This document is an exhibit displaying the geographic layout and infrastructure specifications for a targetry upgrade project at JMMU (likely a military installation). The project aims to upgrade targetry to current standards and support aerial gunnery operations across multiple locations including Power Centers, Cameras, Central Building, AAR Building, and CC Tower.

The scope of work encompasses installation and replacement of five Moving VehicleS (5-MV with 4 MOD. 1 units replaced), 15 clusters containing 105 SITs (Stationary Impact Targets), 3 combination SAT/Cluster units with 12 SITs, 13 MITs (Mobile Impact Targets), and 56 SATs (Stationary Air Targets) plus 3 combo SATs for a total of 59 SATs. The project also includes 17 Power Centers and three fixed camera locations (FC-5, FC-6, and FC-7) positioned at JM Tower and the General Instruction Building. Infrastructure work requires testing of 2,088 end-to-end fiber optic strands before and after construction, replacement of all target load center and data patch panels, and repair of damaged fiber and power infrastructure. The exhibit map displays the geographic distribution of equipment across the installation with designated paved roads, service roads, and course routes marked for reference.

View the file

Other files

File Type Posted
EXHIBIT_AA___DMMU_MAT_System_locations_and_existing_conditions.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_D_-_Drainage_(ditches_culverts_and_sump_pumps).pdf PDF
Fort_Hood_JMMU_Range_Upgrades_WORKIN_DRAFT_SOW_9Apr26.pdf PDF
EXHIBIT_Y_-_Range_Limit_Marker_Design.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_E_-_Power_Centers.pdf PDF
EXHIBIT_W_-_CCI-TII_Checklist.pdf PDF
EXHIBIT_V_-_CCI-TII_Checklist_Instructions.pdf PDF
EXHIBIT_A_-_FTHOOD-JMMU-AERIAL.pdf PDF
EXHIBIT_X_-_Portable_HSAT_Specifications.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_F_-_Fiber_Optics.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_B_-_Clusters_and_Moving_Infantry_Targets_(MITs).pdf PDF
EXHIBIT_M_-_Species_List_for_Range_Seed.pdf PDF
EXHIBIT_U_-_Gate_Design.pdf PDF
EXHIBIT_B_-_JMMU_CLUSTER_LOCATIONS_FOR_MIT_LOCATIONS.pdf PDF
EXHIBIT_P_-_ELECTRICAL_AND_COMMUNICATIONS.pdf PDF
EXHIBIT_E___Cluster_MIT_V-Shape_Formation.pdf PDF
EXHIBIT_T_-_Portable_Armored_Target_Protection.pdf PDF
EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf PDF
EXHIBIT_O___Summary_Target_Electrical_and_Communications.pdf PDF
EXHIBIT_C_-_JMMU_MAT54_MAT56__MAT58___AT60_CROSS-SECTION.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_A_-_Moving_Armored_Targets_(MATs).pdf PDF
EXHIBIT_S_-_Target_Protection_-_July_2017.pdf PDF
EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf PDF
EXHIBIT_H_-_SIT_Cluster_November_2018.pdf PDF
EXHIBIT_G_-_Moving_InfantryTarget_(MIT)_-_Aug2017.pdf PDF
EXHIBIT_Z_-_JMMU_SACON_Trench_System_Repairs.pdf PDF
EXHIBIT_N_-_Mandatory_Shutdown_times.pdf PDF
EXHIBIT_K_-_TXDOT_Concrete_Repair_Manual_crm.pdf PDF
EXHIBIT_D_-_Moving_Armor_Target_MAT_Locations.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_C_-_Startionary_Armored_Targets_(SATs).pdf PDF
EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POWER CENTERS, CAMERAS, CENTRAL BUILDING, AAR BUILDING, CC TOWER LOCATIONS

PURPOSE: to upgrade targetry to current standards and to support aerial Gunnery.

5-MV (4 MOD. 1 replaced) 15-Clusters (105 SITs) 3- Combination SAT/Cluster (12 SITs) 13 MITs 56 SATs (+ 3 combo SATs (59 Total)

17 Power Centers

JM TOWER

General Instruction Building

CAMERA

FC-5 CAMERA

FC-6

CAMERA

FC-7

PJ1A

PJ1B

PJ2B

PJ2A

PJ3A

PJ4A

PJ5A

PJ6A

PJ7A

PJ8A

PJ9A

PJ8B

PJ7BPJ6B

PJ5B

PJ4B

PJ3B

LOA

EXHIBIT L

2088 End to End fiber optic strands to be tested before and after construction.

Replacing all target load center and data patch panels.

Repair damaged fiber and power infrastructure.