Exhibit K, Key Performance Requirements.pdf
PDF 368 KB Posted
- Attached to
- Eligibility Support Services
- Solicitation number
- HHS0017117
- Issued by
- Hockley County, Arlington City, Texas
About this file
Exhibit K: Key Performance Requirements for Eligibility Support Services
This document is Addendum No. 3 to Request for Proposals (RFP) No. HHS0017117 for Eligibility Support Services (ESS) issued by the Texas Health and Human Services Commission (HHSC). The RFP seeks contractor services to provide comprehensive eligibility support operations including inquiry call handling, client call management, application support, image association, document processing, complaint handling, fraud referrals, fair hearings processing, and various reporting functions. The contract includes transition phases covering facility and business structure modifications, business operations setup, and disaster recovery planning. The contract term is not explicitly specified in this exhibit, though references indicate operational years with annual renewal or continuation provisions for turnover plans and disaster recovery plans submitted at specified intervals.
The document establishes 39 Key Performance Requirements (KPRs) with associated liquidated damages ranging from $250 to $1,500 per occurrence or per calendar/business day of non-compliance, depending on the specific requirement. Performance standards address timeliness metrics (ranging from same-day completion to 30-day processing windows), accuracy thresholds (typically 90-100%), call handling speed (610-second average speed of answer targets), and abandonment rates (not to exceed 10-15%). The contractor is required to submit numerous reports including monthly status reports, quarterly quality management reports, complaint and dispute reports, and disaster recovery plans. HHSC reserves discretionary authority to assess liquidated damages based on the formula: (a) measurement × (b) frequency × (c) base LD value. The file references Exhibit E (Scope of Work), Exhibit L (Deliverables), and other contract documents for detailed compliance requirements.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 3
RFP No. HHS0017117 Exhibit K, Key Performance Requirements
Stephanie Muth, Executive Commissioner
Request for Proposals (RFP) for
Eligibility Support Services
RFP No. HHS0017117
Exhibit K, Key Performance Requirements
Eligibility Support Services (ESS) RFP No. HHS0017117– Exhibit K - Key Performance Requirements
Page 1 of 38 Addendum No.3
HHSC may assess Liquidated Damages (LD) of up to $1,500 per calendar day for each instance of the Contractor’s breach of non-performance of a requirement that is not explicitly identified in the Key Performance Requirements.
ESS KPR 1
Reporting Period As Requested Service/Component Comprehensive Plan for Inquiry Call Handling Performance Standard The Contractor shall submit a comprehensive plan for inquiry call handling methods and procedures within sixty (60) calendar days after Contract Effective Date, annually thereafter within sixty (60) calendar days prior to the end of each State Fiscal Year or by the date specified by HHSC.
The Contractor shall comply with detailed requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5, Inquiry Management Requirements and Exhibit L, Deliverables, ESS 010-D.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages (“LD”) is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion
Therefore, the calculation would be as follows:
a = Each calendar day after due date until received b = 1 c = $1,000
Page 2 of 38 Addendum No.3
ESS KPR 2
Reporting Period Calendar Quarter Service/Component Inquiry Call Handling / Accuracy/Quality Assurance Performance Standard The Contractor shall ensure that 95% of Client call handling is accurate as determined in accordance with HHSC approved methodology, performance criteria in the Quality Management Plan.
The Contractor shall comply with detailed requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5, Inquiry Management Requirements and Exhibit E, Scope of Work (SOW), Section 13.1.2, Quality Management Plan.
Liquidated Damages Value
$1,500
Measurement of Noncompliance
Each percentage point below 95%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency a = Each percentage point below 95% c = $1,500
Page 3 of 38 Addendum No.3
ESS KPR 3
Reporting Period Monthly Service/Component Client Call Handling Performance Standard
The Contractor shall ensure that the Average Speed of Answer for each English and Spanish queue does not exceed 610 seconds.
The Contractor shall comply with detailed requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.5 Inquiry Management Requirements.
Liquidated Damages Value
$1,000
Measurement of Noncompliance
Each minute above 610 seconds
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion
Therefore, the calculation would be as follows:
a = Each minute above 610 seconds
Page 4 of 38 Addendum No.3
ESS KPR 4
Service/Component Application Support Image Only Timeliness Performance Standard The Contractor shall associate application support image only tasks with the proper Client file 100% of all Image Only documents within three (3) calendar days of when the documents are received by the Contractor.
The Contractor shall comply with detailed requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.6 Image Association Requirements and Section 24.1.3. Determination of Variable Fees.
Liquidated Damages Value
$750
Measurement of Noncompliance
Each percentage point below 100%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency a = Each percentage point below 100% c = $750
Page 5 of 38 Addendum No.3
ESS KPR 5
Service/Component Unidentified Images Performance Standard The Contractor must process 100% of all previously unidentified images for image assembly that are available for association with a case file within thirty (30) calendar days of receipt by the Contractor.
The Contractor shall comply with detailed requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.6, Image Association Requirements
Liquidated Damages Value $250 Measurement of Noncompliance
Each percentage point below 100%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 100% c = $250
Page 6 of 38 Addendum No.3
ESS KPR 6
Service/Component Application Support Non-Expedite Timeliness Performance Standard The Contractor shall complete 90% of all Non-Expedited and other Non-Expedited document processing tasks by the next Business Day of receipt by the Contractor of the inbound documents.
Documents received by the Document Center System after 5:00 PM, on a weekend day, or on a Holiday will be considered received the following Business Day.
The Contractor shall comply with detailed requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing and Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value
$750
Measurement of Noncompliance
Each percentage below 90%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage below 90%
Page 7 of 38 Addendum No.3
ESS KPR 7
Service/Component Application Support Non-Expedite Timeliness Performance Standard
The Contractor shall complete 100% of all Non- Expedited and other Non- Expedited document processing tasks within two (2) Business Days following receipt by the Contractor of the inbound documents.
Documents received by the Document Center System after 5:00 PM Central Time, on a weekend, or on a Holiday will be considered received the following Business Day.
The Contractor shall comply with detailed requirements outlined in RFP, Exhibit E, Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing and Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value
$750
Measurement of Noncompliance
Each percentage point below 100%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 100%
Page 8 of 38 Addendum No.3
ESS KPR 8
Service/Component Application Support Expedited Applications Timeliness Performance Standard The Contractor shall complete 100% of Expedited support tasks and related documents on the day the document is received by the Contractor.
Documents received by the Document Center System after 5:00 PM, on a weekend day, or on a Holiday will be considered received the following Business Day.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing and Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value
$500
Measurement of Noncompliance
Each percentage point below 100%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 100% c = $500
Page 9 of 38 Addendum No.3
ESS KPR 9
Service/Component Application Support Supporting Documents Timeliness Performance Standard The Contractor shall complete 98% of all supporting documents no later than the date the document is received by the Contractor.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing and Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value $500 Measurement of Noncompliance
Each percentage point below 98%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 98%
Page 10 of 38 Addendum No.3
ESS KPR 10
Service/Component Application Support Supporting Documents Timeliness Performance Standard The Contractor shall complete application support tasks for 100% of all supporting documents within one (1) Business Day the documents are received by the Contractor.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing and Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value
$500
Measurement of Noncompliance
Each percentage point below 100%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 100%
Page 11 of 38 Addendum No.3
ESS KPR 11
Reporting Period Calendar Quarter Service/Component Application Support - Tasks and Routing Accuracy/Quality
Assurance Performance Standard The Contractor must ensure that 95% of application support tasks and routing are accurate, as determined in accordance with HHSC approved methodology and performance criteria in the Quality Management Plan.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.7 Data Collection and Electronic Document Routing
Liquidated Damages Value $500 Measurement of Noncompliance
Each percentage point below 95%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 95%
Page 12 of 38 Addendum No.3
ESS KPR 12
Service/Component Special Handling Tasks Timeliness Performance Standard The Contractor shall properly route 95% of all special handling cases (e.g., DADS, adoption assistance, etc.) within two (2) calendar days of receipt by the Contractor.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing and Section 24.1.3 Determination of Variable Fees.
Liquidated Damages Value $750 Measurement of Noncompliance
Each percentage point below 95%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 95%
Page 13 of 38 Addendum No.3
ESS KPR 13
Service/Component Special Handling Tasks Timeliness Performance Standard The Contractor must route 100% of all special handling cases (i.e., DADS, adoption assistance, etc.) within three (3) Business Days of receipt by the Contractor.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.7, Data Collection and Electronic Document Routing and Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value $750 Measurement of Noncompliance
Each percentage point below 100%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 100%
Page 14 of 38 Addendum No.3
ESS KPR 14
Service/Component Complaint and Dispute Report Performance Standard The Contractor shall submit a monthly Complaint and Dispute
Report within fifteen (15) calendar days following the reporting month or the date specified by HHSC.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.9, Complaint and Dispute Handling Requirements, and Exhibit L, Deliverables, ESS 031-D.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each Business Day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each Business Day after due date
Page 15 of 38 Addendum No.3
ESS KPR 15
Service/Component Referrals Suspected Fraud, Abuse, or Waste Performance Standard The Contractor shall refer all cases of suspected Fraud, Abuse, or
Waste it identifies to HHSC within 24 hours after Contractor becomes aware of the suspected Fraud, Abuse, or Waste.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 3.1.3, Curriculum Development.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each occurrence that is not reported within twenty-four
(24) hours, excluding non-Business Days.
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each occurrence that is not reported within twenty-four
(24) hours
Page 16 of 38 Addendum No.3
ESS KPR 16
Service/Component Fair Hearings Performance Standard The Contractor shall correctly identify and route to HHSC 99% of all written requests for fair hearings received by the Contractor within one (1) Business Day of receipt.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), 2.1.7 Data Collection and Electronic Document Routing and Section 24.1.3 Determination of Variable Fees
Liquidated Damages Value $1,000 Measurement of Noncompliance
1) Each request not escalated within one (1) Business Day if the Contractor receives fewer than one hundred (100) written requests per month.
2) Each percentage point below 99% if Contractor receives greater than one hundred (100) written requests per month.
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 99%
Page 17 of 38 Addendum No.3
ESS KPR 17
Service/Component Fair Hearings Performance Standard The Contractor must correctly identify and route to HHSC 100% of all written requests for fair hearings within two (2) Business Days of receipt.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 24.1.3, Determination of Variable Fees and 2.1.7 Data Collection and Electronic Document Routing
Liquidated Damages Value $1,000 Measurement of Noncompliance
1) Each request not escalated within two (2) Business Days if Contractor receives fewer than one hundred (100) written requests per month.
2) Each percentage point below 100% if Contractor receives greater than one hundred (100) written requests per month.
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 100%
Page 18 of 38 Addendum No.3
ESS KPR 18
Service/Component Work Plan Due Dates Performance Standard The Contractor shall meet all due dates contained in all Work
Plans: Transitions, Facility and Business Structure, and Business Operations. Failure to meet due dates for any Work Plan will be assessed separately.
A Work Plan is a mutually agreed upon event that marks the completion of a significant work phase, including project completion or major Deliverable.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 2.1.7 Data Collection and Electronic Document Routing, Section 5.1.4, Transition Phase Work Plan, 5.1.5 Facility and Business Structure Transition Plan, and Section 8.1.2, Business Operations Plan.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each calendar day after each due date of the dates specified in the Work Plan
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after each due date of the dates specified in the Work Plan b =1
Page 19 of 38 Addendum No.3
ESS KPR 19
Reporting Period One Time Service/Component Disaster Recovery and Business Continuity Plan Performance Standard The Contractor shall prepare and submit an acceptable Disaster
Recovery and Business Continuity Plan within forty-five (45) calendar days after Contract Effective Date or by the date specified by
HHSC.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 12.1, Disaster Recovery and Business Continuity, and Exhibit L, Deliverables, ESS 114-D.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 20 of 38 Addendum No.3
ESS KPR 20
Reporting Period Annually Service/Component Annual Disaster Recovery and Business Continuity Plan Performance Standard The Contractor shall prepare and submit an acceptable Annual
Disaster Recovery and Business Continuity Plan within thirty (30) calendar days prior to the end of the operational year of the contract.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 12.1, Disaster Recovery and Business Continuity, and Exhibit L, Deliverables, ESS 114-D.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 21 of 38 Addendum No.3
ESS KPR 21
Service/Component Major System Outages Report Performance Standard The Contractor shall notify HHSC of all Major System Outages via e-mail or telephone if e-mail is unavailable within five (5) minutes after Vendor determines a Major System Outage has occurred. Submit an Incident Report to HHSC via the official correspondence process within twenty-four (24) hours of reported system outages detailing the incident, when and how it was discovered, system and operational impacts, and corrective measures to detect and prevent future incidents.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 12.1, Disaster Recovery and Business Continuity, and Exhibit L, Deliverables, ESS 117-D and
ESS 118-D.
Liquidated Damages Value $250 Measurement of Noncompliance
Each incident that is not reported within twenty-four (24) hours and/or each Major System Outage event
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each incident that is not reported within twenty-four (24) hours and/or each Major System Outage event
Page 22 of 38 Addendum No.3
ESS KPR 22
Service/Component Confidentiality Performance Standard The Contractor shall submit an initial report to HHSC for each occurrence (Event or Breach) of unauthorized destruction, loss, alteration, or unauthorized access to, use or disclosure of HHSC’s confidential information within the first, consecutive clock hour of discovery. The Contractor shall submit a formal notice no later than forty-eight (48) consecutive clock hours from discovery.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 3.1.3 Curriculum Development.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each occurrence that is not reported within the specified timeframes for each event of breach of confidentiality
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each occurrence that is not reported within the specified timeframes for each event of breach of confidentiality
Page 23 of 38 Addendum No.3
ESS KPR 23
Service/Component Key Personnel Timely Notification Performance Standard The Contractor must submit notification to HHSC in writing within fourteen (14) calendar days that a Key Personnel vacancy will occur for any reason or prior to making any changes in Key Personnel other than changes due to factors outside of the Contractor’s control (i.e., resignation, death, or military recall). Notification must include a plan to recruit Key Personnel.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 4.1, Key Personnel and Organizational Requirement, and Exhibit L, Deliverables, ESS 051-D.
Liquidated Damages Value $500 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 24 of 38 Addendum No.3
ESS KPR 24
Service/Component Monthly Status Report Performance Standard The Contractor shall submit an acceptable Monthly Status Report within ten (10) calendar days following the last day covered by the report. HHSC will inform the Contractor when the monthly status report submission period begins. The monthly status report must include the actual performance measures for all Key Performance Requirements (KPR).
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 8.1.3, Operations Phase Reporting, and Exhibit L, Deliverables, ESS 092-D.
Liquidated Damages Value $500 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 25 of 38 Addendum No.3
ESS KPR 25
Reporting Period Semiannually Service/Component Six-Month Evaluation Report of the Business Operations Plan Performance Standard The Contractor shall submit a detailed six-month evaluation report of the Business Operations Plan within thirty (30) calendar days after the end of the six-month reporting period covered by the report. The six-month evaluation report will be included in the June and December Status Reports, submitted in July and January respectively.
1. July submission six-month reporting period: January through June
2. January submission six-month report period: July through December
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 8.1.2, Business Operations Plan, and Exhibit L, Deliverables, ESS 090-D.
Liquidated Damages Value $500 Measurement of Noncompliance
Each Business Day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each Business Day after due date
Page 26 of 38 Addendum No.3
ESS KPR 26
Reporting Period Quarterly Service/Component Quality Management Report Performance Standard The Contractor must conduct quarterly quality assurance audits throughout the contract period on services and operations, and submit the results in quarter Quality Management Report, in a form and substance acceptable to the State, within fifteen (15) calendar days following the end of the reviewing quarter, which is the month following the quarter that is reported. For example, if a Quality Management Report is for July-September results, it will be delivered no later than the fifteenth Business Day in October.
Exhibit E, Scope of Work (SOW), Section 13.1.2, Quality Management Plan, and Exhibit L, Deliverables, ESS 120-D.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 27 of 38 Addendum No.3
ESS KPR 27
Reporting Period One-time Service/Component Operations Turnover Plan Performance Standard The Contractor shall submit an Operations Turnover Plan within sixty (60) calendar days after the Transition Phase is complete or date specified by HHSC.
Exhibit E, Scope of Work (SOW), Section 22.1.3, Turnover Plan, and Exhibit L, Deliverables, ESS 141-D.
Liquidated Damages Value $500 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 28 of 38 Addendum No.3
ESS KPR 28
Service/Component Annual Operations Turnover Plan Performance Standard The Contractor shall submit an Annual Operations Turnover Plan within sixty (60) calendar days prior to the end of each operational year of the contract. Submit a “ready to execute” Turnover Plan six (6) months prior to the end of the contract or upon request by
HHSC.
Exhibit E, Scope of Work (SOW), Section 22.1.3, Turnover Plan, and Exhibit L, Deliverables, ESS 142-D.
Liquidated Damages Value $500 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 29 of 38 Addendum No.3
ESS KPR 29
Service/Component Annual Facilities and Business Structure Turnover Plan Performance Standard The Contractor shall submit an Annual Facilities and Business
Structure Turnover Plan within sixty (60) calendar days prior to the end of each operational year of the Contract. Submit a “ready to execute” Turnover Plan six (6) months prior to the end of the Contract or upon request by HHSC.
Exhibit E, Scope of Work (SOW), Section 22.1.4, Facilities and Business Structure Turnover Plan, and Exhibit L, Deliverables, ESS 153-D.
Liquidated Damages Value $250 Measurement of Noncompliance
Each calendar day after due date
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 30 of 38 Addendum No.3
ESS KPR 30
Reporting Period One-time Service/Component Turnover Results Report Performance Standard The Contractor shall prepare and submit an acceptable Turnover
Results Report within forty-five (45) calendar days after the completion of turnover activities or by the date specified by HHSC.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 22.1.5, Turnover Results, and Exhibit L, Deliverables, ESS 154-D.
Liquidated Damages Value $500 Measurement of Noncompliance
Each calendar day after due date.
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day after due date
Page 31 of 38 Addendum No.3
ESS KPR 31
Service/Component Official Correspondence State Action Request (SAR) Performance Standard The Contractor shall submit complete and accurate responses to any SAR memos no later than thirty (30) calendar days after the Contractor’s receipt of the request or by the date specified in the request.
The Contractor shall include all requirements outlined in Exhibit E, Scope of Work (SOW), Section 21.1.3, Formal Communications Requirements.
Liquidated Damages Value $250 Measurement of Noncompliance
Each calendar day for each instance of late, unacceptable or no response
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each calendar day for each instance of late, unacceptable or no response
Page 32 of 38 Addendum No.3
ESS KPR 32
Service/Component Official Correspondence State Action Request (SAR) Extensions Performance Standard The Contractor must submit written request for extension of a SAR deadline that specifies the estimated date of completion and reasons for the extension no later than three (3) business days after the Contractor receives the SAR.
Exhibit E, Scope of Work (SOW), Section 21.1.3, Formal Communications Requirements.
Liquidated Damages Value $250 Measurement of Noncompliance
Each Business Day for each instance of late request for extension
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each Business Day for each instance of late request for extension
Page 33 of 38 Addendum No.3
ESS KPR 33
Service/Component Language Access Plan Accuracy/Quality Assurance Performance Standard In 100% of calls, the Contractor shall comply with the State established standards, methods and procedures and stipulate this within their Language Access Plan, including but not limited to the following:
1. Identifying persons who need language assistance;
2. Informing persons with limited English proficiency of the language service available to them; and
3. Informing persons with limited English proficiency how to obtain the language services available to them.
The performance measurement for this KPR is assessed for the English and Spanish queues. The Contractor shall report on all Call Center compliance methods and procedures via the Monthly Status Report.
Exhibit E, Scope of Work (SOW), Section 2.1.3, Call Center Requirements.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each percentage point below 100%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below 100%
Page 34 of 38 Addendum No.3
ESS KPR 34
Service/Component Materials Development Written Materials Performance Standard The Contractor shall submit and receive approval from HHSC for all developed/revised materials in both English and Spanish before the Contractor distributes or disseminates such materials.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value $500 Measurement of Noncompliance
Each instance of not obtaining approval prior to distribution
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each instance of not obtaining approval prior to distribution
Page 35 of 38 Addendum No.3
ESS KPR 35
Service/Component Call Abandonment Rate - Monthly Performance Standard The Contractor shall ensure that the percentage of abandoned calls in English and Spanish combined queues does not exceed 15% for the reporting month.
Exhibit E, Scope of Work (SOW), Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each percentage point above 15%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point above 15%
Page 36 of 38 Addendum No.3
ESS KPR 36
Service/Component Call Abandonment Rate for Special Escalation Unit - Monthly Performance Standard The Contractor shall ensure that the monthly average percentage of abandoned calls for all calls referred to the Special Escalation Unit does not exceed 10%.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value $1,000 Measurement of Noncompliance
Each percentage point above 10%
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point above 10%
Page 37 of 38 Addendum No.3
ESS KPR 37
Service/Component Outbound Mail Notices Timeliness Performance Standard The Contractor shall print and mail HHSC generated notices, with required verification documents as follows: 95% within twenty-four (24) hours; 98% within two (2) Mailing Days; and 100% within three (3) Mailing Days from the time the notices are generated and delivered to Contractor by HHSC.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 24.1.3, Determination of Variable Fees.
Liquidated Damages Value $500 Measurement of Noncompliance
Each percentage point below each specified performance standard
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below each specified performance standard
Page 38 of 38 Addendum No.3
ESS KPR 38
Service/Component Client Call Handling Performance Standard The Contractor shall ensure that the Average Handle Time does not exceed 690 seconds for English and 720 seconds for Spanish queues with an acceptable variance of up to 15%. Special Escalation Unit (SEU) staff are excluded from the calculation of Average Handle Time. HHSC maintains the right for the determination of enhanced monitoring and/or CAPs up to and including financial remedies are assessable based upon increased costs associated with non-adherence to this handle time expectation. Factors outside Maximus’ control, policy or HHSC directed script changes can be discussed to adjust these KPR values as necessary and validated and approved by HHSC.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Scope of Work (SOW), Section 24.1.3, Determination of Variable Fees.
$500
Measurement of Noncompliance
Each percentage point below each specified performance standard
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each percentage point below each specified performance standard
Page 39 of 38 Addendum No.3
ESS KPR 39
Reporting Period As Required Service/Component Security Vulnerabilities Performance Standard The Contractor shall remediate identified security vulnerabilities in accordance with the following remediation timeframes, based on severity classification.
A. Critical Vulnerabilities: Remediated within fourteen
(14) calendar days of identification.
B. High Vulnerabilities: Remediated within thirty (30) calendar days of identification.
C. Zero Day Vulnerabilities: Immediate action is required upon discovery or notification, including mitigation, containment, or remediation actions to reduce risk until a permanent fix is implemented.
The Contractor shall comply with detailed requirements outlined in Exhibit E, Statement of Work, Section 11.1, Security Management and Exhibit L, Deliverables, ESS 109-D..
$1000
Measurement of Noncompliance
Each Calendar Day for each instance of late report
Calculation/ Reporting Process
The calculation of Liquidated Damages is based on the following formula:
a = Measurement b = Frequency c = Base LD Value
(a)(b)(c) = LD to be assessed at HHSC’s discretion Therefore, the calculation would be as follows:
a = Each Business Day for each instance of late request for extension c = $1000
File details come from the government source that posted it. Updated .