EXHIBIT_N_-_Mandatory_Shutdown_times.pdf

PDF 131 KB Posted

Attached to
Sources Sought notice - JMMU Range at Fort Hood, TX
Solicitation number
DOIDFBO260051
Issued by

About this file

This document is an exhibit establishing mandatory shutdown times for a federal contract spanning from March 2026 through February 2027. The shutdown schedule specifies two daily shutdown windows for most periods: a morning window and an evening window. Morning shutdowns generally occur between 0630-0830 hours, with the exception of July 2026 (0600-0800) and December 2026 (0730-0930). Evening shutdowns vary by period, ranging from 1630-1830 hours (November 2 and December 1, 2026) to 1930-2130 hours (May through August 2026), with most other months observing 1830-2030 hours. The latest evening shutdown times occur during the May through August 2026 period, while the earliest evening shutdowns are scheduled for November 2 and December 1, 2026.

The contractor must ensure all operations cease during these mandatory shutdown windows throughout the contract period. The varying shutdown times suggest operational adjustments that may correspond to seasonal changes or specific project requirements. No other contractual terms, service requirements, or performance expectations are detailed in this exhibit.

View the file

Other files

File Type Posted
EXHIBIT_AA___DMMU_MAT_System_locations_and_existing_conditions.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_D_-_Drainage_(ditches_culverts_and_sump_pumps).pdf PDF
Fort_Hood_JMMU_Range_Upgrades_WORKIN_DRAFT_SOW_9Apr26.pdf PDF
EXHIBIT_Y_-_Range_Limit_Marker_Design.pdf PDF
EXHIBIT_L_-_JMMU_RANGE_SITE_SUMMARY_PCs_AND_CAMERA.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_E_-_Power_Centers.pdf PDF
EXHIBIT_W_-_CCI-TII_Checklist.pdf PDF
EXHIBIT_V_-_CCI-TII_Checklist_Instructions.pdf PDF
EXHIBIT_A_-_FTHOOD-JMMU-AERIAL.pdf PDF
EXHIBIT_X_-_Portable_HSAT_Specifications.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_F_-_Fiber_Optics.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_B_-_Clusters_and_Moving_Infantry_Targets_(MITs).pdf PDF
EXHIBIT_M_-_Species_List_for_Range_Seed.pdf PDF
EXHIBIT_U_-_Gate_Design.pdf PDF
EXHIBIT_B_-_JMMU_CLUSTER_LOCATIONS_FOR_MIT_LOCATIONS.pdf PDF
EXHIBIT_P_-_ELECTRICAL_AND_COMMUNICATIONS.pdf PDF
EXHIBIT_E___Cluster_MIT_V-Shape_Formation.pdf PDF
EXHIBIT_T_-_Portable_Armored_Target_Protection.pdf PDF
EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf PDF
EXHIBIT_O___Summary_Target_Electrical_and_Communications.pdf PDF
EXHIBIT_C_-_JMMU_MAT54_MAT56__MAT58___AT60_CROSS-SECTION.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_A_-_Moving_Armored_Targets_(MATs).pdf PDF
EXHIBIT_S_-_Target_Protection_-_July_2017.pdf PDF
EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf PDF
EXHIBIT_H_-_SIT_Cluster_November_2018.pdf PDF
EXHIBIT_G_-_Moving_InfantryTarget_(MIT)_-_Aug2017.pdf PDF
EXHIBIT_Z_-_JMMU_SACON_Trench_System_Repairs.pdf PDF
EXHIBIT_K_-_TXDOT_Concrete_Repair_Manual_crm.pdf PDF
EXHIBIT_D_-_Moving_Armor_Target_MAT_Locations.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_C_-_Startionary_Armored_Targets_(SATs).pdf PDF
EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT M - Mandatory Shutdown times

• MANDATORY SHUT DOWN HOURS ARE:

• (9-31 Mar 26) 0630-0830, 1830-2030

• (Apr 26) 0630-0830, 1830-2030

• (May 26) 0630-0830, 1930-2130

• (Jun 26) 0630-0830, 1930-2130

• (Jul 26) 0600-0800, 1930-2130

• (Aug 26) 0630-0830, 1930-2130

• (Sep 26) 0630-0830, 1830-2030

• (Oct 26) 0630-0830, 1830-2030

(1 Nov 26) 0630-0830, 1830-2030

• (2 Nov 26) 0630-0830, 1630-1830

• (1 Dec 26) 0730-0930, 1630-1830

• (1 Jan 27) 0630-0830, 1730-1930

• (1 Feb 27) 0630-0830, 1730-1930

File details come from the government source that posted it. Updated .