Deliverables Summary

This document is Exhibit L of a Request for Proposals (RFP No. HHS0017117) issued by the Texas Health and Human Services Commission (HHSC) for Eligibility Support Services. The deliverables outlined span multiple operational categories including staffing plans, language access plans, inquiry call handling procedures, monthly operations reporting, self-service portal assistance tracking, medical renewals reporting, business process documentation, complaint and dispute handling procedures, training materials and curricula, organizational charts, transition phase work plans, readiness assessments, business operations plans, security and facility management plans, disaster recovery and business continuity planning, quality management reporting, knowledge transfer plans, and financial documentation. Deliverables are categorized by frequency of submission, ranging from one-time submissions to weekly, monthly, quarterly, semi-annual, and annual requirements. Due dates vary from immediate notification (for critical security vulnerabilities and major system outages) to extended timelines of up to ninety calendar days following the contract effective date. Key initial submissions include the Staffing Plan and Language Access Plan within thirty-five days, the Comprehensive Plan for Inquiry Call Handling within sixty days, and the Transition Phase Work Plan within forty-five days of contract commencement.

The deliverables structure reflects ongoing operational management and oversight requirements throughout the contract lifecycle, with recurring reports addressing operational metrics, personnel changes, security incidents, financial transactions, and quality assurance. Monthly submissions include operations counts, complaint reports, breach reports, status reports, and financial invoices. Quarterly submissions encompass training delivery completion reports, quality management reports, and laptop inventory logs. Semi-annual deliverables include multi-layer logging records and business operations plan evaluations. Annually required documents include call volume reports, updated organizational charts, communication and coordination plans, and contract monitoring questionnaires. The framework establishes clear accountability mechanisms through timely notification requirements for personnel changes, security vulnerabilities ranging from critical to zero-day threats, facility issues, and system outages, with reporting timeframes ranging from five minutes to thirty days depending on severity and incident type.

View the file

Other files

File Type Posted
Exhibit M, Certification Regarding Lobbying.pdf PDF
Exhibit Q, Subcontracting Plan.pdf PDF
Exhibit J, Evaluation Tool.pdf PDF
Exhibit C, Additional Provisions v1.0.pdf.pdf PDF
Official Correspondence Volume 2023.xlsx XLSX spreadsheet
Exhibit F, Cost Proposal.xlsx XLSX spreadsheet
Annual Incidents Follow Ups Numbers.xlsx XLSX spreadsheet
Athens Floor Plan.pdf PDF
Quantities - Historical Contract Year 2024 and 2023.xlsx XLSX spreadsheet
Exhibit B, Health and Human Services (HHS) Uniform Terms and Conditions (UTC) - Vendor Version 3.4.pdf PDF
ESBD_564512_1794352902211_RFP HHS0017117_Eligibility Support Services.pdf PDF
Edinburg Floor Plan.pdf PDF
Exhibit G, Exceptions Form.docx DOCX document
Complaint Volumes.xlsx XLSX spreadsheet
HHSC 2024 Laptop and Headset Inventory .xlsx XLSX spreadsheet
Exhibit A, Health and Human Services (HHS) Solicitation Affirmations, Version 2.10.pdf PDF
Exhibit E, Scope of Work (SOW).pdf PDF
HHSC Asset Management Guide.pdf PDF
TIERS Print Job Inventory.xlsx XLSX spreadsheet
Exhibit T, Oral Presentation Consensus Scoring Rubric.pdf PDF
Outbound Quantities by Letter Type.xlsx XLSX spreadsheet
Exhibit S, HHSC Security Control Standards Catalog.xlsx XLSX spreadsheet
San Antonio Floor Plan.pdf PDF
Call Center Software Application Support Functions.xlsx XLSX spreadsheet
HHSC SMS Email Mapping 05092024 - APPENDIX G v 1.7.xlsx XLSX spreadsheet
Exhibit I, Online Bid Room Information, v 1.40.pdf PDF
Exhibit O, Federal Funding Accountability and Transparency Act (FFATA) Certification.pdf PDF
Exhibit K, Key Performance Requirements.pdf PDF
Exhibit P, Insurance Requirements.pdf PDF
Exhibit R, Breach Disclosure History.pdf PDF
Exhibit D-1, Attachment 2 to the DUA, Secuirity and Privacy (SPI), Version 2.1.pdf PDF
Exhibit N, Assurances Non-Construction Programs.pdf PDF
Exhibit D, Health and Human Services (HHS) Data Use Agreement (DUA) Version 8.5.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. HHS0017117 Exhibit L

Stephanie Muth, Executive Commissioner

Request for Proposals (RFP) for

Eligibility Support Services RFP No. HHS0017117

Exhibit L, Deliverables

Deliverable ID KPR No. Requirements Due Date Frequency

ESS 004-D

Staffing Plan

NA

The Contractor shall submit a Staffing Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.4, Staffing and Call Center Requirements.

Within thirty-five

(35) calendar days after Contract Effective Date or by the date specified by HHSC

One-time

As Requested

ESS 005-D

Language Access Plan

N/A

The Contractor shall submit a Language Access Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.4, Staffing and Call Center Requirements.

Within thirty-five

(35) calendar days after Contract Effective Date or by the date specified by

HHSC

ESS 010-D

Comprehensive Plan for Inquiry Call Handling

The Contractor shall submit a comprehensive plan for inquiry call handling methods and procedures.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5, Inquiry Management Requirements.

Within sixty (60) calendar days after Contract Effective

Date, annually thereafter within sixty (60) calendar days prior to the end of each State Fiscal Year or by the date specified by HHSC

Annually

ESS 011-D

ES Operations

Monthly Count

The Contractor shall submit an ES Operations Monthly Count report to include the previous month’s data with total volume (counts) for the following:

a. Fax channel

b. Redetermination transactions

c. Applications and Redeterminations by

Region, County, and Zip Code.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5, Inquiry Management Requirements.

By the fifth (5th) calendar day of the month

Monthly

ESS 012-D

Annual Call Volume

Report

The Contractor shall submit an annual call volume report which contains aggregated date of calls per day for the months of April, May, and June.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5, Inquiry Management Requirements.

Eighth (8th) calendar day following the listed calendar quarter

ESS 013-D

Self-Service Portal

Assistance Call Reasons

The Contractor shall submit the Self-Service Portal (SSP) report with a breakdown of SSP assistance call for the previous month for numbers of calls handled in the following categories:

a. SSP Case Visibility

b. SSP Navigation Assistance

c. SSP Password Reset Assistance

d. Help Desk Ticket

e. Mobile Application Assistance

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5, Inquiry Management Requirements.

By the fifth (5th) calendar day of the month to include the previous month data

Monthly

ESS 014-D

Medical

Renewals Call Center

The Contractor shall submit a weekly Medical Renewals Call Center report that provides the number of calls received related to completing the renewal process and the number requesting a Renewal Packet be mailed by Type of Assistance (TOA).

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5, Inquiry Management Requirements.

By the second (2nd) calendar day following the end of the previous week

Weekly

ESS 019-D

Business Process

The Contractor shall submit a Business Process Deliverable.

Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing.

Within thirty (30) calendar days after Contract Effective

Date, annually within thirty (30) calendar days prior to the end of each operational year of the Contract or by the date specified by

HHSC

As

Requested

ESS 030-D

Complaint and Dispute Handling

Plan

The Contractor shall submit a Complaint and Dispute Handling Plan.

Scope of Work (SOW), Section 2.1.9, Complaint and Dispute Handling Requirements.

Within thirty (30) calendar days prior to the operational start date, or by the date specified by

HHSC, and within thirty (30) calendar days prior to the end of each operational year of the Contract

One-Time

ESS 031-D

Complaint and Dispute

The Contractor shall submit a Monthly Complaint and Dispute Report, to include resolutions.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.9, Complaint and Dispute Handling Requirements.

Within fifteen (15) calendar days following the reporting month or the date specified by

ESS 037-D

Multi-layer Logging Records

The Contractor shall maintain and submit the active multi-layer logging records within thirty (30) calendar days after the end of the six (6)- month reporting period covered by the report.

Scope of Work (SOW), Section 2.1.12, Technology and Technical Operations.

Within thirty (30) calendar days after the end of the six (6)-month reporting period covered by the report.

Semi-annually

ESS 038-D

Training

The Contractor shall submit a Training Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 3.1.2, Training Plan.

Within ninety (90) calendar day after Contract Effective Date or by the date

ESS 039-D

Curricula, Materials, and Tools

The Contractor shall submit curricula, training materials, and tools prior to initial training delivery dates for review and approval. HHSC reserves the right to request training material and tools at its discretion.

Scope of Work (SOW), Section 3.1.3, Curriculum Development.

Within thirty (30) calendar days prior to initial training delivery dates

Required

ESS 045-D

Quarterly

Delivery

Completion and Status

The Contractor shall submit a quarterly Training Delivery Completion and Status Report which includes the following Training Deliverable and QA Reports specified below: a Training Delivery Completion Report which includes, but is not limited to, classes delivered, number of pass/fail participants by class, class name, delivery dates, trainer name, type of training, remediation plan and follow up plan on subsequent reports; a Training Calendar of all classes scheduled including, but not limited to, class title, class size, course dates, audience, and type of training for the upcoming two (2)-months with an explanation for any changes on the prior submissions; and a quarterly QA trend analysis report from both the Contractor and HHSC QA findings; training analysis based on evaluations, assessments and HHSC audits.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 3.1.10, Accessibility and Diversity.

By the tenth (10th) calendar day of each

ESS 051-D

Key

Personnel Timely

Notification

The Contractor shall submit notification to HHSC in writing that a Key Personnel vacancy will occur for any reason or prior to making any changes in Key Personnel other than changes due to unforeseen resignation, death, or military recall.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 4.1, Key Personnel and Organizational Requirements.

No more than fourteen (14) calendar days prior to the change occurring

ESS 054-D

Key

Personnel Resumes and References

The Contractor shall submit resumes and references of proposed replacement of Key Personnel for HHSC’s review prior to making a job offer.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 4.1, Key Personnel and Organizational Requirements.

No later than seven

(7) calendar days from notification of a resignation or request for removal.

ESS 055-D

Initial

Organizational Chart

The Contractor shall submit an initial organizational chart that includes the names and positions of all personnel assigned to this Contract. The organizational chart must designate who are Key Personnel.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 4.1, Key Personnel and Organizational Requirements.

Within thirty (30) calendar days after operational start date

ESS 056-D

Updated

Organizational Chart

The Contractor shall submit an updated organizational chart after a change in Key Personnel and following the calendar quarter effected identifying the names and positions of all personnel assigned to this Contract. The organizational chart must designate who are Key Personnel. The quarter is based on the yearly period beginning on the original due date of the initial Organizational Chart.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 4.1, Key Personnel and Organizational Requirements.

Within thirty (30) calendar days after a change in Key Personnel is made and within ten (10) calendar days after the end of the

ESS 057-D

Notification of Key

Personnel Being

Redirected

The Contractor shall submit notification to HHSC in writing whenever Key Personnel are temporarily redirected to perform functions other than the responsibilities of their current position. Notification must include length of temporary assignment and percentage of time staff member will be performing work functions attributable to non-ESS contract.

Scope of Work (SOW), Section 4.1, Key Personnel and Organizational Requirements.

Within ten (10) calendar days

ESS 059-D

Breaches

The Contractor shall submit a monthly Breaches report of unauthorized access, use or disclosure incidents of HHSC's confidential information for incidents and the resulting actions taken on the reported incidents.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 4.1, Key Personnel and Organizational Requirements.

By the tenth (10th) calendar day following the last day covered by the report

ESS 061-D

Transition

Phase Work

The Contractor shall submit a Transition Phase Work Plan for approval.

Scope of Work (SOW), 5.1.4, Transition Phase Work Plan.

Within forty-five

(45) calendar days after Contract Effective Date

ESS 064-D

Phase Status

The Contractor shall submit a weekly Transition Phase Status Report.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 5.1.4, Transition Phase Work Plan.

By 5:00 p.m. Central Time on the Monday following the last day of the week covered by the

ESS 067-D

Facility and Business Structure

The Contractor shall submit a Facility and Business Structure Transition Plan.

Scope of Work (SOW), Section 5.1.5, Facility and Business Structure Transition Plan.

Within sixty (60) calendar day after Contract Effective Date or by the date specified by HHSC

ESS 069-D

Risk Management

The Contractor shall submit a Risk Management Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 6.1, Risk Management Plan.

Within thirty (30) calendar days after Contract Effective Date or by the date

ESS 077-D

Readiness Assessment

The Contractor shall submit a Readiness Assessment Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 7.1, Readiness Assessment Process.

Within forty-five

(45) calendar days after Contract Effective Date or by the date specified by

ESS 085-D

Readiness Assessment

The Contractor shall submit the results of the Readiness Assessment in a Readiness Assessment Report.

Scope of Work (SOW), Section 7.1, Readiness Assessment Process.

Within fifteen (15) calendar days after the readiness assessment process has been completed

ESS 088-D

Initial

Business Operations

The Contractor shall submit an initial Business Operations Plan.

Scope of Work (SOW), Section 8.1.2, Business Operations Plan.

Within thirty (30) calendar days prior to the scheduled operational start date or by the date specified by HHSC

ESS 090-D

Six (6)-month evaluation report of the

Business

The Contractor shall submit a detailed six (6)-month evaluation report of the Business Operations Plan which includes metrics that address the level of improvement or otherwise as a result of said change(s). This six (6)-month evaluation report of the Business Operations Plan is a separate report from the Monthly Status Report required in ESS 092-D.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 8.1.2, Business Operations Plan.

Within thirty (30) calendar days after the end of the six (6)-month reporting period covered by the report. .

Semi-annually

ESS 091-D

Mid- Month Performance

Snapshot

The Contractor shall submit a Monthly Mid-Month Performance Snapshot Report

Scope of Work (SOW), Section 8.1.3, Operations Phase Reporting

By the preceding Friday before the monthly Governance meeting

ESS 092-D

Status Report

The Contractor shall submit a Monthly Status Report.

HHSC will inform the Contractor when the monthly status report submission period begins.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 8.1.3, Operations Phase Reporting

Within ten (10) calendar days following the last day covered by the

ESS 096-D

Configuration

The Contractor shall submit a Configuration Management Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 9.1, Operational Phase Requirements.

Within thirty (30) calendar days after Contract Effective Date or by the date

ESS 102-D

Report of Facility Issues

The Contractor shall submit a Report of Facility Issues that impact staffs working in or operations of the facility detailing the issue, when and how it was discovered, operational impacts, and corrective measures to detect and prevent future occurrences.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 10.1, Facility Acquisition, Management and Operation.

Within one (1) calendar day of discovery

ESS 103-D

Facilities

Site Seating and

Headcount

The Contractor shall submit a facilities site seating and headcount report including a site survey of all locations of seats managed, occupied, and empty with associated inventory of all HHSC equipment (laptops, monitors, etc.).

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 10.1, Facility Acquisition, Management and Operation.

By the fifteenth (15th) calendar day each month

ESS 104-D

Laptop

Inventory

The Contractor shall submit a weekly laptop inventory report by the third (3rd) calendar day following the end of the previous calendar week.

Scope of Work (SOW), Section 10.1.1, Asset Management.

By the third (3rd) calendar day following the end of the previous calendar week

No. Requirements Due Date

Frequency

ESS 105-D

Quarterly Laptop Inventory

Log

The Contractor shall maintain and submit a quarterly laptop inventory log in a form acceptable to HHSC within fifteen (15) calendar days following the end of the reviewing quarter (See Exhibit L, Deliverables

ESS 104-D).

Scope of Work (SOW), Section 10.1.1, Asset Management.

Within fifteen (15) calendar days following the ed of the reviewing quarter

ESS 106-D

Security Monitoring Plan

The Contractor shall submit a Security Monitoring Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 11.1, Security Management.

Within sixty (60) calendar days after Contract Effective Date or by the date

ESS 109-D

Security Vulnerabilities

The Contractor shall remediate identified security vulnerabilities in accordance with remediation timeframes, based on severity classification, and is required upon discovery or notification, including mitigation, containment, or remediation actions to reduce risk until a permanent fix is implemented.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 11.1, Security Management.

Critical Vulnerabilities within fourteen (14) calendar days;

High Vulnerabilities within thirty (30) calendar days; and

Zero Day Vulnerabilities immediately

ESS 110-D

Unauthorized Access of Confidential Information

The Contractor shall submit a monthly report of unauthorized access, use or disclosure incidents of HHSC's confidential information for incidents and the resulting actions taken on the reported incidents.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 11.1, Security Management.

No later than thirty

(30) calendar days from the last month reported

ESS 111-D

Report of Security System Issues

The Contractor shall submit a report of security systems issues.

Scope of Work (SOW), Section 11.1, Security Management.

Within one (1) calendar day of discovery

ESS 112 -D

Facility Emergency Action Plan

The Contractor shall submit a facility emergency action plan.

Scope of Work (SOW), Section 11.1, Security Management.

Within sixty (60) calendar days after Contract Effective Date or by the date

ESS 113-D

Data Breach Disclosure

The Contractor shall notify HHSC in writing within five

(5) business days of any breach and/or changes to prior breach disclosure. The breach disclosure and all supporting documentation must be included in accordance with Exhibit R, Breach Disclosure.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 11.1.2 Breach and Security Incident Disclosure Requirements

Within five (5) business days of any breach and/or changes to prior breach disclosure

Needed

ESS 114-D

Disaster Recovery and Business Continuity

19 & 20

The Contractor shall submit a Disaster Recovery and Business Continuity Plan specific to the transition and on-going operations.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 12.1, Disaster Recovery and Business Continuity.

Within forty-five

(45) calendar days after Contract Effective Date, by the date specified by HHSC and within thirty (30) calendar days prior to the end of the operational year of the Contract.

ESS 117-D

Major

Outages

All Major System Outages must be reported to HHSC in writing via e-mail or telephone if e-mail is unavailable after the Contractor determines a Major System Outage has occurred.

Scope of Work (SOW), Section 12.1, Disaster Recovery and Business Continuity.

Within five (5) minutes

ESS 118-D

Major

Outages

The Contractor shall submit an Incident Report in writing to HHSC via the official correspondence process detailing the incident.

Scope of Work (SOW), Section 12.1 Disaster Recovery and Business Continuity.

Within twenty-four

(24) hours of reported system outages

ESS 119-D

Quality

The Contractor shall submit an initial Quality Management Plan, in a form acceptable to HHSC.

Scope of Work (SOW), Section 13.1.2, Quality Management Plan.

Within forty-five

(45) calendars days after Contract Effective Date and within forty-five

(45) calendar days prior to the end of each operational year of the Contract

ESS 120-D

Quality

The Contractor shall submit a quarterly Quality Management Report.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 13.1.2, Quality Management Plan.

Within fifteen (15) calendar days following the end of the reviewing quarter

ESS 121-D

Data Access

If a Contractor Proposes their own quality assurance system, then the Contractor shall submit a Data Access Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 13.1.2, Quality Management Plan.

Within twenty-five

(25) calendar days prior to the operational start date

ESS 139-D

Communication and

Coordination

The Contractor must submit a Communication and Coordination Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 21.1.4, Communication and Coordination Requirements.

Within thirty (30) calendar day after Contract Effective Date, or by the date specified by HHSC, and twelve (12) months following HHSC approval of the initial plan

ESS 140-D

Contract Monitoring Questionnaire

The Contractor shall submit an initial Contract Monitoring Questionnaire (“CMQ”).

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 21.1.5, Contract Monitoring Questionnaire (CMQ).

Within thirty (30) days after Contract Effective Date and annually, twelve

(12) months following HHSC approval of the initial plan

ESS 141-D

Operations Turnover

The Operations Turnover Report shall also include a Facilities and Business Structure Turnover Plan within sixty (60) calendar days after the Transition Phase is complete.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 22.1.3, Turnover Plan.

Within sixty (60) calendar days after the Transition Phase is complete or date

ESS 142-D

Annual

Turnover

The Contractor shall submit an Annual Operations Turnover Plan and an Annual Facilities Plan and a “ready to execute” Turnover Plan.

Scope of Work (SOW), Section 22.1.3, Turnover Plan.

Within sixty (60) calendar days prior to the end of each operational year and six (6) months prior to the end of the Contract or upon request by HHSC.

ESS 148-D

Knowledge

Transfer

The Contractor shall submit a comprehensive Knowledge Transfer Plan.

Scope of Work (SOW), Section 22.1.3, Turnover Plan.

Within sixty (60) calendar days prior to the end of the

Contract

ESS

151-D

Facilities and Business Structure and Turnover

The Contractor shall submit a Facilities and Business Structure Turnover Plan.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in in RFP, Exhibit E, Scope of Work (SOW), Section 22.1.4, Facilities and Business Structure Turnover Plan.

Within sixty (60) calendar days after the Transition Phase is complete

ESS

153-D

Annual Facilities and Business Structure

The Contractor shall submit an Annual Facilities and Business Structure Turnover Plan and a “ready to execute” Turnover Plan.

satisfies all requirements outlined in in RFP, Exhibit E, Scope of Work (SOW), Section 22.1.4, Facilities and Business Structure Turnover Plan.

Within sixty (60) calendar days prior to the end of each operational year of the Contract and six

(6) months prior to the end of the Contract or upon request by HHSC

One-Time

ESS 154-D

Results

The Contractor shall submit a Turnover Results Report.

Scope of Work (SOW), Section 22.1.5, Turnover Results.

Within forty-five

(45) calendar days after the completion of turnover activities or by the date

ESS 161-D

Accounting Policy Manual

The Contractor shall submit any modifications to the Accounting Policy Manual.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 23.1.4, Business Objective.

No later than twenty

(20) calendar days before the proposed changes are implemented

ESS 164-D

Accounting Records and Supportive

Documentation

The Contractor shall submit accounting records or supporting documentation relevant to the resulting Contract available to HHSC or its agents.

Scope of Work (SOW), Section 23.1.5, General Access to Accounting Records.

Within ten (10) calendar days of receipt of written request from HHSC for specified records and information

ESS 168-D

Related Parties Listing

The Contractor shall provide to HHSC a related parties listing, including those with minority interest.

Any updates/changes to the schedule should be provided to HHSC.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 23.1.5, General Access to Accounting Records.

Within thirty (30) calendar days after the Effective Date of the contract and within twenty (20) calendar days of change and as requested by HHSC

One-time As

Required

ESS 169-D

Financial Statement Invoice

The Contractor shall submit one (1) or more monthly invoice(s) in which the Contractor shall provide administrative services. Separate invoices for each service component type must be submitted by the Contractor to HHSC in the format specified by HHSC.

Each invoice will be processed and paid separately.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E Scope of Work (SOW), Section 24.1.2.3 Fixed Fees

No later than the fifth (5th) Business Day of the second (2nd) month following the month being reported

ESS 170-D

Nonexpendable Capital Items

List

The Contractor shall submit a list of all nonexpendable capital items acquired under the Contract no later than thirty (30) calendar days after the end of the transition period and within fifteen (15) calendar days after the end of each calendar year.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in RFP, Exhibit E Scope of Work (SOW), Section 25.2.1 Ownership and Management of Capital Items in an All- Inclusive Contract

No later than thirty

(30) calendar days after the end of the transition period

Within fifteen (15) calendar days after the end of each calendar year

Annual

ESS 171-D

VetHUB

Subcontracting Report

The Contractor shall submit the Progress Assessment Report (PAR) by the tenth (10th) calendar day of the month following the last day of the month for the preceding month except for the following:

The February and August PAR (submitted in March and September) are due to HHSC no later than close of business on the fifth (5th) calendar day of the month.

If the 5th calendar day falls on a weekend or holiday, the report is due the Friday before the fifth (5th) calendar day.

The Contractor shall provide a Deliverable that satisfies all requirements outlined in Exhibit Q, Subcontracting Plan.

By the tenth (10th) calendar day of the month

File details come from the government source that posted it. Updated .