This is a detailed paint specification document (Exhibit K) for a vessel preservation project under the Washington State Department of Corrections (DOC). The specifications outline comprehensive painting requirements for a vessel's underwater hull, freeboard, and topsides, with specific surface areas including approximately 1,600 ft² underwater hull, 300 ft² freeboard, 1,800 ft² vessel exterior, and 250 ft² striping. The document specifies PPG Protective and Marine Coatings as the current paint system, with provisions for contractors to propose alternative coating systems subject to DOC approval. The work requires NACE level 2 certified inspectors for surface preparation inspection and coating thickness verification, with detailed requirements for surface preparation, coating application, and environmental conditions during application.

The specifications detail a multi-stage coating process with specific products and application requirements, including Amerlock Sealer, Amercoat 240/240LT, ABC3 ablative antifoul, Amershield, PSX ONE, and Interlux Toplac for different vessel areas. The color scheme includes black antifoul base coat with red topcoat for underwater hull, black for freeboard, white for topsides, and Oxford Blue for striping. The document emphasizes strict adherence to manufacturer's recommendations for surface preparation, coating application, and quality control measures, including detailed requirements for inspection documentation and protection of adjacent surfaces during work execution.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT K

PRESERVATION SPECIFICATIONS

General

PPG Protective and Marine Coatings is the current paint system for the Vessel. The paint system shall be used as outlined below. If the Contractor is not able to provide the specified coating system or has an alternative coating system that is equal to or better than the provided system, then a written request for the alternative shall be provided to DOC by the Contractor.

For bidding purposes, the Contractor shall assume the following minimum surface areas. Spot repair shall be considered up to 10% of a given surface area. Full coat means 100% coverage of a given area per coat. After surveying the vessel, the actual square footage of area to be coated shall be confirmed by the Contractor. Any differences from quantities shown shall be provided to DOC for approval to proceed.

• Approximately 1600 ft2 underwater hull – keel to waterline (antifoul)

• Approximately 300 ft2 freeboard – waterline to deck, including bits (black)

• Approximately 1800 ft2 vessel exterior – topsides, wheelhouse, rails, etc. (white)

• Approximately 250 ft2 striping (blue)

Compliance with Manufacturer’s Recommendations

Contractor shall apply all coatings in accordance with manufacturer’s recommendations.

For areas of painting that do not clearly fall under "New Coating - 100% Blasted" or "Spot Repair", paint manufacturer’s recommendations shall be followed.

Solvents used for thinning and clean-up shall be in strict accordance with the coating manufacturer’s recommendations.

Contractor shall obtain coverage estimates from the most current product data sheets available from coating manufacturer, or in writing from the manufacturer’s technical representative.

Inspections

All abrasive blasted and other surface preparation shall be inspected by a qualified inspector (minimum NACE level 2) and approved by DOC or the coating manufacturer’s technical representative prior to application of any coating.

Required thickness of coatings and adequacy of application shall be confirmed through spot checks by a qualified inspector (minimum NACE level 2) in the presence of DOC or the coating manufacturer’s technical representative after each coat is applied.

Contractor shall provide DOC, upon completion of preservation work, written documentation of all surface profile measurements, soluble salt conductivity measurements and coating thickness measurements taken, including approximate locations.

Prerequisites to Coating Application

Welds or connections requiring pressure or water testing or visual inspection shall not be coated until after all tests and inspections are complete and the weld or connection has been accepted by USCG inspectors and DOC.

Prior to the application of coatings, all surfaces shall be dry and free of foreign matter such as dirt, dust, crayon marks, grease, mill scale, residual abrasive material, rust, salt deposits and weld spatter.

A freshly blasted steel surface shall not be left more than six (6) hours without primer, unless approved by the paint manufacturer’s representative. The paint manufacturer’s representative can supply alternate requirements for such surfaces. Unless otherwise agreed upon, the Contractor shall re-blast/pressure wash to the originally required quality, removing all traces of rust bloom.

Where any coating has been damaged by welding, burning or other causes as a result of the work, the damaged area shall be disk sanded, solvent wiped, and a full coating system built up. Overlaps between existing and new coating systems shall be feathered to provide a smooth finish at the transition.

Before application of any follow-on coat, all bare or lightly covered spots in the previous coat shall be cleaned and built up to the required thickness.

Requirements during Coating Application and Curing

Film thickness shall be as specified unless the manufacturer details in writing that the specifications are not correct. Where both film thickness per coat and number of coats are specified, both requirements shall be met.

All surfaces shall be kept dry, clean and free of rust and foreign matter at the time of application of any coating and throughout the curing period.

Ensure that all coats in multi-coat systems, except stripe coats, are applied in contrasting colors.

Coatings shall be applied under environmental conditions conforming to the manufacturer’s recommendations as listed on the manufacturer’s published data sheets for the coatings being applied.

Coatings shall not be applied at ambient, or surface temperatures less than the minimum application temperature recommended by the manufacturer for the coating involved. No coating shall be applied when the dew point temperature is equal to or greater than the surface temperature of the surface to be coated.

Protection of Items and Surfaces during Surface Prep and Painting

Special care shall be taken to avoid contamination of adjoining spaces, machinery, equipment and finished surfaces during sandblasting, painting and other activities associated with surface preparation and painting.

The Contractor shall carefully mask and protect all equipment, materials and surfaces that could be damaged by abrasive blasting, dust from the blasting process or other surface preparation techniques, or which could have their function and appearance degraded by paint overspray. Open ends of piping, vent pipe openings, ventilation openings, and other such features shall be similarly covered and protected from entry of sandblast grit and paint residue.

Contractor shall remove and dispose of any refuse, chips, grit, etc. generated as a result of surface preparation work.

Correction of Damage Resulting from Paint Overspray and Grit Blasting

Any paint overspray applied to any of the aforementioned items and surfaces shall be immediately and carefully removed.

Machinery, equipment and surfaces damaged, marred or contaminated shall be promptly repaired, replaced or cleaned to pre-existing condition at the Contractor’s expense.

Surface Preparation and Painting

Surface preparation shall be defined by the Steel Structures Painting Council (SSPC). Visual Standard SSPC-VIS-1-89 and/or SSPC-SP WJ-2 is invoked and will be used to judge the adequacy of surface preparations.

Power tools used in preparation work shall be operated in such a manner that no burrs or sharp ridges are left on the surface and no sharp cuts are made in the steel.

Surface defects revealed by the blast cleaning process should be ground, filled, or treated in the appropriate manner. If oxidation of the steel occurs between blasting and application of paint schedule, the surface should be re-blasted to the specified visual standard.

Additional surface preparation requirements are included in the Paint Schedule sections.

DESCRIPTION OF PRESERVATION WORK TO BE COMPLETED

Paint Schedule

Underwater Hull Full Recoat with Spot Repair: Keel to Waterline, Fresh water (3,000-4,000 PSI) HP wash with fan tip entire underwater body to remove marine growth and salts.

Spot Repair:

Spot power tool clean areas with corrosion or mechanical damage to SSPC-SP3. Ensure edges are properly feathered.

Apply 1st spot touch-up coat Amerlock Sealer penetrating epoxy at 1-2 mils MDFT. Allow 24 hours min dry time, 3 days maximum.

Apply 2nd spot touch-up coat Amercoat 240/240LT at 6-8 mils MDFT. Allow 8 hours min dry time, 30 days maximum.

Apply 3rd spot touch-up coat Amercoat 240/240LT at 6-8 mils MDFT. Allow 8 hours min dry time, 24 hours maximum.

Underwater Hull Full Recoat:

Apply 1st full coat ABC3 ablative antifoul (AF) black at 5-6 mils MDFT while the Amercoat 240/240LT epoxy is still tacky (thumbprint). Allow a minimum of 6 hours before recoating, no maximum.

Apply 2nd full coat ABC3 ablative AF red at 5-6 mils MDFT. Apply second coat of anti-foul a minimum of 24 hours prior to launch.

AF topcoat color to be red.

Freeboard Full Recoat with Spot Repair: Waterline to Deck, Including Mooring Bitts

Fresh water (3,000 – 4,000 PSI) HP wash to remove salts. Degrease as necessary using Prep 88 cleaner, with special attention to engine and generator exhaust outlets. Allow to stand on surface 10-15 minutes.

Do not allow to dry on surface. Fully rinse off all traces of Prep #88 with fresh water.

Spot Repair:

Spot blast areas of corrosion/mechanical damage to SSPC-SP6 - Commercial Blast or spot power tool clean areas of corrosion/mechanical damage to SSPC-SP15. Ensure edges are properly feathered.

Apply 1st spot touch-up coat Amerlock Sealer penetrating epoxy at 1-2 mils MDFT. Allow 24 hours minimum dry time, 3 days maximum.

Apply 2nd spot touch-up coat Amercoat 240/240LT at 6-8 mils MDFT. Allow 8 hours minimum dry time, 14 days maximum.

Apply 3rd spot touch-up coat Amercoat 240/240LT at 6-8 mils MDFT. Allow 8 hours minimum dry time, 14 days maximum.

Freeboard Full Recoat:

Apply full coat Amershield black at 3-4 mils MDFT. Topcoat color to be Black.

Topsides Full Recoat with Spot Repair: Above Deck Exterior Including Wheelhouse, Mast, Striping, Boarding Doors, and Rails

Fresh water high pressure wash (3000 – 4000 PSI) to remove salts. Degrease as necessary using Prep #88 cleaner. Dilute, 3 parts water to 1 part Prep #88. Fully rinse off all traces of Prep #88 with fresh water.

Upper deck perimeter handrails shall be prepared and coated all round.

Deck surfaces, inboard surfaces of bulwarks, ladder-well handrails, and canvas pipe frame are excluded.

Spot Repair:

Spot blast areas of corrosion/mechanical damage to SSPC-SP6 Commercial Blast, or spot power tool clean to SPCC-SP15 (2-4 mil profile) areas of corrosion/mechanical damage. Ensure edges are properly feathered.

Apply 1st spot touch-up coat Amerlock Sealer penetrating epoxy at 1-2 mils MDFT. Allow 24 hours minimum dry time, 3 days maximum.

Apply 2nd spot touch-up coat Amercoat 240/240LT at 6-8 mils MDFT. Allow 8 hours minimum dry time, 14 days maximum.

Apply 3rd spot touch-up coat Amercoat 240/240LT at 6-8 mils MDFT. Allow 8 hours minimum dry time, 4 days maximum.

Topsides Full Recoat (excluding blue stripe):

Apply 1st full coat PSX ONE using spray or brush/roll at 2-3 mils MDFT.

Apply 2nd full coat PSX ONE white using spray or brush/roll at 2-3 mils MDFT. Topcoat color to be White.

Preparation and Coating for Topsides Stripe:

Mechanically abrade with 220 grit paper. Remove sanding dust by brushing, dusting and wiping. If wiping with solvent, allow to dry completely before coating.

Apply 1st stripe coat Interlux Toplac with brush/roller at 1.5 mils MDFT.

Mechanically abrade with 320 grit paper. Remove sanding dust by brushing, dusting and wiping. If wiping with solvent, allow to dry completely before coating.

Apply 2nd stripe coat Interlux Toplac with brush/roller at 1.5 mils MDFT. All coats to be Oxford Blue.

Draft Marks

Draft marks shall be repainted at existing locations – both ends (bow and stern). Number paint color shall be White.