This document is an exhibit displaying the geographic layout and infrastructure specifications for a targetry upgrade project at JMMU (likely a military installation). The project aims to upgrade targetry to current standards and support aerial gunnery operations across multiple locations including Power Centers, Cameras, Central Building, AAR Building, and CC Tower.
The scope of work encompasses installation and replacement of five Moving VehicleS (5-MV with 4 MOD. 1 units replaced), 15 clusters containing 105 SITs (Stationary Impact Targets), 3 combination SAT/Cluster units with 12 SITs, 13 MITs (Mobile Impact Targets), and 56 SATs (Stationary Air Targets) plus 3 combo SATs for a total of 59 SATs. The project also includes 17 Power Centers and three fixed camera locations (FC-5, FC-6, and FC-7) positioned at JM Tower and the General Instruction Building. Infrastructure work requires testing of 2,088 end-to-end fiber optic strands before and after construction, replacement of all target load center and data patch panels, and repair of damaged fiber and power infrastructure. The exhibit map displays the geographic distribution of equipment across the installation with designated paved roads, service roads, and course routes marked for reference.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POWER CENTERS, CAMERAS, CENTRAL BUILDING, AAR BUILDING, CC TOWER LOCATIONS
PURPOSE: to upgrade targetry to current standards and to support aerial Gunnery.
5-MV (4 MOD. 1 replaced) 15-Clusters (105 SITs) 3- Combination SAT/Cluster (12 SITs) 13 MITs 56 SATs (+ 3 combo SATs (59 Total)
17 Power Centers
JM TOWER
General Instruction Building
CAMERA
FC-5 CAMERA
FC-6
CAMERA
FC-7
PJ1A
PJ1B
PJ2B
PJ2A
PJ3A
PJ4A
PJ5A
PJ6A
PJ7A
PJ8A
PJ9A
PJ8B
PJ7BPJ6B
PJ5B
PJ4B
PJ3B
LOA
EXHIBIT L
2088 End to End fiber optic strands to be tested before and after construction.
Replacing all target load center and data patch panels.
Repair damaged fiber and power infrastructure.