additions (e.g.In-fill)ERROR:#REF!
ExteriorERROR:#REF!
Façade Upgrade & ReconditioningERROR:#REF!
Window repairERROR:#REF!
Window replacementERROR:#REF!
RoofERROR:#REF!
RepairERROR:#REF!
ReplacementERROR:#REF!
InteriorERROR:#REF!
Vacant space recaptureERROR:#REF!
Lobby upgradesERROR:#REF!
Tenant FitoutERROR:#REF!
Common Areas/lobbiesERROR:#REF!
ElevatorERROR:#REF!
Shaft UpgradesERROR:#REF!
MachineryERROR:#REF!
CabsERROR:#REF!
PlumbingERROR:#REF!
Central Equipment10.0%ERROR:#REF!
PipingERROR:#REF!
FixturesERROR:#REF!
HVACERROR:#REF!
Upgrades (Chillers, Boilers, Air Handlers)10.0%ERROR:#REF!
ReplacementsERROR:#REF!
DuctworkERROR:#REF!
Piping systemsERROR:#REF!
ElectricalERROR:#REF!
TransformersERROR:#REF!
SwitchgearERROR:#REF!
PanelsERROR:#REF!
Bus duct & WiringERROR:#REF!
Fire ProtectionERROR:#REF!
sprinklers5.0%ERROR:#REF!
alarm/detectionERROR:#REF!
StandpipeERROR:#REF!
SiteworkERROR:#REF!
RoadwaysERROR:#REF!
Parking repairs/upgradesERROR:#REF!
Plaza repairs/upgradesERROR:#REF!
Historic Restoration5.0%ERROR:#REF!
Security/Blast/Glass Frag.ERROR:#REF!
ADA10.0%ERROR:#REF!
SeismicERROR:#REF!
EnergyERROR:#REF!
Hazmat7.0%ERROR:#REF!
Asbestos20.0%ERROR:#REF!
LeadERROR:#REF!
PCB'sERROR:#REF!
Other Special RequirementsERROR:#REF!
Balance Not Accounted for >>>ERROR:#REF!ERROR:#REF!
ECCA100.0%ERROR:#REF!

Class

PROJECT CLASSIFICATION

The following cost assignments proportion estimated total project costs to reflect
project focus and character. Entries are based upon the primary purpose behind
work item development.

CATEGORY COST

1. General Repair $0.00

2. FireSafety

3. Asbestos

4. Seismic Safety

5. Historic Preservation

6. Accessibility

7. Courts Space

8. Energy Conservation

Estimated Total Project Cost: $0.00

Date Prepared:
ERROR:#REF!ERROR:#REF!

Code

New Construction2
Repair and Alterations

INPUT PROJECT INFO

INFORMATION NEEDED TO COMPLETE TICS TABLEFALSE
TRUE
LEASE GS-XXX-XXXXX or ProjectFALSE
AgencyTRUE
Location: City, StateTRUE
FALSE
ABOA SF =General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =
RSF=
DATE:
Tenant Improvement General Contractor Feepercent
Shell General Contractor Feepercent
Tenant Improvement A/E Fees (per Lease)lump sumFor A/E fees established as a cost per ABOA sf, convert rate to lump sum.
Shell A/E Feeslump sum
Lessor's TI Project Management Fee (per Lease)percentpercent
Other Lessor Costs Established Under the Leaselump sum

TI Shell

TOTAL $ - 0 $ - 0

INSTRUCTIONS

INSTRUCTIONS

Read and understand SHELL DEFINITION tab.

Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.

Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.

Material
Description Accurately describe each item being priced.
Quantity List the quantity e.g., 1,2, 3, etc.
Unit (Example) LS,EA,GAL,LF, SF, etc.
Cost Amount
Total Total cost of all material.
Labor
HoursTime projected to perform the task.
Labor RateCost per hour of labor.
Total Cost of labor.
TOTAL Combines overall materials and labor.
Shell

1. Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL DEFINITION'S tab.

2. Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.

Tenant Improvements (TI)

TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1. Fill out fields titled (TI), inputting only costs associated with (TI).

2. Fill each division tab 1-32 as needed for the construction to be performed under the (TI) costs as indicated above.

DATE PREPARED
CONSTRUCTION COST ESTIMATEJanuary 0, 1900
DIVISION 9 - FINISHES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
XYZ Paint1GAL.$25.00$25.002.5$36.25$90.63
$0.00$0.00
$0.00$0.00
Total$25.00Total$90.63
TOTAL$115.63
DIVISION 9 - FINISHES (SHELL)
ABC Paint10GAL.$27.00$270.006.0$36.25$217.50
$0.00$0.00
$0.00$0.00
Total$270.00Total$217.50
TOTAL$487.50

SHELL DEFINITIONS

Per GSA Pricing Desk Guide, 4th Edition.

GSA Pricing Desk Guide's reference to minimum power distribution of 7 watts per USF is outdated; lease requirement is minimum of 4 watts per ABOA SF

COST SUMMARY

CONSTRUCTION COST ESTIMATEMaterials
TIShell
DIVISION 1 GENERAL REQUIREMENTS$ - 0$ - 0$ - 0
DIVISION 2 SITE WORK AND DEMOLITION$ - 0$ - 0$ - 0
DIVISION 3 CONCRETE$ - 0$ - 0$ - 0
DIVISION 4 MASONRY$ - 0$ - 0$ - 0
DIVISION 5 METALS$ - 0$ - 0$ - 0
DIVISION 6 WOOD AND PLASTICS$ - 0$ - 0$ - 0
DIVISION 7 THERMAL & MOISTURE$ - 0$ - 0$ - 0
DIVISION 8 DOORS AND WINDOWS$ - 0$ - 0$ - 0
DIVISION 9 FINISHES$ - 0$ - 0$ - 0
DIVISION 10 SPECIALTIES$ - 0$ - 0$ - 0
DIVISION 11 EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 12 FURNISHINGS & EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 13 SPECIAL CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 15 GEN CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 21 FIRE SUPPRESSION SYSTEMS$ - 0$ - 0$ - 0
DIVISION 22 PLUMBING$ - 0$ - 0$ - 0
DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING$ - 0$ - 0$ - 0
DIVISION 26.1 ELECTRICAL$ - 0$ - 0$ - 0
DIVISION 26.2 LIGHTING$ - 0$ - 0$ - 0
DIVISION 27 COMMUNICATIONS$ - 0$ - 0$ - 0
DIVISION 28.1 ELECTRONIC, SAFETY$ - 0$ - 0$ - 0
DIVISION 28.2 SECURITY$ - 0$ - 0$ - 0
DIVISION 32 EXTERIOR$ - 0$ - 0$ - 0

TOTAL $ - 0 $ - 0 $ - 0

Div 1 - GENERAL REQUIREMENTS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 1 - GENERAL REQUIREMENTS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 1 - GENERAL REQUIREMENTS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 2 - SITE WORK AND DEMO

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 2 - SITE WORK AND DEMOLITION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 2 - SITE WORK AND DEMOLITION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 3 - CONCRETE

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 3 - CONCRETE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 3 - CONCRETE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 4 - MASONRY

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 4 - MASONRY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 4 - MASONRY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 5 - METAL

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 5 - METALS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 5 - METALS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 6 - WOOD & PLASTICS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 6 - WOOD AND PLASTICS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 6 - WOOD AND PLASTICS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 7 - THERMAL & MOISTURE

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 7 - THERMAL & MOISTURE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 7 - THERMAL & MOISTURE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 8 - DOORS & WINDOWS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 8 - DOORS & WINDOWS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 8 - DOORS & WINDOWS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 9 - FINISHES

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 9 - FINISHES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 9 - FINISHES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 10 - SPECIALTIES

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 10 - SPECIALTIES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 10 - SPECIALTIES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 11 - EQUIPMENT

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 11 - EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 11 - EQUIPMENT (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 12 - FURNISHINGS & EQUIP

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 12 - FURNISHINGS & EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 12 - FURNISHINGS & EQUIPMENT (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 13 - SPECIAL CONSTRUCTION

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 13 - SPECIAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 13 - SPECIAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 15 - GEN CONSTRUCTION

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 15 - GENERAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 15 - GENERAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 21 - FIRE SUPPRESSION

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 22 - PLUMBING

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 22 - PLUMBING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 22 - PLUMBING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 23 - HVAC

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 23 - HVAC (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 23 - HVAC (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 26.1 - ELECTRICAL

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 26.1 - ELECTRICAL (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.2 - ELECTRICAL (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 26.2 - LIGHTING

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 26.2 - LIGHTING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTINC. O & PTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.2 - LIGHTING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 27 - COMMUNICATIONS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 27 - COMMUNICATIONS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 27 - COMMUNICATIONS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 28.1 - ELECTRIC, SAFETY

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 28.1- ELECTRICAL SAFETY (TI),
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.1 - ELECTRICAL, SAFETY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 28.2 - SECURITY

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 28.2 - SECURITY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.2 - SECURITY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 32 - EXTERIOR

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 32 - EXTERIOR (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 32 - EXTERIOR (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

image1.jpeg image2.jpeg image3.png

File details come from the government source that posted it. Updated .