Exhibit G - Phase 5 Design.pdf
PDF 642 KB Posted
- Solicitation number
- S-KR1079-00012291
- Issued by
- Douglas County, Oregon
About this file
This is an engineering exhibit map labeled "Exhibit G" showing Phase 5 Design Phase of what appears to be a water infrastructure project. The map details various water main components including a 30-inch main, a 20-inch O.D. steel main to be abandoned, and a Phase 5 Route featuring a 24" D.I. pipeline with an estimated length of 3,000 LF. The project area encompasses several streets and commercial areas in what appears to be Roseburg, including NE Airport Road, NE Vine Street, and surrounding areas.
The map is presented at a 1:6,000 scale and includes aerial imagery overlaid with utility infrastructure markings, street names, and business locations such as Safeway, Lithia dealerships, and various other retail establishments. The planned work appears to be part of a larger infrastructure improvement project, with specific notes indicating the end of the 20-inch O.D. Steel Main at Dee Street & Garden Valley Blvd, and showing the Phase 5 route's path through the commercial district. The map is dated 5/7/2024 and includes standard mapping attribution to sources such as Esri, USGS, NASA, and others.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WA-25-01 - Notice of Intent to Award.pdf | ||
| WA-25-01 RFQ Opening Results.pdf | ||
| Exhibit H - Future Phase 6.pdf | ||
| WA-25-01 RFQ ENGINEERING - DMA.pdf | ||
| Attch A-I~1.pdf | ||
| Exhibit F - Phase 4 Design.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Southern Pacific Railroad
NE Airport Rd
NW Fairmount St
NW Park St
567 ft
NE Vine St
NE Airport Rd
N E A lam eda A ve
N E Roseland
A ve
N E C hannon
A ve
N E C hannon
A ve
N E St ew ar t Pk w y
Mobil
Lithia Chrysler Jeep Dodge of
Roseburg
Lithia Ford Lincoln of Roseburg
Safeway
NE Vine St
NE Willow St
NE Dee St
N E Ai rp ort
Rd
N E O akland
A ve
Clint Newell Toyota
Safeway Fuel Station
Java Run
Cricket Wireless
Rogue Bank -
ATM
Walgreens
NAPA Auto Parts
Engineering
Sources: Esri, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, 5/7/2024 0 0.04 0.090.02 mi
0 0.07 0.150.04 km
1:6,000 danderson Line danderson Line danderson Text Box Phase 5 - Design Phase danderson Text Box Exhibit "G" danderson Callout Phase 5 Route 24" D.I.
(L=3,000 LF Est.)
danderson PolyLine danderson Text Box End Phase 5 danderson Text Box Approx.
Begin Phase 5 danderson Callout End of 20-inch O.D. Steel Main Dee Street & Garden Valley Blvd danderson Callout 20-inch O.D. Stl to be abandoned danderson Callout 30-inch Main
File details come from the government source that posted it. Updated .