This is an Exhibit document for the East Campus Streetscapes Design-Build project at the Georgia Institute of Technology in Atlanta, Georgia, outlining a detailed construction implementation plan dated March 2022. The project encompasses improvements to multiple streetscapes and infrastructure elements across the East Campus, including cycletrack and ADA implementation on 3rd Street (north side along Techwood Drive), 4th Street (both north and south sides), and 6th Street. The scope includes specific work on both east and west sides of 3rd Street from Bobby Dodd Way to 5th Street, with a low-cost striping and resurfacing option from Bobby Dodd Way to North Avenue, as well as improvements from 5th to 6th Street. Additional work includes ADA parking improvements at the Peters Deck stadium entry/exit at the lower level and surface parking enhancements. The document provides a draft construction sequence and identifies distinct project phases and components labeled A through C with multiple sub-sections addressing access, safety, and connectivity improvements.
The document specifies location-based construction phases organized by street segments and directional sides, with component breakdowns that separate distinct work areas and implementation priorities. The plan indicates a comprehensive approach to campus pedestrian and vehicular infrastructure upgrades, including dedicated bicycle facilities through cycletrack implementation and ADA compliance improvements across multiple campus corridors. The organization by street segments and component codes suggests a phased construction approach designed to manage impacts across the busy academic campus while prioritizing accessibility and multimodal transportation connectivity.
Text of this file
East Campus Streetscapes - Access, Safety and Connectivity Construction Implementation Plan 03.2022
3rd Street North Side
Techwood Drive Cycletrack/ADA Implementation Plan
1. East Side - Bobby Dodd Way(BDW) to 5th St including low cost option for striping/resurfacing from BDW to North Ave
| 2. | West side - BDW to 5th |
| 3. | Both sides 5th to 6th St. |
| 4. | East side of North Ave to southern end of North |
Ave apartments
4th Street - South Side
Fowler St South
Brittain Dr
4th Street - North Side
Fowler Street
6th Street
A
Improve deck entry/exit, provide ADA parking for Stadium at lower level of Peters Deck
Improve surface parking
B.2
C.3
B.1
B.3
B.4
C.1
C.2
C.4
C.4
Draft Construction Sequence
N
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Exhibit H | — | |
| Exhibit D | — | |
| GIT BR-30-2205 Addendum No. 2 | — | |
| Exhibit F | — | |
| GIT BR-30-2205 DB RFQ-RFP | — | |
| Exhibit E | — | |
| Exhibit A | — | |
| Exhibit C | — | |
| Egnyte Upload Instructions | — | |
| Exhibit B | — | |
| GIT BR-30-2205 Addendum No. 1 | — | |
| GIT BR-30-2205 Addendum No. 3 | — | |
| Exhibit G | — |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .