Exhibit H - Future Phase 6.pdf
PDF 1 MB Posted
- Solicitation number
- S-KR1079-00012291
- Issued by
- Douglas County, Oregon
About this file
This is an engineering exhibit (Exhibit H) showing a map and planned infrastructure project details for what appears to be a water main installation in Roseburg, Oregon. The map details a "Future Phase 6" estimated alignment for a 24" D.I. (ductile iron) water main with an estimated length of 3,000 linear feet. The map shows existing infrastructure including a 24" D.I. main installed in 2020 and a 24" O.D. line from circa 1955 that is marked to be abandoned.
The map covers an area around NE Winchester Street/Highway 99, including several cross streets such as NE Post Street, NE Alder Street, and NE Stephens Street. Notable landmarks shown include Reservoir Hill and various commercial properties. The drawing is marked as "Not part of Contract" and includes precise engineering details with coordinate points (CS####) throughout the mapped area. The scale is 1:5,000 and includes standard mapping attribution to sources like USGS, NASA, and other geographic data providers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WA-25-01 - Notice of Intent to Award.pdf | ||
| Exhibit G - Phase 5 Design.pdf | ||
| WA-25-01 RFQ Opening Results.pdf | ||
| WA-25-01 RFQ ENGINEERING - DMA.pdf | ||
| Attch A-I~1.pdf | ||
| Exhibit F - Phase 4 Design.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N E G ar de n Va lle y Bl vd
NE Walnut St
N E Ch es tn ut
Av e
NE Grandview Dr
N E H untley
St
NE Crescent Aly
NE Post St
NE Post St NE Alder St
Inn Square Putting Green
Clint Newell Toyota
Cricket Wireless
China Buffet
Sonic Rogue Bank -
ATM
Walgreens
NAPA Auto Parts
Coastal Farm and Ranch Supply
BottleDrop Redemption
Center
North Roseburg Plaza
726 ft
NE
Winc hes ter St
CS0016
CS0018
CS0024
CS0038
CS0039
CS0041
CS0302
CS0517
CS0519
CS0520
CS0521
CS0568
CS0571
CS0909
CS1161
CS1216
CS1274
CS1286
CS1408
CS1409
CS1506
CS1520
CS1540
CS1678
CS1682
NE CRESCENT ST
NE BELLVIEW CT
N E
IM
B
L E
R A
V E
N E
N E
U N
E R
D R
N E
D
IX
O N
A V
E
N E
H U
N
TL
EY
A
VE
N E
W E
S T
A V
E
N E
W A
R D
A V
ENE POST ST
N E
B A
R N
E S
A V
E
NE CRESCENT ALY
NE ALDER ST
N E
G R
A N
D V
IE
W
D R
N E
C H
E S
T N
U T
A V
E
NE WALNUT ST
N E
G A
R D
E N
V A
LL
E
Y B
LV
D
NE VINE ST
NE WINCHESTER ST
NE STEPHENS ST99
Engineering
Sources: Esri, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, 5/7/2024 0 0.06 0.120.03 mi
0 0.1 0.190.05 km
1:5,000 danderson Text Box Future Phase 6 - Estimated Alignment (Not part of Contract) danderson Text Box Exhibit "H" danderson PolyLine danderson Text Box Begin Phase 6 danderson Text Box End Phase 6 danderson Line danderson Line danderson Text Box Reservoir Hill danderson Callout 24" O.D.
Circa 1955 (to be abandoned) danderson Callout Future Route Phase 6 Estimated Alignment 24" D.I.
(L=3,000 LF Est.)
danderson Callout 24" D.I.
Installed 2020
File details come from the government source that posted it. Updated .