Exhibit_I-_6034_Signal_091626_s&s.pdf
PDF 2 MB Posted
- Solicitation number
- 27-B-17JD, C2103
- Issued by
- Volusia County, Florida
About this file
This document is a Signal 091626 worksheet prepared for the Beresford Avenue Extension Phase 2B project in Florida, involving traffic signal analysis and coordination. The exhibit provides detailed signal timing parameters and phasing information for the intersection of S. Kepler Road/DR. MLK Beltway and the proposed extension route. The document outlines cycle lengths, phase splits, and coordination plans necessary to optimize traffic flow at the signal location during the construction and subsequent operation of the roadway extension to SR 44. The signal timing data presented establishes the technical specifications required for traffic management at this critical intersection point along the project corridor.
The worksheet functions as a supporting technical exhibit to inform contractors and engineers of the precise signal timing requirements and coordination needs for the Beresford Avenue Extension Phase 2B project. This signal timing analysis is essential for ensuring seamless traffic operations during construction phasing and permanent roadway operations. The document serves as part of the project's technical specifications and represents the traffic engineering analysis completed during the design phase to support contractor planning and implementation of both temporary and permanent traffic control measures.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DanFolsom Accuracy Statement
DanFolsom DWF Stamp
| T1 |
| T2 |
| T3 |
| T4 |
| T5 |
| T6 |
| 2026-09-16T16:29:52-0400 | |
| Daniel Folsom |
File details come from the government source that posted it. Updated .