This is a structural analysis report prepared by CADJAZZ Engineering Consultants for Traffic Planning & Design, Inc., detailing the design and analysis of four prestressed concrete strain poles (Type PVII) and support cables for the Beresford Avenue Extension Phase 2B project in Volusia County, Florida, spanning from S. Kepler Road/Dr. MLK Beltway to SR 44. The report provides comprehensive structural analysis using the ATLAS V7.2 design program in accordance with FDOT Structures Manual (2026) specifications and AASHTO LRFD standards. The design incorporates a 140 mph wind speed (300-year recurrence interval per FDOT standards), includes two cable systems (a 7/16" catenary cable and a 1/2" messenger cable), and addresses signal mounting, lighting fixtures, and traffic control requirements. Four poles are designed with 6-inch backplates for signal heads, with spans ranging approximately 1,500 to 1,800 inches between poles. The analysis examines multiple load combinations including dead load only and combined dead load with wind load conditions (Load Combination 1 and 2), with the design controlling at 1.10 times dead load plus 1.00 times wind load for LRFD Extreme Event I conditions.
The structural design confirms that all four poles meet capacity requirements, with Poles 1 and 2 each requiring approximately 12.7 to 12.8 feet of embedment length (exceeding the 9-foot minimum for Type PVII poles), while Poles 2 and 3 (in the SP2-SP3 span analysis) require approximately 13.6 to 14.1 feet of embedment. The catenary cable system is designed with a 0.438-inch diameter (0.116 square inch area) with factored resistance of 9.0 kips, while the messenger cable features a 0.500-inch diameter (0.150 square inch area) with factored resistance of 12.5 kips. Resultant base moments range from approximately 215 to 290 kip-feet depending on pole location and load combination. Soil conditions assume cohesionless fine sand with a 30-degree friction angle and 50 pounds per cubic foot unit weight per contract GEC Contract 22-SQ-172SR/Newkirk Project #P-5852. All design calculations demonstrate structural adequacy under the prescribed loading conditions, with concrete strength specified at 6,000 psi and pole material properties varying by effective height.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Strain Pole Analysis Beresford Volusia County
STRUCTURAL ANALYSIS
FOR
BERESFORD AVENUE STRAIN POLE &
CABLE EVALUATION
SR 44
N. SUMMIT AVENUE
May 14, 2026
Prepared for:
TRAFFIC PLANNING & DESIGN, INC.
535 Versailles Drive Maitland, FL 32751
Prepared by:
CADJAZZ ENGINEERING CONSULTANTS
117 E. Monument Avenue
Kissimmee, Florida 34741 herb green Herb Green PE Seal
TABLE OF CONTENTS
Cover Sheet 1
Table of Contents 2
Structural Design Basis 3
Plan View Exhibit 4
General Notes, Pole Layout & Spans 5
Proposed & Design Loading & Schedule 6
Design Results – LRFD Extreme Event Loading 7
Design Results – Vector Sum Load Condition 3 8
Concrete Poles Design Program Ref. Index 641-010 9 - 10
Span Wire Assembly Section 634 Ref. 11 - 12
ATLAS DESIGN MODELS
SP1 - SP2 Pole and Cable Design
SP2 – SP3 Pole and Cable Design
SP3 – SP4 Pole and Cable Design
SP4 – SP1 Pole and Cable Design
STRUCTURAL DESIGN BASIS
Design Specifications and Criteria:
FDOT Structures Manual (2026) Analysis Program: Atlas V7.2 from U of F Bridge Software Institute Design Wind Speed = 150 mph (Volusia County) less 10 mph for 300-year (140 mph) design per FDOT Structural Manual Volume 3 (3.8.2 Basic Wind Speed).
Signals have 6” backplates Messenger Cable Diameter 1/2” Catenary Cable Diameter 7/16” Concrete Pole Type PVII Soil Design per GEC Contract 22-SQ-172SR/Newkirk Project #P-5852:
Dated: November 21, 2025 Phi Angle = 30 degrees Unit Weight = 50 p.c.f
Purpose:
Analyze and design for load resistance for the four new prestressed concrete poles and support/messenger cables.
Standard Plans Instructions Topic No. 625-010-003
Index 641-010 Concrete Poles FY 2026-27
Index 641-010 Concrete Poles
Design Criteria
AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals (LRFDLTS-1); Structures Manual (SM), Volume 3, FDOT Modifications to LRFDLTS-1; Structures Manual (SM)Introduction, I.6 References; FDOT Design Manual (FDM)
Design Assumptions and Limitations
See FDM 261 and Structures Manual (SM),Volume 3 for additional design criteria.
The following computer-based design program is available for use on the Structures Design Office Website:
University of Florida Bridge Software Institute ATLAS
Program v7 or higher. For Pole Types P-III through P-VIII, design poles within the following limits:
30 ft. ≤ Length (L) ≤ 65 ft.
Pole Height (H) ≤ 50 ft.
Foundations may be designed assuming a 3’-6” diameter (See Specification 641). The foundation depths for the following poles must be designed but may be no shallower than the following minimums:
Pole Types P-III through P-V 7 feet
Pole Types P-VI 8 feet
Pole Types P-VII through PVIII 9 feet Foundations are designed using the following soil criteria:
Classification:
Cohesionles s (Fine Sand) Friction Angle:
30 Degrees
Unit Weight: 50 lbs/cubic foot (assumed submerged)
For Pole Types P-II and P-III, nominal moment capacity may be estimated as:
Aps fpu M (es timat e) A f d 1 0.59 n ps pu p bdp fc
Note: Refer to LRFD Bridge Design Specifications for definition of variables.
Standard Plans Instructions Topic No. 625-010-003
Index 641-010 Concrete Poles FY 2026-27
Determine maximum loads to be placed on poles, and select the required pole type meeting the requirements of Table 641-1 (shown on the next page).
Plan Content Requirements
Complete the "Strain Pole Schedule" provided with the FDOT CAD Bar Menu, Linked Data Manager, and include in the Roadway Plans.
Signalization Plans:
See the FDM 941. Include poles in “Tabulation of Quantities”.
Table 641-1
Factored Flexural Resistance Mr = Ø Mn* at Finished Grade
H (feet) Type of Strain Pole
P-IV (kip-ft) P-V (kip-ft) P-VI (kip-ft) P-VII (kip-ft) P-VIII (kip-ft) 20 84 150 184 263 350 22 88 155 190 271 359 24 92 161 195 279 368 26 96 166 201 286 378 28 100 172 207 294 387 30 104 178 212 301 397 32 109 183 218 309 406 34 113 189 224 316 415 36 117 195 229 324 425 38 121 200 235 332 434 40 125 206 241 339 443 42 130 212 246 347 453 44 134 217 252 354 462 46 138 223 257 362 471 48 142 228 263 369 481 50 146 234 269 377 490
* Mr ≥ Mu
Payment
Item number Item Description Unit Measure
641-2-AB Prestressed Concrete Poles EA
See the BOE and Specification 641 for additional information on payment, pay item use and compensation.
POLE 1 & POLE 2 INPUT AND LRFD EXTREME LOAD CONDITION MODEL
VERSION NUMBER 7.2.0
CONTROL
TITLE = SP1_SP2.in
MODEL = TWO
NODES = 17
CLEAR = 291.16
TOPDIST = 12.00
CABLE = 2
SPEED = 140.00
ANGLE = 90.00
STATUS = CHECK
KZFAC = 1
GUST = 1.14
DIRECT = 0.85
DEADLOADFAC = 1.10
WINLOADFAC = 1.00
COEFFFLAG = 2
DRAG = 0.75
UPLIFT = 0
CUSTOMFLAG = 0
CABLES
1 3 7 S= 5.00 W= 3.333E-05 P= 0 2 2 6 T= 1.00 W= 4.333E-05 P= 1
COORDINATE
1 X= 1.2000000E+02 Y= 9.7200000E+02 Z= -8.4000000E+00 2 X= 1.2000000E+02 Y= 9.7200000E+02 Z= 2.7916000E+02 3 X= 1.2000000E+02 Y= 9.7200000E+02 Z= 3.7036227E+02 4 X= 1.4399931E+02 Y= 9.7181819E+02 Z= -8.4000000E+00 5 X= 1.7040000E+03 Y= 9.6000000E+02 Z= -1.4400000E+01 6 X= 1.7040000E+03 Y= 9.6000000E+02 Z= 2.7916000E+02 7 X= 1.7040000E+03 Y= 9.6000000E+02 Z= 3.7036227E+02 8 X= 1.7279993E+03 Y= 9.5981819E+02 Z= -1.4400000E+01 9 X= 1.0140000E+03 Y= 9.6480000E+02 C= 1
10 X= 1.0140000E+03 Y= 9.6480000E+02 Z= 2.7916000E+02 11 X= 1.0140000E+03 Y= 9.6480000E+02 Z= 2.4408000E+02 12 X= 1.1580000E+03 Y= 9.6360000E+02 C= 1 13 X= 1.1580000E+03 Y= 9.6360000E+02 Z= 2.7916000E+02 14 X= 1.1580000E+03 Y= 9.6360000E+02 Z= 2.5110000E+02 15 X= 1.3020000E+03 Y= 9.6360000E+02 C= 1 16 X= 1.3020000E+03 Y= 9.6360000E+02 Z= 2.7916000E+02 17 X= 1.3020000E+03 Y= 9.6360000E+02 Z= 2.5110000E+02
BOUNDARY
- DOF= f f f f f f
- DOF= r r r r r r
- DOF= r r r r r r
- DOF= f f f f f f 5 DOF= f f f f f f 6 DOF= r r r r r r 7 DOF= r r r r r r 8 DOF= f f f f f f 9 DOF= r r r r r r
10 DOF= r r r r r r 11 DOF= r r r r r r 12 DOF= r r r r r r 13 DOF= r r r r r r 14 DOF= r r r r r r 15 DOF= r r r r r r 16 DOF= r r r r r r 17 DOF= r r r r r r
PRIMARY
4, 1 1 A= 0.1160 E= 2.45000E+04 1 3 , 9 M= 1 C= 1 2 9, 12 M= 1 C= 1 3 12, 15 M= 1 C= 1 4 15 , 7 M= 1 C= 1
SECONDARY
4, 1 1 A= 0.1500 E= 2.45000E+04 1 2, 10 M= 1 C= 2 2 10, 13 M= 1 C= 2 3 13, 16 M= 1 C= 2 4 16 , 6 M= 1 C= 2
CONNECTORS
3, 2 1 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 2 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 1 9, 10, 3 M= 1 2 12, 13, 3 M= 2 3 15, 16, 3 M= 2
LIGHTS
3, 2 1 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 S= 1 B= 6 P= 1.91889E+03, 1.91889E+03 2 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 S= 1 B= 6 P= 1.55328E+03, 1.55328E+03 1 10, 11, 3 M= 1 2 13, 14, 3 M= 2 3 16, 17, 3 M= 2
BEAM
4, 1
1 S= 1 T= NVII X= PVII FC= 6000.0
1 1, 2, 4 M= 1 2 2, 3, 4 M= 1 3 5, 6, 8 M= 1 4 6, 7, 8 M= 1
SIGNS
9 F= 0.00000E+00, 0.00000E+00, -8.74720E-02 12 F= 0.00000E+00, 0.00000E+00, -6.33694E-02 15 F= 0.00000E+00, 0.00000E+00, -6.82737E-02
WIND
9 F= 0.00000E+00, 8.45323E-02, 0.00000E+00 10 F= 0.00000E+00, 9.63801E-02, 0.00000E+00 12 F= 0.00000E+00, 2.34430E-02, 0.00000E+00 13 F= 0.00000E+00, 2.67413E-02, 0.00000E+00 15 F= 0.00000E+00, 4.45550E-02, 0.00000E+00 16 F= 0.00000E+00, 5.06970E-02, 0.00000E+00
LOADS
3 F= 0.00000E+00, 0.00000E+00, -1.49208E-02 7 F= 0.00000E+00, 0.00000E+00, -6.72708E-03 9 F= 0.00000E+00, 0.00000E+00, -1.91746E-02
10 F= 0.00000E+00, 0.00000E+00, -1.85288E-03 11 F= 0.00000E+00, 0.00000E+00, -6.64445E-02 12 F= 0.00000E+00, 0.00000E+00, -6.81477E-03 13 F= 0.00000E+00, 0.00000E+00, -2.01107E-03 14 F= 0.00000E+00, 0.00000E+00, -5.45436E-02 15 F= 0.00000E+00, 0.00000E+00, -1.14300E-02 16 F= 0.00000E+00, 0.00000E+00, -2.30016E-03 17 F= 0.00000E+00, 0.00000E+00, -5.45436E-02
GENERATE
CLEAR=17.50 VELOCITY=140.0 ANGLE=90.0 STAT=2 SAG=0.050 DIFF=1.00 TOPDIST=1.00
SYSTEM
MODEL TYPE= TWO - POINT
POLES
M=1 S=1 TYPE=NVII XTYPE=PVII FC=6000.0
P=1 X=10.0 Y=81.0 Z=-0.70 M=1 P=2 X=142.0 Y=80.0 Z=-1.20 M=1
WIRES
M=1 D=7,8 E=24500,24500 T=1.00
W=1 POLES=1,2 M=1
SIGNAL
M=1 R=3.00 S=1 D=12 E=W6 L=AL G=3
M=2 R=3.00 S=1 D=12 E=W6 L=AL G=4
S=1 X=84.5 Y=80.4 M=2 C=1 S=2 X=96.5 Y=80.3 M=1 C=1 S=3 X=108.5 Y=80.3 M=1 C=1
GRIDDIM
G=200 D=10
DESIGN
S=2 F=0.00 W=0.600 G=50.00 P=30.00 WR=0.500
| Analysis of Traffic Lights And Signs | | Version 7.2.0 | | Developed by : | | Bridge Software Institute | | No warranty, expressed or implied, is made by the Florida | | Department of Transportation or the University of Florida | | as to the accuracy and functioning of any programs or the | | results they produce,nor shall the fact of distribution | | constitute any such warranty, and no responsibility is | | assumed by the Florida Department of Transportation or | | the University of Florida in any connection therewith. | | Department of Civil Engineering | | University of Florida | | Gainesville, Fl 32611 |
*** NOTE - Pole convergence increased to 2.0*default for wind speeds > 85 mph:
Tolerance = 0.200000
Input Data File = C:\Users\Lisa G\OneDrive\Documents\Signal Design\VC STRAIN POLE\SP1_SP2.in
ATLAS EXECUTION STATUS
1.Check the Model for Adequacy
CONTROL DATA (More Information found in ATLAS HELP)
2.Problem Title
SP1_SP2.IN
3. Structural Parameters :
Number of Nodes = 17 Number of Cables = 2 Lowest Point of Catenary = 24.26 ft
4.Wind Data :
Wind Speed (Miles per Hour) = 140.00 Wind Direction (Angle from +ve X axis) = 90.0
5.Nonlinear iteration Parameters :
Number of Iterations (Shape Finder) = 200 Number of Iterations (Gravity Solution) = 200 Number of Iterations (Wind Solution) = 200 Number of Loops for Shape Calculation = 5 Number of Cycles (Shape-Stiffness Iteration) = 1800 Force Tolerance for Gravity Solution (%) = 5.00 Force Tolerance for Wind Solution (%) = 5.00 Pole Displacement Tolerance = 0.200000
ECHO OF NODAL POINT INPUT DATA
Nodal Point Coordinates Boundary Conditions
Node X (in)
Y (in)
Z (in)
Tx Ty Tz Rx Ry Rz
1 120.000 972.000 -8.400 F F F F F F 2 120.000 972.000 279.160 R R R R R R 3 120.000 972.000 370.362 R R R R R R 4 143.999 971.818 -8.400 F F F F F F 5 1704.000 960.000 -14.400 F F F F F F 6 1704.000 960.000 279.160 R R R R R R 7 1704.000 960.000 370.362 R R R R R R 8 1727.999 959.818 -14.400 F F F F F F 9 1014.000 964.800 292.474 R R R R R R
10 1014.000 964.800 279.160 R R R R R R 11 1014.000 964.800 244.080 R R R R R R 12 1158.000 963.600 298.801 R R R R R R 13 1158.000 963.600 279.160 R R R R R R 14 1158.000 963.600 251.100 R R R R R R 15 1302.000 963.600 310.365 R R R R R R 16 1302.000 963.600 279.160 R R R R R R 17 1302.000 963.600 251.100 R R R R R R
ECHO OF ELEMENT INPUT DATA
- Pole/Beam Element Data
Number of Property Sets = 1
Property Set = 1 Pole type = PVII Concrete Strength, F`c (psi) = 6000.00
NOTE : The properties used in the analysis were obtained at the effective heights of the poles and are provided below. For more information refer to the report that accompanies the program.
Pole/Beam Connectivity and Properties Used
Mem Nodes
I J K Mat Area E Properties
I33 I22 J G in^2 ksi in^4 in^4 in^4 ksi
1 1 2 4 1 222.43 4415.20 8537.91 8537.91 17075.83 1698.15 2 2 3 4 1 176.55 4415.20 4142.91 4142.91 8285.83 1698.15 3 5 6 8 1 223.12 4415.20 8640.21 8640.21 17280.42 1698.15 4 6 7 8 1 176.55 4415.20 4142.91 4142.91 8285.83 1698.15
- Primary Cable Element Data
Primary Cable Connectivity and Properties
Nodes Properties
- Secondary Cable Element Data
Secondary Cable Connectivity and Properties
Mem I J Mat Cable Area E
Mem I J Mat Cable Area in^2
E ksi
1 3 9 1 1 0.1160 24500.0 2 9 12 1 1 0.1160 24500.0 3 12 15 1 1 0.1160 24500.0 4 15 7 1 1 0.1160 24500.0 in^2 ksi
1 2 10 1 2 0.1500 24500.0 2 10 13 1 2 0.1500 24500.0 3 13 16 1 2 0.1500 24500.0 4 16 6 1 2 0.1500 24500.0
- Connector Element Data
Number of Property Sets = 2
Connector Connectivity and Properties
Nodes Properties Mem I J K Mat Area in^2 E ksi I33 in^4 I22 in^4
J in^4
G ksi
1 9 10 3 1 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 2 12 13 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 3 15 16 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4
- Light Element Data
Property Line = 1 Projected area on X-Z plane = 1918.89 in^2 Projected area on Y-Z plane = 1918.89 in^2
Property Line = 2 Projected area on X-Z plane = 1553.28 in^2 Projected area on Y-Z plane = 1553.28 in^2
Light Connectivity and Properties
Nodes Properties Mem I J K Mat Area in^2 E ksi I33 in^4 I22 in^4
J in^4
G ksi
1 10 11 3 1 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 2 13 14 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 3 16 17 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4
- Wind Load Factors
Directionality Factor = 0.85 Drag Coefficient = 0.60 for signals with backplate
= 0.70 for signals without backplate Uplift Coefficient = 0.00
CONCENTRATED APPLIED LOADS
- Sign/Cable/Light weights (Kips)
Node X Y Z
3 0.00000 0.00000 -0.01492 7 0.00000 0.00000 -0.00673 9 0.00000 0.00000 -0.01917
10 0.00000 0.00000 -0.00185 11 0.00000 0.00000 -0.06644 12 0.00000 0.00000 -0.00681 13 0.00000 0.00000 -0.00201 14 0.00000 0.00000 -0.05454 15 0.00000 0.00000 -0.01143 16 0.00000 0.00000 -0.00230 17 0.00000 0.00000 -0.05454
- Wind loads on Cables
NOTE : The wind forces on the cables are applied as shown below. The wind forces on the lights and signs are calculated during the analysis. For more information, refer to Atlas Help Manual.
Node X Y Z XX YY ZZ
9 0.00000 0.08453 0.00000 0.00000 0.00000 0.00000 10 0.00000 0.09638 0.00000 0.00000 0.00000 0.00000 12 0.00000 0.02344 0.00000 0.00000 0.00000 0.00000 13 0.00000 0.02674 0.00000 0.00000 0.00000 0.00000 15 0.00000 0.04455 0.00000 0.00000 0.00000 0.00000 16 0.00000 0.05070 0.00000 0.00000 0.00000 0.00000
D
E
S I G N
S E C T
I
O
N
Units: Kips, Feet |
- CABLE DESIGN
A resistance factor is used in the calculation of factored cable resistance, which is given below:
Wire resistance factor = 0.50
Cable Number = 1
* Catenary Cable *
Starting Node = 3 Ending Node = 7 Cable Tension (k) = 1.839 Cable Sag (%) = 4.626 Cable Diameter (in) = 0.438 Cable Area (sq. in) = 0.116 Cable Weight (lb/in) = 0.033 Factored Cable Resistance (k) = 9.000
Cable Size is Adequate for current Tensile Force Load Combination 2: 1.10*(DL) controls
+ 1.00*(WL)
Cable Number = 2
* Messenger Cable *
Starting Node = 2 Ending Node = 6 Cable Tension (k)
6.817
Cable Diameter (in) = 0.500 Cable Area (sq. in) = 0.150 Cable Weight (lb/in) = 0.043 Factored Cable Resistance (k) = 12.500
Load Combination 2: 1.10*(DL) + 1.00*(WL) controls
- POLE DESIGN
Load Combination 2 (LRFD Extreme Event I): 1.10*(DL) + 1.00*(WL) is used for design of this pole
Pole Number = 1 Pole Node Numbers = 1 2 3 Input Pole Type = PVII Input Wind Speed (mph) = 140.000 Input Wind Angle (deg) = 90.000 Applied Wind Angle (deg) = 90.000
Resultant Base Shear (kips) = 8.407
Resultant Base Moment (kip-ft) = 215.219 Resultant Base Moment Angle (deg) = 0.434 Pole Strong Axis Angle (deg) = 0.434 Biaxial Moment Reduction Factor = 1.000 Required Pole Phi * Mn (kip-ft) = 215.219
Input Pole Capacity (kip-ft) = 310.970
Required Embedment Length (ft) = 12.691 Minimum Embedment Length (ft) = 9.000 (= 0.000 if custom pole, and requires separate check) Pole Height Above Ground (ft) = 32.564
The Pole specified in the INPUT is adequate to support the base moment.
Pole Number = 2 Pole Node Numbers = 5 6 7 Input Pole Type = PVII Input Wind Speed (mph) = 140.000 Input Wind Angle (deg) = 90.000
Resultant Base Shear (kips) = 8.472
Resultant Base Moment (kip-ft) = 219.126 Resultant Base Moment Angle (deg) = 0.434 Pole Strong Axis Angle (deg) = 0.434 Biaxial Moment Reduction Factor = 1.000 Required Pole Phi * Mn (kip-ft) = 219.126
Input Pole Capacity (kip-ft) = 312.862
Required Embedment Length (ft) = 12.760 Minimum Embedment Length (ft) = 9.000
Pole Height Above Ground (ft) = 33.064
| L O A D C O M B I N A T I O N 1 | | [DL] only |
| Units: Kips, Inches |
Final Coordinates
Node X Y Z
1 120.0000 972.0000 -8.4000 2 120.4806 971.9964 279.1600 3 120.7350 971.9944 370.3622 4 143.9993 971.8182 -8.4000 5 1704.0000 960.0000 -14.4000 6 1703.4969 960.0038 279.1600 7 1703.2366 960.0058 370.3622 8 1727.9993 959.8182 -14.4000 9 1015.1449 965.2186 291.1623
10 1015.1449 965.2186 279.1622 11 1015.1451 965.2186 244.0818 12 1159.2976 964.1265 292.8764 13 1159.2977 964.1265 279.1615 14 1159.2979 964.1265 251.1013 15 1303.2191 963.0362 305.0574 16 1303.2196 963.0362 279.1648 17 1303.2201 963.0362 251.1046
Dead Load Applied to the Structure
Node Fx Fy Fz Mom-X Mom-Y Mom-Z
1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3 0.0000 0.0000 -0.0149 0.0000 0.0000 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 7 0.0000 0.0000 -0.0067 0.0000 0.0000 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0000 -0.0192 0.0000 0.0000 0.0000
10 0.0000 0.0000 -0.0019 0.0000 0.0000 0.0000 11 0.0000 0.0000 -0.0664 0.0000 0.0000 0.0000 12 0.0000 0.0000 -0.0068 0.0000 0.0000 0.0000 13 0.0000 0.0000 -0.0020 0.0000 0.0000 0.0000 14 0.0000 0.0000 -0.0545 0.0000 0.0000 0.0000 15 0.0000 0.0000 -0.0114 0.0000 0.0000 0.0000 16 0.0000 0.0000 -0.0023 0.0000 0.0000 0.0000 17 0.0000 0.0000 -0.0545 0.0000 0.0000 0.0000
Final Displacements
Node Tx Ty Tz Rot-X Rot-Y Rot-Z
2 0.4806 -0.0036 -0.0000 0.0000 0.0027 0.0000 3 0.7350 -0.0056 -0.0000 0.0000 0.0029 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 -0.5031 0.0038 -0.0000 -0.0000 -0.0027 0.0000 7 -0.7634 0.0058 -0.0001 -0.0000 -0.0029 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0001 -0.0000 0.0023 -0.0000 -0.0000 -0.0000
10 0.0001 -0.0000 0.0022 -0.0000 -0.0000 0.0000 11 0.0003 -0.0000 0.0018 -0.0000 -0.0000 0.0000 12 -0.0001 0.0000 0.0016 -0.0000 -0.0000 0.0000 13 0.0000 -0.0000 0.0015 -0.0000 -0.0000 0.0000 14 0.0002 -0.0000 0.0013 -0.0000 -0.0000 0.0000 15 -0.0006 0.0000 0.0051 -0.0000 -0.0000 -0.0000 16 -0.0001 0.0000 0.0048 -0.0000 -0.0000 0.0000 17 0.0004 -0.0000 0.0046 -0.0000 -0.0000 -0.0000
- Frame Member Forces
Member # 1 Node I Node J
Axial Force = 0.0920 -0.0920 Shear Xm - Ym = -1.8712 1.8712 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 0.0000 Moment About Ym = -0.0001 0.0000
Moment About Zm = -617.5154 79.4359
Unit conversion:
Pole Absolute Resultant Moment
51.8836
(ft-kips)
Member # 2 Node I
Node J
Axial Force = 0.0920 -0.0920
Shear Xm - Ym = -0.8710 0.8710 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 0.0000 Moment About Ym = -0.0000 0.0000 Moment About Zm = -79.4359 -0.0000
Pole Absolute Resultant Moment = 6.6197 (ft-kips)
Member # 3
Axial Force = 0.1487 -0.1487
Shear Xm - Ym = 1.8704 -1.8704
Shear Xm - Zm = -0.0000 0.0000
Torsion = 0.0000 0.0000
Moment About Ym = 0.0001 -0.0000
Moment About Zm = 628.4139 -79.3340
52.7835
Member # 4
Axial Force = 0.1487 -0.1487
Shear Xm - Ym = 0.8699 -0.8699 Shear Xm - Zm = -0.0000 0.0000 Torsion = 0.0000 0.0000 Moment About Ym = 0.0000 0.0000 Moment About Zm = 79.3340 0.0000
Pole Absolute Resultant Moment = 6.6112 (ft-kips)
- Primary (Catenary) Cable Forces Primary Cable Reactions on Poles
Member Force Stress Node Fx Fy Fz
1 0.8750 7.5431 3 0.8715 -0.0066 -0.0772 2 0.8715 7.5133
3 0.8746 7.5396
4 0.8830 7.6120 7 -0.8714 0.0066 -0.1423
- Secondary (Messenger) Cable Forces Secondary Cable Reactions on Poles
1 1.0000 6.6667 2 0.9999 -0.0076 0.0000 2 1.0000 6.6667
3 1.0000 6.6667
4 1.0000 6.6667 6 -1.0000 0.0076 0.0000
- Light Member Forces
Axial Force = -0.0664 0.0664 Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = -0.0000 -0.0000 Moment About Zm = -0.0000 -0.0000
Axial Force = -0.0545 0.0545 Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = 0.0000 -0.0000 Torsion = -0.0000 0.0000 Moment About Ym = -0.0000 -0.0000 Moment About Zm = -0.0000 -0.0000
Shear Xm - Ym = 0.0000 -0.0000 Shear Xm - Zm = -0.0000 0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = 0.0000 0.0000 Moment About Zm = 0.0000 -0.0000
- Hanger (Connector) Member Forces
Axial Force = -0.0683 0.0683 Shear Xm - Ym = 0.0000 -0.0000 Shear Xm - Zm = -0.0000 0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = 0.0000 0.0000 Moment About Zm = -0.0000 0.0000
Axial Force = -0.0565 0.0565
Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = -0.0000 0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = 0.0000 0.0000 Moment About Zm = -0.0000 -0.0000
Member # 3
Node I Node J
Axial Force = -0.0569 0.0569 Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = 0.0000 -0.0000 Torsion = -0.0000 0.0000 Moment About Ym = -0.0000 -0.0000
Moment About Zm = -0.0000 -0.0000
| L O A D C O M B I N A T I O N 2 | | Dead Load Factor * [DL] + Wind Load Factor * [WL] |
| 1.10 * [DL] + 1.00 * [WL] |
| Units: Kips, Inches |
Wind Velocity Input (mph) = 140.000 Wind Angle Input (deg) = 90.000 Wind Angle Applied (deg) = 90.000
Final Coordinates
1 120.0000 972.0000 -8.4000 2 121.9460 972.0940 279.1600 3 122.9257 972.1409 370.3622 4 143.9993 971.8182 -8.4000 5 1704.0000 960.0000 -14.4000 6 1701.9797 960.2181 279.1600 7 1700.9893 960.3228 370.3622 8 1727.9993 959.8182 -14.4000 9 1016.1456 1006.7941 288.9351
10 1016.3240 1018.7909 288.7098 11 1016.6365 1053.4347 259.8571 12 1160.2990 1002.6989 289.2043 13 1160.6828 1016.3974 288.6480 14 1161.2341 1043.9846 276.1373 15 1303.4817 985.7954 298.5853 16 1304.6562 1009.3124 287.8155 17 1306.8186 1044.5427 297.4589
Factored Loads Applied to the Structure
2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3 0.0000 0.0000 -0.0164 0.0000 0.0000 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 7 0.0000 0.0000 -0.0074 0.0000 0.0000 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0845 -0.0211 0.0000 0.0000 0.0000
10 0.0000 0.0964 -0.0020 0.0000 0.0000 0.0000 11 -0.0000 0.3887 -0.0731 0.0000 0.0000 0.0000 12 0.0000 0.0234 -0.0075 0.0000 0.0000 0.0000 13 0.0000 0.0267 -0.0022 0.0000 0.0000 0.0000 14 -0.0000 0.3147 -0.0600 0.0000 0.0000 0.0000 15 0.0000 0.0446 -0.0126 0.0000 0.0000 0.0000 16 0.0000 0.0507 -0.0025 0.0000 0.0000 0.0000 17 -0.0000 0.3147 -0.0600 0.0000 0.0000 0.0000
2 1.9460 0.0940 -0.0000 -0.0005 0.0105 0.0000 3 2.9257 0.1409 -0.0001 -0.0005 0.0109 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 -2.0203 0.2181 -0.0000 -0.0011 -0.0106 0.0000 7 -3.0107 0.3228 -0.0001 -0.0012 -0.0110 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 1.0008 41.5755 -2.2249 1.6538 -0.8401 0.0000
10 1.1792 53.5723 9.5498 1.3465 -0.8378 0.0022 11 1.4917 88.2161 15.7771 0.4481 -0.8311 0.0088 12 1.0013 38.5723 -3.6704 1.5965 -0.6641 0.0000 13 1.3851 52.2709 9.4880 1.3967 -0.6626 0.0041 14 1.9364 79.8580 25.0373 0.9881 -0.6595 0.0123 15 0.2620 22.7592 -6.4669 0.9408 -0.0905 0.0000 16 1.4365 46.2762 8.6555 1.5420 -0.0950 -0.0230 17 3.5989 81.5065 46.3589 2.1936 -0.0999 -0.0480
- Frame (Pole) Member Forces
Member # 1 Node I Node J
Axial Force = 0.1119 -0.1119 Shear Xm - Ym = -8.3869 8.3869 Shear Xm - Zm = -0.4772 0.4772 Torsion = 0.0000 0.0000
Moment About Ym = 144.9205 -7.6854
Moment About Zm = -2577.4371 165.6864
Unit conversion :
215.1257
Axial Force = 0.1821 -0.1821
Shear Xm - Ym = -1.8167 1.8167 Shear Xm - Zm = -0.0843 0.0843 Torsion = 0.0000 0.0000
Moment About Ym = 7.6854 -0.0000
Moment About Zm = -165.6864 -0.0000
13.8220
Axial Force = 0.1563 -0.1563
Shear Xm - Ym = 8.3834 -8.3834 Shear Xm - Zm = -0.8741 0.8741 Torsion = 0.0000 0.0000
Moment About Ym = 265.0517 -8.4380
Moment About Zm = 2610.4251 -149.4039
218.6539
Axial Force = 0.3031 -0.3031
Shear Xm - Ym = 1.6382 -1.6382 Shear Xm - Zm = -0.0925 0.0925 Torsion = 0.0000 0.0000 Moment About Ym = 8.4380 -0.0000
Moment About Zm = 149.4039 -0.0000
Pole Absolute Resultant Moment = 12.4702 (ft-kips)
- Primary (Catenary) Cable Forces Primary Cable Forces on Poles
1 1.8395 15.8577 3 1.8305 0.0710 -0.1669 2 1.7583 15.1580
3 1.6850 14.5255
4 1.6542 14.2605 7 -1.6247 0.1041 -0.2934
- Secondary (Messenger) Cable Forces Secondary Cable Forces on Poles
1 6.5677 43.7846 2 6.5584 0.3424 0.0700 2 6.6322 44.2145
3 6.7274 44.8493
4 6.8174 45.4495 6 -6.7644 0.8358 0.1474
Rotation Angle in Y-Z Plane (Degrees) = 50.21 Rotation Angle in X-Z Plane (Degrees) = 0.62
Member # 2
Rotation Angle in Y-Z Plane (Degrees) = 65.61 Rotation Angle in X-Z Plane (Degrees) = 2.52
Member # 3
Rotation Angle in Y-Z Plane (Degrees) = 74.69 Rotation Angle in X-Z Plane (Degrees) = 12.64
- Hanger (Connector)
Member Forces
Axial Force = -0.1158 0.1158 Shear Xm - Ym = -0.0089 0.0089 Shear Xm - Zm = -24.6172 24.6172 Torsion = -9.2165 9.2165
Moment About Ym = 79.0377 216.3750 Moment About Zm = -0.0612 -0.0455
Axial Force = -0.2160 0.2160 Shear Xm - Ym = -0.0030 0.0030 Shear Xm - Zm = -7.2484 7.2484 Torsion = -1.8555 1.8555 Moment About Ym = 8.5948 90.8193 Moment About Zm = -0.0241 -0.0177
Axial Force = -0.0227 0.0227 Shear Xm - Ym = 0.0004 -0.0004 Shear Xm - Zm = 5.0902 -5.0902 Torsion = -0.2956 0.2956 Moment About Ym = 0.1389 -131.9358 Moment About Zm = -0.0006 0.0114
POLE 1 & 2 DESIGN LOAD CONDITION 3
| Analysis of Traffic Lights And Signs | | Version 7.2.0 | | Developed by : | | Bridge Software Institute | | No warranty, expressed or implied, is made by the Florida | | Department of Transportation or the University of Florida | | as to the accuracy and functioning of any programs or the | | results they produce,nor shall the fact of distribution | | constitute any such warranty, and no responsibility is | | assumed by the Florida Department of Transportation or | | the University of Florida in any connection therewith. |
| Department of Civil Engineering | | University of Florida | | Gainesville, Fl 32611 |
POLE\SP1_SP2.in
- Check the Model for Adequacy
- Problem Title
SP1_SP2.IN
- Structural Parameters :
Number of Nodes = 17 Number of Cables = 2 Lowest Point of Catenary = 24.26 ft
- Wind Data :
Wind Speed (Miles per Hour) = 140.00 Wind Direction (Angle from +ve X axis) = 90.0
- Nonlinear iteration Parameters :
Number of Iterations (Shape Finder) = 200 Number of Iterations (Gravity Solution) = 200 Number of Iterations (Wind Solution) = 200 Number of Loops for Shape Calculation = 5 Number of Cycles (Shape-Stiffness Iteration) = 1800 Force Tolerance for Gravity Solution (%) = 5.00
Y (in)
Z (in)
Tx Ty Tz Rx Ry Rz
1 120.000 972.000 -8.400 F F F F F F 2 120.000 972.000 279.160 R R R R R R 3 120.000 972.000 370.362 R R R R R R 4 143.999 971.818 -8.400 F F F F F F 5 1704.000 960.000 -14.400 F F F F F F 6 1704.000 960.000 279.160 R R R R R R 7 1704.000 960.000 370.362 R R R R R R 8 1727.999 959.818 -14.400 F F F F F F 9 1014.000 964.800 292.474 R R R R R R
10 1014.000 964.800 279.160 R R R R R R 11 1014.000 964.800 244.080 R R R R R R 12 1158.000 963.600 298.801 R R R R R R 13 1158.000 963.600 279.160 R R R R R R 14 1158.000 963.600 251.100 R R R R R R 15 1302.000 963.600 310.365 R R R R R R 16 1302.000 963.600 279.160 R R R R R R 17 1302.000 963.600 251.100 R R R R R R
1. Pole/Beam Element Data
Pole type = PVII Concrete Strength, F`c (psi) = 6000.00
NOTE : The properties used in the analysis were obtained at the effective heights of the poles and are provided below. For more information refer to the
I J K Mat Area E Properties
I33 I22 J G in^2 ksi in^4 in^4 in^4 ksi
1 1 2 4 1 222.43 4415.20 8537.91 8537.91 17075.83 1698.15 2 2 3 4 1 176.55 4415.20 4142.91 4142.91 8285.83 1698.15 3 5 6 8 1 223.12 4415.20 8640.21 8640.21 17280.42 1698.15 4 6 7 8 1 176.55 4415.20 4142.91 4142.91 8285.83 1698.15
2. Primary Cable Element Data
3. Secondary Cable Element Data
Mem I J Mat Cable Area in^2
E ksi
1 3 9 1 1 0.1500 24500.0 2 9 12 1 1 0.1500 24500.0 3 12 15 1 1 0.1500 24500.0 4 15 7 1 1 0.1500 24500.0 in^2 ksi
1 2 10 1 2 0.1500 24500.0 2 10 13 1 2 0.1500 24500.0 3 13 16 1 2 0.1500 24500.0 4 16 6 1 2 0.1500 24500.0
4. Connector Element Data
Nodes Properties Mem I J K Mat Area in^2 E ksi I33 in^4 I22 in^4
J in^4
G ksi
1 9 10 3 1 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 2 12 13 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 3 15 16 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4
5. Light Element Data
Projected area on X-Z plane = 1918.89 in^2 Projected area on Y-Z plane = 1918.89 in^2
Property Line = 2 Projected area on X-Z plane = 1553.28 in^2 Projected area on Y-Z plane = 1553.28 in^2
Light Connectivity and Properties
Nodes Properties Mem I J K Mat Area in^2 E ksi I33 in^4 I22 in^4
J in^4
G ksi
1 10 11 3 1 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 2 13 14 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 3 16 17 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4
6. Wind Load Factors
Directionality Factor = 0.85 Drag Coefficient = 0.60 for signals with backplate
3 0.00000 0.00000 -0.01940 7 0.00000 0.00000 -0.00875 9 0.00000 0.00000 -0.02437
10 0.00000 0.00000 -0.00185 11 0.00000 0.00000 -0.06644 12 0.00000 0.00000 -0.00826 13 0.00000 0.00000 -0.00201 14 0.00000 0.00000 -0.05454 15 0.00000 0.00000 -0.01417 16 0.00000 0.00000 -0.00230 17 0.00000 0.00000 -0.05454
9 0.00000 0.09650 0.00000 0.00000 0.00000 0.00000 10 0.00000 0.09638 0.00000 0.00000 0.00000 0.00000 12 0.00000 0.02676 0.00000 0.00000 0.00000 0.00000 13 0.00000 0.02674 0.00000 0.00000 0.00000 0.00000 15 0.00000 0.05086 0.00000 0.00000 0.00000 0.00000 16 0.00000 0.05070 0.00000 0.00000 0.00000 0.00000
D
E
S I G N
S E C T
I
O
N
Units: Kips, Feet |
Cable Number = 1
* Catenary Cable *
Starting Node = 3 Ending Node = 7 Cable Tension (k) = 1.854 Cable Sag (%) = 4.650 Cable Diameter (in) = 0.500 Cable Area (sq. in) = 0.150
Load Combination 2: 1.00*(DL) controls
+ 1.00*(WL)
Cable Number = 2
* Messenger Cable *
Starting Node = 2
6.900
Cable Area (sq. in) = 0.150
Load Combination 2: 1.00*(DL) + 1.00*(WL)
Load Combination 2: 1.00*(DL) + 1.00*(WL) is used for design of this pole
Pole Number = 1 Pole Node Numbers = 1 2 3 Input Pole Type = PVII Input Wind Speed (mph) = 140.000 Input Wind Angle (deg) = 90.000
Resultant Base Shear (kips) = 8.494
Resultant Base Moment (kip-ft) = 217.399 Resultant Base Moment Angle (deg) = 0.434 Pole Strong Axis Angle (deg) = 0.434 Biaxial Moment Reduction Factor = 1.000 Required Pole Phi * Mn (kip-ft) = 217.399
Input Pole Capacity (kip-ft) = 310.970
Required Embedment Length (ft) = 12.739 Minimum Embedment Length (ft) = 9.000
Pole Height Above Ground (ft) = 32.564
Load Combination 2: 1.00*(DL) +
1.00*(WL) is used
Pole Number = 2 Pole Node Numbers = 5 6 7 Input Pole Type = PVII Input Wind Speed (mph) = 140.000 Input Wind Angle (deg) = 90.000 Applied Wind Angle (deg) = 90.000
Resultant Base Shear (kips) = 8.559
Resultant Base Moment (kip-ft) = 221.298 Resultant Base Moment Angle (deg) = 0.434
Pole Strong Axis Angle (deg) = 0.434 Biaxial Moment Reduction Factor = 1.000 Required Pole Phi * Mn (kip-ft) = 221.298
Input Pole Capacity (kip-ft) = 312.862
Required Embedment Length (ft) = 12.808 Minimum Embedment Length (ft) = 9.000
Pole Height Above Ground (ft) = 33.064
| L O A D C O M B I N A T I O N 1 | | [DL] only |
| Units: Kips, Inches |
Final Coordinates
Node X Y Z
1 120.0000 972.0000 -8.4000 2 120.4926 971.9963 279.1600 3 120.7540 971.9943 370.3622 4 143.9993 971.8182 -8.4000 5 1704.0000 960.0000 -14.4000 6 1703.4844 960.0039 279.1600 7 1703.2170 960.0059 370.3622 8 1727.9993 959.8182 -14.4000 9 1015.1132 965.2188 291.1620
10 1015.1133 965.2188 279.1618 11 1015.1133 965.2188 244.0815 12 1159.2561 964.1268 293.0783 13 1159.2562 964.1268 279.1611 14 1159.2564 964.1268 251.1009 15 1303.1745 963.0366 305.2408 16 1303.1751 963.0366 279.1647 17 1303.1757 963.0365 251.1044
2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3 0.0000 0.0000 -0.0194 0.0000 0.0000 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 7 0.0000 0.0000 -0.0087 0.0000 0.0000 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0000 -0.0244 0.0000 0.0000 0.0000
10 0.0000 0.0000 -0.0019 0.0000 0.0000 0.0000 11 0.0000 0.0000 -0.0664 0.0000 0.0000 0.0000 12 0.0000 0.0000 -0.0083 0.0000 0.0000 0.0000 13 0.0000 0.0000 -0.0020 0.0000 0.0000 0.0000 14 0.0000 0.0000 -0.0545 0.0000 0.0000 0.0000 15 0.0000 0.0000 -0.0142 0.0000 0.0000 0.0000 16 0.0000 0.0000 -0.0023 0.0000 0.0000 0.0000 17 0.0000 0.0000 -0.0545 0.0000 0.0000 0.0000
2 0.4926 -0.0037 -0.0000 0.0000 0.0027 0.0000 3 0.7540 -0.0057 -0.0000 0.0000 0.0029 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 -0.5156 0.0039 -0.0000 -0.0000 -0.0028 0.0000 7 -0.7830 0.0059 -0.0001 -0.0000 -0.0030 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0001 -0.0000 0.0020 -0.0000 -0.0000 0.0000
10 0.0001 -0.0000 0.0018 -0.0000 -0.0000 0.0000 11 0.0002 -0.0000 0.0015 -0.0000 -0.0000 0.0000 12 -0.0001 0.0000 0.0013 -0.0000 -0.0000 0.0000 13 0.0000 -0.0000 0.0011 -0.0000 -0.0000 0.0000 14 0.0003 -0.0000 0.0009 -0.0000 -0.0000 -0.0000 15 -0.0007 0.0000 0.0049 -0.0000 -0.0000 0.0000 16 -0.0001 0.0000 0.0047 -0.0000 -0.0000 -0.0000 17 0.0005 -0.0000 0.0044 -0.0000 -0.0000 0.0000
Axial Force = 0.1000 -0.1000 Shear Xm - Ym = -1.9102 1.9102 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 0.0000 Moment About Ym = -0.0001 0.0000
Moment About Zm = -632.2804 82.9907
53.1420
Axial Force = 0.1000 -0.1000
Shear Xm - Ym = -0.9100 0.9100 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 0.0000 Moment About Ym = -0.0000 -0.0000 Moment About Zm = -82.9907 0.0000
Pole Absolute Resultant Moment = 6.9159 (ft-kips)
Axial Force = 0.1567 -0.1567
Shear Xm - Ym = 1.9093 -1.9093
Shear Xm - Zm = -0.0000 0.0000
Torsion = 0.0000 0.0000
Moment About Ym = 0.0001 -0.0000
Moment About Zm = 643.3644 -82.8791
54.0567
Axial Force = 0.1567 -0.1567
Shear Xm - Ym = 0.9087 -0.9087 Shear Xm - Zm = -0.0000 0.0000 Torsion = 0.0000 0.0000
Moment About Zm = 82.8791 0.0000
Pole Absolute Resultant Moment = 6.9066 (ft-kips)
1 0.9142 6.0949 3 0.9106 -0.0069 -0.0806 2 0.9106 6.0705
3 0.9137 6.0915
4 0.9225 6.1497 7 -0.9104 0.0069 -0.1482
1 1.0000 6.6667 2 0.9999 -0.0076 0.0000 2 1.0000 6.6667
3 1.0000 6.6667
4 1.0000 6.6667 6 -1.0000 0.0076 0.0000
Axial Force = -0.0664 0.0664 Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = -0.0000 0.0000 Torsion = -0.0000 0.0000 Moment About Ym = 0.0000 0.0000 Moment About Zm = -0.0000 0.0000
Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = -0.0000 0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = 0.0000 0.0000 Moment About Zm = -0.0000 -0.0000
Shear Xm - Ym = 0.0000 -0.0000 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = -0.0000 -0.0000 Moment About Zm = 0.0000 -0.0000
- Hanger (Connector) Member Forces
Axial Force = -0.0683 0.0683 Shear Xm - Ym = 0.0000 -0.0000 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = -0.0000 -0.0000 Moment About Zm = 0.0000 0.0000
Axial Force = -0.0565 0.0565
Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = -0.0000 0.0000 Torsion = 0.0000 -0.0000 Moment About Ym = 0.0000 0.0000 Moment About Zm = -0.0000 -0.0000
Member # 3
Node I Node J
Axial Force = -0.0569 0.0569 Shear Xm - Ym = -0.0000 0.0000 Shear Xm - Zm = 0.0000 -0.0000 Torsion = 0.0000 -0.0000
| L O A D C O M B I N A T I O N 2 | | Dead Load Factor * [DL] + Wind Load Factor * [WL] |
| 1.00 * [DL] + 1.00 * [WL] |
1 120.0000 972.0000 -8.4000 2 121.9652 972.0957 279.1600 3 122.9544 972.1433 370.3622 4 143.9993 971.8182 -8.4000 5 1704.0000 960.0000 -14.4000 6 1701.9601 960.2213 279.1600 7 1700.9605 960.3275 370.3622 8 1727.9993 959.8182 -14.4000 9 1016.1033 1007.0969 289.3646
10 1016.3028 1019.0939 289.1727 11 1016.6492 1053.8406 262.7871 12 1160.2318 1002.7880 289.6795 13 1160.6545 1016.6871 289.1022 14 1161.2757 1044.3121 277.8971 15 1303.3977 985.8604 299.0377 16 1304.6242 1009.5348 288.1761 17 1306.9348 1045.4686 299.3199
2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3 0.0000 0.0000 -0.0194 0.0000 0.0000 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 7 0.0000 0.0000 -0.0087 0.0000 0.0000 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0965 -0.0244 0.0000 0.0000 0.0000
10 0.0000 0.0964 -0.0019 0.0000 0.0000 0.0000 11 -0.0000 0.3887 -0.0664 0.0000 0.0000 0.0000 12 0.0000 0.0268 -0.0083 0.0000 0.0000 0.0000 13 0.0000 0.0267 -0.0020 0.0000 0.0000 0.0000 14 -0.0000 0.3147 -0.0545 0.0000 0.0000 0.0000 15 0.0000 0.0509 -0.0142 0.0000 0.0000 0.0000 16 0.0000 0.0507 -0.0023 0.0000 0.0000 0.0000 17 -0.0000 0.3147 -0.0545 0.0000 0.0000 0.0000
2 1.9652 0.0957 -0.0000 -0.0005 0.0106 0.0000 3 2.9544 0.1433 -0.0001 -0.0005 0.0110 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 -2.0399 0.2213 -0.0000 -0.0011 -0.0107 0.0000 7 -3.0395 0.3275 -0.0001 -0.0012 -0.0111 0.0000 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.9902 41.8780 -1.7954 1.6477 -1.0149 0.0000
10 1.1897 53.8751 10.0127 1.3662 -1.0128 0.0026 11 1.5360 88.6218 18.7071 0.5434 -1.0066 0.0100 12 0.9756 38.6612 -3.3976 1.5883 -0.6894 0.0000 13 1.3984 52.5603 9.9422 1.4102 -0.6880 0.0040 14 2.0196 80.1853 26.7971 1.0511 -0.6853 0.0122 15 0.2225 22.8238 -6.1982 0.9249 -0.0921 0.0000 16 1.4490 46.4982 9.0161 1.5715 -0.0970 -0.0258 17 3.7596 82.4321 48.2199 2.2673 -0.1023 -0.0536
Member # 1 Node I Node J
Axial Force = 0.1109 -0.1109 Shear Xm - Ym = -8.4726 8.4726 Shear Xm - Zm = -0.4851 0.4851 Torsion = 0.0000 0.0000
Moment About Ym = 147.2830 -7.7922
Moment About Zm = -2603.1627 166.7688
217.2772
Axial Force = 0.1853 -0.1853
Shear Xm - Ym = -1.8286 1.8286 Shear Xm - Zm = -0.0854 0.0854 Torsion = 0.0000 0.0000
Moment About Ym = 7.7922 -0.0000
Moment About Zm = -166.7688 0.0000
13.9126
Axial Force = 0.1489 -0.1489
Shear Xm - Ym = 8.4692 -8.4692 Shear Xm - Zm = -0.8877 0.8877 Torsion = 0.0000 0.0000
Moment About Ym = 269.0832 -8.4907
Moment About Zm = 2636.1878 -149.9593
220.8238
Axial Force = 0.3036 -0.3036
Shear Xm - Ym = 1.6443 -1.6443 Shear Xm - Zm = -0.0931 0.0931
Moment About Ym = 8.4907 0.0000
Moment About Zm = 149.9593 -0.0000
Pole Absolute Resultant Moment = 12.5166 (ft-kips)
1 1.8536 12.3573 3 1.8446 0.0722 -0.1673 2 1.7663 11.7757
3 1.6897 11.2650
4 1.6586 11.0576 7 -1.6293 0.1046 -0.2923
1 6.6402 44.2677 2 6.6306 0.3484 0.0742 2 6.7105 44.7368
3 6.8092 45.3949
4 6.9003 46.0020 6 -6.8460 0.8497 0.1553
Rotation Angle in Y-Z Plane (Degrees) = 52.79 Rotation Angle in X-Z Plane (Degrees) = 0.75
Member # 2
Rotation Angle in Y-Z Plane (Degrees) = 67.92 Rotation Angle in X-Z Plane (Degrees) = 3.17
Member # 3
Rotation Angle in Y-Z Plane (Degrees) = 72.77 Rotation Angle in X-Z Plane (Degrees) = 11.71
- Hanger (Connector)
Member Forces
Axial Force = -0.1100 0.1100 Shear Xm - Ym = -0.0101 0.0101 Shear Xm - Zm = -30.1285 30.1285 Torsion = -10.3302 10.3302
Moment About Ym = 119.8403 241.7083 Moment About Zm = -0.0684 -0.0527
Axial Force = -0.2178 0.2178 Shear Xm - Ym = -0.0028 0.0028 Shear Xm - Zm = -6.2974 6.2974 Torsion = -1.5509 1.5509 Moment About Ym = 7.6693 79.9746 Moment About Zm = -0.0225 -0.0170
Axial Force = -0.0192 0.0192 Shear Xm - Ym = 0.0005 -0.0005 Shear Xm - Zm = 5.3957 -5.3957 Torsion = -0.3531 0.3531 Moment About Ym = 0.1747 -140.8726 Moment About Zm = -0.0007 0.0137
POLE 2 AND POLE 3 SPAN
VERSION NUMBER 7.2.0
CONTROL
TITLE = SP2_SP3.in
MODEL = TWO
NODES = 20
CLEAR = 291.16
TOPDIST = 12.00
CABLE = 2
SPEED = 140.00
ANGLE = 90.00
STATUS = CHECK
KZFAC = 1
GUST = 1.14
DIRECT = 0.85
DEADLOADFAC = 1.10
WINLOADFAC = 1.00
COEFFFLAG = 2
DRAG = 0.75
UPLIFT = 0
CUSTOMFLAG = 0
CABLES
1 3 7 S= 5.00 W= 3.333E-05 P= 0 2 2 6 T= 1.00 W= 4.333E-05 P= 1
COORDINATE
1 X= 2.4000000E+02 Y= 9.6000000E+02 Z= 1.3200000E+01 2 X= 2.4000000E+02 Y= 9.6000000E+02 Z= 2.7916000E+02 3 X= 2.4000000E+02 Y= 9.6000000E+02 Z= 3.9076000E+02 4 X= 2.6400000E+02 Y= 9.6000000E+02 Z= 1.3200000E+01 5 X= 2.2320000E+03 Y= 9.6000000E+02 Z= -3.0000000E+01 6 X= 2.2320000E+03 Y= 9.6000000E+02 Z= 2.7916000E+02 7 X= 2.2320000E+03 Y= 9.6000000E+02 Z= 3.9076000E+02 8 X= 2.2560000E+03 Y= 9.6000000E+02 Z= -3.0000000E+01 9 X= 1.4400000E+03 Y= 9.6000000E+02 C= 1
10 X= 1.4400000E+03 Y= 9.6000000E+02 Z= 2.7916000E+02 11 X= 1.4400000E+03 Y= 9.6000000E+02 Z= 2.4408000E+02 12 X= 1.4880000E+03 Y= 9.6000000E+02 C= 1 13 X= 1.4880000E+03 Y= 9.6000000E+02 Z= 2.7916000E+02 14 X= 1.4880000E+03 Y= 9.6000000E+02 Z= 2.6416000E+02 15 X= 1.5840000E+03 Y= 9.6000000E+02 C= 1 16 X= 1.5840000E+03 Y= 9.6000000E+02 Z= 2.7916000E+02 17 X= 1.5840000E+03 Y= 9.6000000E+02 Z= 2.5110000E+02 18 X= 1.7280000E+03 Y= 9.6000000E+02 C= 1 19 X= 1.7280000E+03 Y= 9.6000000E+02 Z= 2.7916000E+02 20 X= 1.7280000E+03 Y= 9.6000000E+02 Z= 2.5110000E+02
BOUNDARY
1 DOF= f f f f f f
2 DOF= r r r r r r 3 DOF= r r r r r r 4 DOF= f f f f f f 5 DOF= f f f f f f 6 DOF= r r r r r r 7 DOF= r r r r r r 8 DOF= f f f f f f 9 DOF= r r r r r r
10 DOF= r r r r r r 11 DOF= r r r r r r 12 DOF= r r r r r r 13 DOF= r r r r r r 14 DOF= r r r r r r 15 DOF= r r r r r r 16 DOF= r r r r r r 17 DOF= r r r r r r 18 DOF= r r r r r r 19 DOF= r r r r r r 20 DOF= r r r r r r
PRIMARY
5, 1 1 A= 0.1160 E= 2.45000E+04 1 3 , 9 M= 1 C= 1 2 9, 12 M= 1 C= 1 3 12, 15 M= 1 C= 1 4 15, 18 M= 1 C= 1 5 18 , 7 M= 1 C= 1
SECONDARY
5, 1 1 A= 0.1500 E= 2.45000E+04 1 2, 10 M= 1 C= 2 2 10, 13 M= 1 C= 2 3 13, 16 M= 1 C= 2 4 16, 19 M= 1 C= 2 5 19 , 6 M= 1 C= 2
CONNECTORS
4, 3 1 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 2 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 3 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 1 9, 10, 3 M= 1 2 12, 13, 3 M= 2 3 15, 16, 3 M= 3 4 18, 19, 3 M= 3
LIGHTS
4, 3 1 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 S= 1 B= 6 P= 1.91889E+03, 1.91889E+03 2 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 S= 0 B= 0 P= 1.44000E+03, 0.00000E+00 3 A= 0.5966 E= 1.00000E+04 I= 2.84200E-01, 4.60000E-03 \\
J= 2.88800E-01 G= 3.75940E+03 S= 1 B= 6 P= 1.55328E+03, 1.55328E+03 1 10, 11, 3 M= 1 2 13, 14, 3 M= 2 3 16, 17, 3 M= 3 4 19, 20, 3 M= 3
BEAM
4, 1
1 S= 1 T= NVII X= PVII FC= 6000.0
1 1, 2, 4 M= 1 2 2, 3, 4 M= 1 3 5, 6, 8 M= 1 4 6, 7, 8 M= 1
SIGNS
9 F= 0.00000E+00, 0.00000E+00, -9.17965E-02 12 F= 0.00000E+00, 0.00000E+00, -5.70401E-02 15 F= 0.00000E+00, 0.00000E+00, -6.34756E-02 18 F= 0.00000E+00, 0.00000E+00, -7.09155E-02
WIND
9 F= 0.00000E+00, 1.01622E-01, 0.00000E+00 10 F= 0.00000E+00, 1.15879E-01, 0.00000E+00 12 F= 0.00000E+00, 1.17193E-02, 0.00000E+00 13 F= 0.00000E+00, 1.33706E-02, 0.00000E+00 15 F= 0.00000E+00, 1.95412E-02, 0.00000E+00 16 F= 0.00000E+00, 2.22844E-02, 0.00000E+00 18 F= 0.00000E+00, 5.28865E-02, 0.00000E+00 19 F= 0.00000E+00, 6.01679E-02, 0.00000E+00
LOADS
3 F= 0.00000E+00, 0.00000E+00, -2.00228E-02 7 F= 0.00000E+00, 0.00000E+00, -8.43368E-03 9 F= 0.00000E+00, 0.00000E+00, -2.30875E-02
10 F= 0.00000E+00, 0.00000E+00, -2.26446E-03 11 F= 0.00000E+00, 0.00000E+00, -6.64445E-02 12 F= 0.00000E+00, 0.00000E+00, -4.72074E-03 13 F= 0.00000E+00, 0.00000E+00, -2.31940E-03 14 F= 0.00000E+00, 0.00000E+00, -5.00000E-02 15 F= 0.00000E+00, 0.00000E+00, -6.46809E-03 16 F= 0.00000E+00, 0.00000E+00, -2.46398E-03 17 F= 0.00000E+00, 0.00000E+00, -5.45436E-02
18 F= 0.00000E+00, 0.00000E+00, -1.36043E-02 19 F= 0.00000E+00, 0.00000E+00, -2.76759E-03 20 F= 0.00000E+00, 0.00000E+00, -5.45436E-02
GENERATE
CLEAR=17.50 VELOCITY=140.0 ANGLE=90.0 STAT=2 SAG=0.050 DIFF=1.00 TOPDIST=1.00
SYSTEM
MODEL TYPE= TWO - POINT
POLES
M=1 S=1 TYPE=NVII XTYPE=PVII FC=6000.0
P=1 X=20.0 Y=80.0 Z=1.10 M=1 P=2 X=186.0 Y=80.0 Z=-2.50 M=1
WIRES
M=1 D=7,8 E=24500,24500 T=1.00
W=1 POLES=1,2 M=1
SIGNAL
M=1 R=3.00 S=1 D=12 E=W6 L=AL G=3
M=2 R=3.00 S=1 D=12 E=W6 L=AL G=4
M=3 R=3.00 N=YES A=R11 W=5.000 D=Y
S=1 X=120.0 Y=80.0 M=2 C=1 S=2 X=132.0 Y=80.0 M=1 C=1 S=3 X=144.0 Y=80.0 M=1 C=1 S=4 X=124.0 Y=80.0 M=3 C=1
GRIDDIM
G=200 D=10
DESIGN
S=2 F=0.00 W=0.600 G=50.00 P=30.00 WR=0.500
| Analysis of Traffic Lights And Signs | | Version 7.2.0 | | Developed by : | | Bridge Software Institute | | No warranty, expressed or implied, is made by the Florida | | Department of Transportation or the University of Florida | | as to the accuracy and functioning of any programs or the | | results they produce,nor shall the fact of distribution | | constitute any such warranty, and no responsibility is | | assumed by the Florida Department of Transportation or | | the University of Florida in any connection therewith. | | Department of Civil Engineering | | University of Florida | | Gainesville, Fl 32611 |
POLE\SP2_SP3.in
SP2_SP3.IN
- Structural Parameters :
Number of Nodes = 20 Number of Cables = 2 Lowest Point of Catenary = 24.26 ft
- Wind Data :
Wind Speed (Miles per Hour) = 140.00 Wind Direction (Angle from +ve X axis) = 90.0
- Nonlinear iteration Parameters :
Number of Iterations (Shape Finder) = 200 Number of Iterations (Gravity Solution) = 200 Number of Iterations (Wind Solution) = 200 Number of Loops for Shape Calculation = 5 Number of Cycles (Shape-Stiffness Iteration) = 1800 Force Tolerance for Gravity Solution (%) = 5.00
Y (in)
Z (in)
Tx Ty Tz Rx Ry Rz
1 240.000 960.000 13.200 F F F F F F 2 240.000 960.000 279.160 R R R R R R 3 240.000 960.000 390.760 R R R R R R 4 264.000 960.000 13.200 F F F F F F 5 2232.000 960.000 -30.000 F F F F F F 6 2232.000 960.000 279.160 R R R R R R 7 2232.000 960.000 390.760 R R R R R R 8 2256.000 960.000 -30.000 F F F F F F 9 1440.000 960.000 295.338 R R R R R R
10 1440.000 960.000 279.160 R R R R R R 11 1440.000 960.000 244.080 R R R R R R 12 1488.000 960.000 297.536 R R R R R R 13 1488.000 960.000 279.160 R R R R R R 14 1488.000 960.000 264.160 R R R R R R 15 1584.000 960.000 303.319 R R R R R R 16 1584.000 960.000 279.160 R R R R R R 17 1584.000 960.000 251.100 R R R R R R 18 1728.000 960.000 315.464 R R R R R R
19 1728.000 960.000 279.160 R R R R R R 20 1728.000 960.000 251.100 R R R R R R
6. Pole/Beam Element Data
Pole type = PVII Concrete Strength, F`c (psi) = 6000.00
NOTE : The properties used in the analysis were obtained at the effective heights of the poles and are provided below. For more information refer to the
I J K Mat Area E Properties
I33 I22 J G in^2 ksi in^4 in^4 in^4 ksi
1 1 2 4 1 225.23 4415.20 8661.69 8661.69 17323.39 1698.15 2 2 3 4 1 178.93 4415.20 4360.16 4360.16 8720.31 1698.15 3 5 6 8 1 230.27 4415.20 9426.82 9426.82 18853.64 1698.15 4 6 7 8 1 178.93 4415.20 4360.16 4360.16 8720.31 1698.15
7. Primary Cable Element Data
8. Secondary Cable Element Data
Mem I J Mat Cable Area in^2
E ksi
1 3 9 1 1 0.1160 24500.0 2 9 12 1 1 0.1160 24500.0 3 12 15 1 1 0.1160 24500.0 4 15 18 1 1 0.1160 24500.0 5 18 7 1 1 0.1160 24500.0 in^2 ksi
1 2 10 1 2 0.1500 24500.0 2 10 13 1 2 0.1500 24500.0 3 13 16 1 2 0.1500 24500.0 4 16 19 1 2 0.1500 24500.0 5 19 6 1 2 0.1500 24500.0
9. Connector Element Data
Number of Property Sets = 3
Nodes Properties Mem I J K Mat Area in^2 E ksi I33 in^4 I22 in^4
J in^4
G ksi
1 9 10 3 1 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 2 12 13 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 3 15 16 3 3 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 4 18 19 3 3 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4
10.Light Element Data
Projected area on X-Z plane = 1918.89 in^2 Projected area on Y-Z plane = 1918.89 in^2
Property Line = 2 Projected area on X-Z plane = 1440.00 in^2 Projected area on Y-Z plane = 0.00 in^2
Property Line = 3 Projected area on X-Z plane = 1553.28 in^2 Projected area on Y-Z plane = 1553.28 in^2
Light Connectivity and Properties
Mem I J K Mat Area E I33 I22 J G in^2 ksi in^4 in^4 in^4 ksi
1 10 11
0.5966
10000.0
0.2842
0.0046
0.2888
3759.4
2 13 14 3 2 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 3 16 17 3 3 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4 4 19 20 3 3 0.5966 10000.0 0.2842 0.0046 0.2888 3759.4
11. Wind Load Factors
Directionality Factor = 0.85 Drag Coefficient = 0.60 for signals with backplate
3 0.00000 0.00000 -0.02002 7 0.00000 0.00000 -0.00843 9 0.00000 0.00000 -0.02309
10 0.00000 0.00000 -0.00226 11 0.00000 0.00000 -0.06644 12 0.00000 0.00000 -0.00472 13 0.00000 0.00000 -0.00232 14 0.00000 0.00000 -0.05000 15 0.00000 0.00000 -0.00647 16 0.00000 0.00000 -0.00246 17 0.00000 0.00000 -0.05454 18 0.00000 0.00000 -0.01360 19 0.00000 0.00000 -0.00277 20 0.00000 0.00000 -0.05454
9 0.00000 0.10162 0.00000 0.00000 0.00000 0.00000 10 0.00000 0.11588 0.00000 0.00000 0.00000 0.00000 12 0.00000 0.01172 0.00000 0.00000 0.00000 0.00000 13 0.00000 0.01337 0.00000 0.00000 0.00000 0.00000 15 0.00000 0.01954 0.00000 0.00000 0.00000 0.00000 16 0.00000 0.02228 0.00000 0.00000 0.00000 0.00000 18 0.00000 0.05289 0.00000 0.00000 0.00000 0.00000 19 0.00000 0.06017 0.00000 0.00000 0.00000 0.00000
| D E S I G N S E C T I O N | | Units: Kips, Feet |
Cable Number = 1
* Catenary Cable *
Starting Node = 3 Ending Node = 7 Cable Tension (k) = 2.460 Cable Sag (%) = 4.528 Cable Diameter (in) = 0.438 Cable Area (sq. in) = 0.116 Cable Weight (lb/in) = 0.033 Factored Cable Resistance (k) = 9.000
Cable Size is Adequate for current Tensile Force Load Combination 2: 1.10*(DL) controls
+ 1.00*(WL)
Cable Number = 2
* Messenger Cable *
Starting Node = 2
8.506
Cable Area (sq. in) = 0.150
Load Combination 2: 1.10*(DL) + 1.00*(WL)
Pole Number = 1 Pole Node Numbers = 1 2 3 Input Pole Type = PVII Input Wind Speed (mph) = 140.000 Input Wind Angle (deg) = 90.000 Applied Wind Angle (deg) = 90.000
Resultant Base Shear (kips) = 10.419
Resultant Base Moment (kip-ft) = 253.537 Resultant Base Moment Angle (deg) = 0.000 Pole Strong Axis Angle (deg) = 0.000 Biaxial Moment Reduction Factor = 1.000 Required Pole Phi * Mn (kip-ft) = 253.537
Input Pole Capacity (kip-ft) = 310.591
Required Embedment Length (ft) = 13.588 Minimum Embedment Length (ft) = 9.000 (= 0.000 if custom pole, and requires separate check)
Pole Height Above Ground (ft) = 32.463
The Pole specified in the INPUT is adequate to support the base moment.
Load Combination 2 (LRFD Extreme Event I): 1.10*(DL) + 1.00*(WL) is used for design of this pole
Pole Number = 2 Pole Node Numbers = 5 6 7 Input Pole Type = PVII Input Wind Speed (mph) = 140.000 Input Wind Angle (deg) = 90.000 Applied Wind Angle (deg) = 90.000
Resultant Base Shear (kips) = 10.490
Resultant Base Moment (kip-ft) = 287.837 Resultant Base Moment Angle (deg) = 0.000 Pole Strong Axis Angle (deg) = 0.000
Required Pole Phi * Mn (kip-ft) = 287.837
Input Pole Capacity (kip-ft) = 324.215
Required Embedment Length (ft) = 14.031 Minimum Embedment Length (ft) = 9.000
Pole Height Above Ground (ft) = 36.063
| L O A D C O M B I N A T I O N 1 | | [DL] only | | Units: Kips, Inches |
Final Coordinates
Node X Y Z
1 240.0000 960.0000 13.2000 2 240.4744 960.0000 279.1600 3 240.8261 960.0000 390.7600 4 264.0000 960.0000 13.2000 5 2232.0000 960.0000 -30.0000 6 2231.3400 960.0000 279.1599 7 2230.9278 960.0000 390.7599 8 2256.0000 960.0000 -30.0000 9 1441.6353 960.0000 291.3454
10…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .