Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf
PDF 172 KB Posted
- Solicitation number
- RFP-10060
- Issued by
- Volusia County, Florida
About this file
This document is a General Order and Timetable & Special Instructions No. 2 from the Florida Department of Transportation (FDOT) related to the Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations project. The order outlines physical characteristic changes and additions to the CFRC including changes to crossovers, signals, and switch machines between mileposts 806.2 and 807.0. It also includes timetable changes and instructions related to restricted equipment movements on the CFRC. The related state and local contract opportunity seeks technical and price proposals for the CFRC Track Improvements - Multiple Locations contract. The solicitation has a mandatory pre-proposal meeting on September 4, 2024, and proposals are due by October 2, 2024. The contract is for CFRC track improvements at multiple locations, as described in the General Order.
The contract opportunity does not provide specific pricing terms, set asides, or funding details. It notes that the solicitation is subject to change, and vendors must monitor the Vendor Information Portal for any addendums. All bidders must be registered in MyFloridaMarketplace and properly licensed if the work requires it. The contract will be subject to the 1% MFMP Transaction Fee unless exempt.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Florida Department of Transportation
Exhibit “H”
CFRC General Orders and Notices – Timetable and Special Instructions No. 2 and General Order No. 6
Central Florida Rail Corridor (CFRC) Track Improvements
– Multiple Locations
Financial Projects Number(s): 412994-4-52-33, 412994-8- 82-54, 412994-8-82-55, 412994-8-82-56, 412994-8-82-47
DOT-RFP-25-5002-TIML
CFRC GENERAL ORDER NO. 6 TTSI #2
EFFECTIVE 0001 HOURS JULY 20, 2024
002 ITEMS
CENTRAL FLORIDA RAIL CORRIDOR (CFRC) GENERAL
ORDERS AND NOTICES
TIMETABLE AND SPECIAL INSTRUCTIONS NO. 2
GENERAL ORDER NO. 6
TO: T&E CREWS AND ALL CONCERNED
LOCATION: CENTRAL FLORIDA RAIL CORRIDOR
SUBJECT: CFRC PHYSICAL CHARACTERISTIC CHANGES AND ADDITIONS
EFFECTIVE: 0001 HOURS, JULY 20, 2024
ITEM 1 – CFRC PHYSICAL CHARACTERISTIC CHANGES AND ADDITIONS BETWEEN CP NORTH
KISSIMMEE AND CP MIDDLE KISSIMMEE
1. CP NORTH KISSIMMEE MP 806.2 HAS BEEN CHANGED FROM A SINGLE CROSSOVER TO A
DOUBLE TRACK UNIVERSAL CROSSOVER
2. NEW ABSOLUTE SIGNALS PLACED INTO SERVICE AS FOLLOWS:
A. NEW THREE (3) ASPECT ABSOLUTE SIGNALS PLACED IN SERVICE FOR NORTHWARD
MOVEMENTS THRU CP NORTH KISSIMMEE ON THE #1 AT MP 806.20 AND #2 TRACK AT MP
806.20
B. NEW THREE (3) ASPECT ABSOLUTE SIGNALS PLACED IN SERVICE FOR SOUTHWARD
MOVEMENTS THRU CP NORTH KISSIMMEE ON THE #1 AND #2 TRACKS AT MP 806.00
3. CP NE. KISSIMMEE TURNOUT SWITCH MACHINE IS REMOVED FROM SERVICE
A. THE CURRENT POWER OPERATED SWITCH MACHINE AT CP NE. KISSIMMEE IS REMOVED
FROM SERVICE AT MP 806.10 AND REPLACED WITH A UNIVERSAL CROSSOVER SWITCH
MACHINE.
4. NEW CP NORTH KISSIMMEE MP 806.2 POWER OPERATED SWITCH MACHINE CROSSOVER IS
PLACED INTO SERVICE AS FOLLOWS:
A. SWITCH MACHINES THROUGH CP NORTH KISSIMMEE ARE PLACED IN SERVICE ON TRACK #1
MP 806.01 AND TRACK #2 MP 806.09
B. SWITCH MACHINES THROUGH CP NORTH KISSIMMEE ARE PLACED IN SERVICE ON TRACK #2
MP 806.11 AND TRACK #1 MP 806.19
ITEM 2 – TIMETABLE CHANGES
1. IN CFRC TIMETABLE AND SPECIAL INSTRUCTIONS NO. 2, PAGE 9, REPLACE THE EXISTING MAP
WITH THE FOLLOWING:
002 ITEMS
TRACK DIAGRAM
SOUTH
P F
50 50
MAITLAND CP
CTC
786.99 SOUTH WINTER PARK CP
CTC
FLORIDA HOSPITAL CP 3. Northbound Signal Only.
NORTH ORLANDO CP
SOUTH ORLANDO CP
SAND LAKE CP
0.2 CTC
TOFC CP
1.4 CTC
NE TAFT CP
0.7 CTC
MIDDLE TAFT CP
NE STANTON CP
SE STANTON CP
NE KISSIMMEE CP
CP
CENTRAL FLORIDA RAIL CORRIDOR
AUTHORIZED SPEED -
REFER TO SPEED
TABLES
MILE POST STATION
AUTH FOR
MOVE
NOTES
CTC
40 40
1.9 CTC
40 40
WINTER PARK
0.7 CTC
3.3 CTC
5.6
MIDDLE ORLANDO CP
3.4
CTC
CTC
1.3
CTC
CTC
4. CP Middle Taft on Main
Track 1 Only
70 0.9 CTC
CTC
CTC
1.5
CTC
0.9
CTC
1 2
1 2
1 23
1 2
1 2
1 2
DD DD
FCEN 790.1
CSXT
KALEY YARD
CSXT
TAFT YARD
SEXTON
SPUR
AIRPORT
SPUR
782.0
782.8
784.3
784.7
787.8
791.1
791.8
793.1
793.6
795.5
796.5
796.7
798.1
798.8
799.3
799.7
799.8
800.6
802.8
806.2
807.0
RC
BRANCH
STANTON
SPUR
STANTON
TYPE 1
801.0
802.2
803.8
TDSI LEAD
002 ITEMS
2. ON PAGE 13 OF CFRC TIMETABLE AND SPECIAL INSTRUCTIONS NO. 2 ADD THE FOLLOWING TO THE
INSTRUCTIONS RELATING TO RESTRICTED EQUIPMENT:
1) MOVEMENTS OF EQUIPMENT ON THE CFRC CORRIDOR WITH DIMENSIONS EXCEEDING AAR
PLATE F ARE NOT PERMITTED WITHOUT WRITTEN INSTRUCTIONS ISSUED BY THE DISPATCHER
AND RAILROAD BRIDGE ENGINEER PRIOR TO MOVEMENT. DOUBLE STACK AND MULTI-LEVEL
MOVEMENTS WITH A 20’-2” MAXIMUM HEIGHT ARE PERMITTED ON MAIN TRACK AND SIDINGS.
2) MOVEMENTS OF 286,000 LB EQUIPMENT WITH 4 AXLES OR MORE AND WITH COUPLED
LENGTHS LESS THAN 45’-8 ½” REQUIRE AUTHORIZATION BY THE DISPATCHER AND THE
RAILROAD BRIDGE ENGINEER PRIOR TO MOVEMENT.
ISSUED BY CHIEF TRANSPORTATION OFFICER JEFF GILPIN
ALSTOM – SUNRAIL OPERATIONS, SANFORD FL
File details come from the government source that posted it. Updated .