BASE YR.

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-B-6702
Line Item 0001 Base Year Period - Non-Recurring Quantity Work
PROVIDE UNIT PRICES FOR NON-RECURRING QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINS A700-A713
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

A700Annual Inspection, Maintenance and Certification Test of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test for Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.28EA$0.00
A701Five Year Certification Test for 10,000 Gallon RailcarsWhen ordered the Contractor shall provide five-year inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Five Year Certification Test for 10,000 Gallon Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.9EA$0.00
A702Annual Inspection and Certification Test for 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection and Certification Test for 5,000 Gallon Tanker Trailers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.1EA$0.00
A703Annual Inspection, Maintenance and Certification Test of 1,000 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 1,000 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.12EA$0.00
A704Annual Inspection, Maintenance and Certification Test of 600 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.17EA$0.00
A705Annual Inspection, Maintenance and Certification Test for 600 Gallon (RMBC) Poly ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon poly (RMBC) containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 600 Gallon (RMBC) Poly Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.21EA$0.00
A706Leak Testing of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide leak testing services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.5EA$0.00
A707Leak Testing of 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide leak testing services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within seven work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.3EA$0.00
A708Provide Cleaning Services for Portable Metal and Poly Containers (600-1000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned portable metal and poly containers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.20EA$0.00
A709Provide Cleaning Services for Cargo Trailers (3,000-5,000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned 3,000 - 5,000 gallon cargo trailers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.8EA$0.00
A710Provide Cleaning Services for 10,000 Gallon RailcarWhen ordered the Contractor shall provide cleaning services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.10EA$0.00
A711Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
A712Composite Hour Labor Rate - Subject to the Davis Bacon Act (DBA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
A713Materials and Equipment MUST BE NEGOTIATED BY KO USING ETO PROCESS.All materials and equipment costs required to perform work requested by the Government not identified in the NON-RECURRING ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.
Completion time will be established per task order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.1NTE$0.00
TOTAL NON-RECURRING LINE ITEMS - A700 THROUGH A713$0.00

1ST OPTION YR.

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-B-6702
Line Item 0001 1st Option Period - Non-Recurring Quantity Work
PROVIDE UNIT PRICES FOR NON-RECURRING QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINS B700-B713
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B700Annual Inspection, Maintenance and Certification Test of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test for Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.28EA$0.00
B701Five Year Certification Test for 10,000 Gallon RailcarsWhen ordered the Contractor shall provide five-year inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Five Year Certification Test for 10,000 Gallon Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.9EA$0.00
B702Annual Inspection and Certification Test for 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection and Certification Test for 5,000 Gallon Tanker Trailers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.1EA$0.00
B703Annual Inspection, Maintenance and Certification Test of 1,000 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 1,000 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.12EA$0.00
B704Annual Inspection, Maintenance and Certification Test of 600 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.17EA$0.00
B705Annual Inspection, Maintenance and Certification Test for 600 Gallon (RMBC) Poly ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon poly (RMBC) containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 600 Gallon (RMBC) Poly Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.21EA$0.00
B706Leak Testing of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide leak testing services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.5EA$0.00
B707Leak Testing of 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide leak testing services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within seven work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.3EA$0.00
B708Provide Cleaning Services for Portable Metal and Poly Containers (600-1000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned portable metal and poly containers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.20EA$0.00
B709Provide Cleaning Services for Cargo Trailers (3,000-5,000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned 3,000 - 5,000 gallon cargo trailers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.8EA$0.00
B710Provide Cleaning Services for 10,000 Gallon RailcarWhen ordered the Contractor shall provide cleaning services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.10EA$0.00
B711Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
B712Composite Hour Labor Rate - Subject to the Davis Bacon Act (DBA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
B713Materials and Equipment MUST BE NEGOTIATED BY KO USING ETO PROCESS.All materials and equipment costs required to perform work requested by the Government not identified in the NON-RECURRING ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.
Completion time will be established per task order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.1NTE$0.00
TOTAL NON-RECURRING LINE ITEMS - B700 THROUGH B713$0.00

2ND OPTION YR.

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-B-6702
Line Item 0001 2nd Option Period - Non-Recurring Quantity Work
PROVIDE UNIT PRICES FOR NON-RECURRING QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINS C700-C713
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

C700Annual Inspection, Maintenance and Certification Test of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test for Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.28EA$0.00
C701Five Year Certification Test for 10,000 Gallon RailcarsWhen ordered the Contractor shall provide five-year inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Five Year Certification Test for 10,000 Gallon Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.9EA$0.00
C702Annual Inspection and Certification Test for 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection and Certification Test for 5,000 Gallon Tanker Trailers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.1EA$0.00
C703Annual Inspection, Maintenance and Certification Test of 1,000 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 1,000 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.12EA$0.00
C704Annual Inspection, Maintenance and Certification Test of 600 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.17EA$0.00
C705Annual Inspection, Maintenance and Certification Test for 600 Gallon (RMBC) Poly ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon poly (RMBC) containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 600 Gallon (RMBC) Poly Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.21EA$0.00
C706Leak Testing of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide leak testing services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.5EA$0.00
C707Leak Testing of 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide leak testing services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within seven work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.3EA$0.00
C708Provide Cleaning Services for Portable Metal and Poly Containers (600-1000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned portable metal and poly containers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.20EA$0.00
C709Provide Cleaning Services for Cargo Trailers (3,000-5,000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned 3,000 - 5,000 gallon cargo trailers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.8EA$0.00
C710Provide Cleaning Services for 10,000 Gallon RailcarWhen ordered the Contractor shall provide cleaning services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.10EA$0.00
C711Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
C712Composite Hour Labor Rate - Subject to the Davis Bacon Act (DBA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
C713Materials and Equipment MUST BE NEGOTIATED BY KO USING ETO PROCESS.All materials and equipment costs required to perform work requested by the Government not identified in the NON-RECURRING ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.
Completion time will be established per task order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.1NTE$0.00
TOTAL NON-RECURRING LINE ITEMS - C700 THROUGH C713$0.00

3RD OPT. YR.

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-B-6702
Line Item 0001 3RD Option Period - Non-Recurring Quantity Work
PROVIDE UNIT PRICES FOR NON-RECURRING QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINS D700-D714
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D700Annual Inspection, Maintenance and Certification Test of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test for Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.28EA$0.00
D701Five Year Certification Test for 10,000 Gallon RailcarsWhen ordered the Contractor shall provide five-year inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Five Year Certification Test for 10,000 Gallon Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.9EA$0.00
D702Annual Inspection and Certification Test for 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection and Certification Test for 5,000 Gallon Tanker Trailers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.1EA$0.00
D703Annual Inspection, Maintenance and Certification Test of 1,000 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 1,000 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.12EA$0.00
D704Annual Inspection, Maintenance and Certification Test of 600 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.17EA$0.00
D705Annual Inspection, Maintenance and Certification Test for 600 Gallon (RMBC) Poly ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon poly (RMBC) containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 600 Gallon (RMBC) Poly Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.21EA$0.00
D706Leak Testing of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide leak testing services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.5EA$0.00
D707Leak Testing of 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide leak testing services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within seven work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.3EA$0.00
D708Provide Cleaning Services for Portable Metal and Poly Containers (600-1000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned portable metal and poly containers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.20EA$0.00
D709Provide Cleaning Services for Cargo Trailers (3,000-5,000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned 3,000 - 5,000 gallon cargo trailers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.8EA$0.00
D710Provide Cleaning Services for 10,000 Gallon RailcarWhen ordered the Contractor shall provide cleaning services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.10EA$0.00
D711Triennial Inspections (Every 3 years)When ordered the Contractor shall provide a triennial (36 months) inspection of the railcar to determine its readiness for operation and the need for essential repairs must be performed and include the annual items plus the following additional items: Brake beams and brake beam hangers.

Draft yokes.

Brake rods, levers, and linkages.

Truck bolster.

Draft gear and followers.

Cross bearers and cross ties. 3-7 Axles.

Underfloor stringers.

Side bearings.

Center bearings – Lift car, inspect, and lubricate.

Axle bearings. Plain journal – Remove bearings and inspect for pitting, grooving, scoring, or excessive wear. Inspect bearing wedge. Replace journal box rear seal and lid seal. Renew journal box oil and bearing lubricator pad.

Axle bearings, Roller – Inspect for signs of lubricant loss or overheating. Tighten end cap screws. Inspect bearing adapters for excessive wear.

In addition, refer to SW020-AK-SAF-010 for prescribed maintenance associated with railcars that transport A&E and Other Hazardous Materials.

28EA$0.00
D712Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
D713Composite Hour Labor Rate - Subject to the Davis Bacon Act (DBA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
D714Materials and Equipment MUST BE NEGOTIATED BY KO USING ETO PROCESS.All materials and equipment costs required to perform work requested by the Government not identified in the NON-RECURRING ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.
Completion time will be established per task order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.1NTE$0.00
TOTAL NON-RECURRING LINE ITEMS - D700 THROUGH D714$0.00

4TH OPTION YR.

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-B-6702
Line Item 0001 4TH Option Period - Non-Recurring Quantity Work
PROVIDE UNIT PRICES FOR NON-RECURRING QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINS E700-E713
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

E700Annual Inspection, Maintenance and Certification Test of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test for Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.28EA$0.00
E701Five Year Certification Test for 10,000 Gallon RailcarsWhen ordered the Contractor shall provide five-year inspection, maintenance and certification services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Five Year Certification Test for 10,000 Gallon Railcars checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.9EA$0.00
E702Annual Inspection and Certification Test for 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection and Certification Test for 5,000 Gallon Tanker Trailers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.1EA$0.00
E703Annual Inspection, Maintenance and Certification Test of 1,000 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 1,000 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.12EA$0.00
E704Annual Inspection, Maintenance and Certification Test of 600 Gallon Metal ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon metal containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 1,000 Gallon and 600 Gallon Metal Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.17EA$0.00
E705Annual Inspection, Maintenance and Certification Test for 600 Gallon (RMBC) Poly ContainersWhen ordered the Contractor shall provide annual inspection, maintenance and certification services for Government owned 600 gallon poly (RMBC) containers in accordance with Attachment J-1700000-02. The Contractor shall complete the Annual Inspection, Maintenance and Certification Test of 600 Gallon (RMBC) Poly Containers checklist form and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.21EA$0.00
E706Leak Testing of 10,000 Gallon RailcarsWhen ordered the Contractor shall provide leak testing services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within two work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.5EA$0.00
E707Leak Testing of 5,000 Gallon Tanker TrailersWhen ordered the Contractor shall provide leak testing services for Government owned 5,000 gallon tanker trailers in accordance with Attachment J-1700000-02. The Contractor shall complete the Inspection Form for Leak Testing Bulk Containers checklist and forward to Code 106.3 within seven work days upon completion of work. The Contractor shall complete the work within seven work days after notice to proceed.3EA$0.00
E708Provide Cleaning Services for Portable Metal and Poly Containers (600-1000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned portable metal and poly containers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.20EA$0.00
E709Provide Cleaning Services for Cargo Trailers (3,000-5,000 Gallon Capacity)When ordered the Contractor shall provide cleaning services for Government owned 3,000 - 5,000 gallon cargo trailers in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.8EA$0.00
E710Provide Cleaning Services for 10,000 Gallon RailcarWhen ordered the Contractor shall provide cleaning services for Government owned 10,000 gallon railcars in accordance with Attachment J-1700000-02. Cleaning shall consist of high pressure hydro-blasting of walls, scrapping, vacuuming of residual material, and rinsate. All waste generated as a result of cleaning work (including rinsate) will be disposed by the Government under this work. Rinsate used will be at least the minimum required to perform sufficient cleaning of containers. The Contractor shall complete the work within thirty calendar days after notice to proceed.10EA$0.00
E711Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
E712Composite Hour Labor Rate - Subject to the Davis Bacon Act (DBA) MUST BE NEGOTIATED BY KO USING ETO PROCESS.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain falls, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO USING ETO PROCESS.500HR$0.00
E713Materials and Equipment MUST BE NEGOTIATED BY KO USING ETO PROCESS.All materials and equipment costs required to perform work requested by the Government not identified in the NON-RECURRING ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.
Completion time will be established per task order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.1NTE$0.00
TOTAL NON-RECURRING LINE ITEMS - E700 THROUGH E713$0.00