EXHIBIT_D_-_Moving_Armor_Target_MAT_Locations.pdf

PDF 681 KB Posted

Attached to
Sources Sought notice - JMMU Range at Fort Hood, TX
Solicitation number
DOIDFBO260051
Issued by

About this file

This is an exhibit mapping document for Moving Armor Target (MAT) locations at a military installation (JMMU). The aerial map displays the Location of Interest (LOA) and identifies multiple target positioning areas marked with various colored overlays indicating specific construction and modification requirements.

The legend identifies three categories of work: green-outlined areas requiring modification to achieve 72-inch wall height; red-outlined areas requiring construction of a mover protective berm with 72-inch minimum width (MW); and a yellow-outlined area marking the location of an old dam built in 2001 that will be repurposed for construction of an MV52 wall. The map includes road networks (paved roads, service roads, and course routes) with grid references (columns 16-21, rows 55-57) and distance markers (ranging from 50 meters to 1,200 meters) to facilitate navigation and planning for construction activities.

View the file

Other files

File Type Posted
EXHIBIT_AA___DMMU_MAT_System_locations_and_existing_conditions.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_D_-_Drainage_(ditches_culverts_and_sump_pumps).pdf PDF
Fort_Hood_JMMU_Range_Upgrades_WORKIN_DRAFT_SOW_9Apr26.pdf PDF
EXHIBIT_Y_-_Range_Limit_Marker_Design.pdf PDF
EXHIBIT_L_-_JMMU_RANGE_SITE_SUMMARY_PCs_AND_CAMERA.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_E_-_Power_Centers.pdf PDF
EXHIBIT_W_-_CCI-TII_Checklist.pdf PDF
EXHIBIT_V_-_CCI-TII_Checklist_Instructions.pdf PDF
EXHIBIT_A_-_FTHOOD-JMMU-AERIAL.pdf PDF
EXHIBIT_X_-_Portable_HSAT_Specifications.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_F_-_Fiber_Optics.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_B_-_Clusters_and_Moving_Infantry_Targets_(MITs).pdf PDF
EXHIBIT_M_-_Species_List_for_Range_Seed.pdf PDF
EXHIBIT_U_-_Gate_Design.pdf PDF
EXHIBIT_B_-_JMMU_CLUSTER_LOCATIONS_FOR_MIT_LOCATIONS.pdf PDF
EXHIBIT_P_-_ELECTRICAL_AND_COMMUNICATIONS.pdf PDF
EXHIBIT_E___Cluster_MIT_V-Shape_Formation.pdf PDF
EXHIBIT_T_-_Portable_Armored_Target_Protection.pdf PDF
EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf PDF
EXHIBIT_O___Summary_Target_Electrical_and_Communications.pdf PDF
EXHIBIT_C_-_JMMU_MAT54_MAT56__MAT58___AT60_CROSS-SECTION.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_A_-_Moving_Armored_Targets_(MATs).pdf PDF
EXHIBIT_S_-_Target_Protection_-_July_2017.pdf PDF
EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf PDF
EXHIBIT_H_-_SIT_Cluster_November_2018.pdf PDF
EXHIBIT_G_-_Moving_InfantryTarget_(MIT)_-_Aug2017.pdf PDF
EXHIBIT_Z_-_JMMU_SACON_Trench_System_Repairs.pdf PDF
EXHIBIT_N_-_Mandatory_Shutdown_times.pdf PDF
EXHIBIT_K_-_TXDOT_Concrete_Repair_Manual_crm.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_C_-_Startionary_Armored_Targets_(SATs).pdf PDF
EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Moving Armor Target MAT Locations

LOA

LEGEND

MODIFY TO ACHIEVE 72-INCH

WALL HEIGHT

BUILD MOVER PROTECTIVE

BERM with 72-inch MW

Location of old dam built in 2001, to be used to build MV52 wall

EXHIBIT D

File details come from the government source that posted it. Updated .