About this file

This is a Duke Energy Commercial/Industrial Service Information Form completed for the City of Clearwater in support of design-build services for a standby generator at Clearwater Executive Airport's CNG station. The form documents electrical service requirements for a new general terminal facility at 1000 N. Hercules Ave., Clearwater, FL 33765. The airpark terminal will operate 16 hours per day, 7 days per week, with a two-story building footprint of 18,000 square feet served by a single meter. The facility requires a 1,000-amp main electrical panel with underground service entrance, 400 kcmil secondary and neutral conductors with three conductor sets per phase, and will be supplied with 480/277-volt, four-wire, three-phase power.

The load sizing information indicates total connected demand of 297 kilowatts with a total demand kW of 278. Primary electrical loads include air conditioning and heat pump capacity of 70 tons (largest three-phase unit rated at 20 tons), lighting at 54 kilowatts, miscellaneous loads at 150 kilowatts, receptacles at 58.7 kilowatts, water heating at 9 kilowatts, and a 20-horsepower elevator. The permanent power date and specific customer billing contacts remain to be determined (TBD), as are the general contractor and electrician information. Completed form submission is directed to Duke Energy's Service Planning and Project Coordination department at Sppc@Duke-Energy.com.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMERCIAL / INDUSTRIAL SERVICE INFORMATION FORM

Before Duke Energy can proceed with your project design application for new construction service is required. Please provide the necessary billing and design information on this form. Please contact Builders Line to apply for service. If you have any questions please visit the Duke Energy website https://www.duke-energy.com/partner-with-us/builders-developers-and-contractors

LOGISTICAL CUSTOMER INFORMATION

o New o Existing If existing please provide Duke Energy Account number:_________________________________________

Service Address where work is being performed

Type of Business to be served

Hours of Operation Per Day:_____________________ Per Week:_________________________ Per Month:_______________________

Property Owner Contact Info (the owner listed on the Deed to the Property)

Property owner name (company name or customer name):

Property owner address

Property owner phone number Property owner email Address:

Customer Who Will Receive Invoice for Construction charges. (if applicable) Check o if same as Property Owner

Customer’s name (company name or customer name)

Customer’s address

Customer’s phone number Customer’s email Address:

Customer Who Will Receive the Monthly Bill for Electric Service. Check o if same as Property Owner

Customer’s name (company name or customer name)

Customer’s address

Customer’s phone number Customer’s email Address:

General Contractor’s Name

General Contractor’s phone number

General Contractor’s email address

Electrician’s Name

Electrician’s phone number

Electrician’s email address

Previous service address

KENW

Text Box X

LOAD SIZING INFORMATION

IMPORTANT! Site plan with legal description, civil plans, mechanical and electrical panel schedules may be required by engineering.

Duke Energy Exterior Area Lighting Proposal Requested: o Yes o No

Voltage Requirements and Load Information:

o 120/240 volt – 3 wire, single phase o 480/277volt – 4 wire, 3 phase o 208/120 volt – 4 wire, 3 phase o Other (Please Specify) :___________________________________

Please remember to list any other phase or voltage requirements such as elevators, lift station, pumps.

Largest 1 Phase 3 Phase Total kW (Tons/HP)

Total Demand kW

*A/C or Heat Pump (Tons)

Heat Strip

Lighting

Refrigeration

Water Heating

Cooking

Miscellaneous

Receptacles

Larger motors may require starting compensation

List of Motors (Horsepower and Description):

Total Connected kW:_____________________________________ Total Demand kW:_____________________________________

Building Sq Ft: __________________________ # of Units:_ ______________ Perm Power Date:________________________

Size of Main (Panel Size): __________________ # of Meters: _____________ # of Stories: ____________________________

Secondary Conductor Size: _ __________ AL ________ CU __________ Bldg Service Entrance: OH ________ UG_______

Neutral Conductor Size: ______________ AL ________ CU __________ # of Conductors per phase (Sets/Runs)_________

Remarks:

Customer Owned Generation such as Solar Panels? Please Provide information:

©2017 Duke Energy Corporation 172660 12/17

Please return completed form via email to Sppc@Duke-Energy.com. For questions, contact sppc@Duke-Energy.com.

KENW

Text Box X

KENW

Text Box X

KENW

Text Box 20 hp - elevator

If existing please provide Duke Energy Account number:
Service Address where work is being performed: 1000 N. Hercules Ave., Clearwater, FL 33765
Type of Business to be served: Airpark General Terminal for Clearwater Airpark
Hours of Operation Per Day: 16
Per Week: 7
Per Month: 30
Property owner name company name or customer name: City of Clearwater
Property owner address:
Property owner phone number:
Property owner email Address:
Customers name company name or customer name: TBD
Customers address:
Customers phone number:
Customers email Address:
Customers name company name or customer name_2: TBD
Customers address_2:
Customers phone number_2:
Customers email Address_2:
Previous service address:
General Contractors Name: TBD
Electricians Name: TBD
General Contractors phone number:
Electricians phone number:
General Contractors email address:
Electricians email address:
Other Please Specify:
LargestAC or Heat Pump Tons: 20 tons
1 PhaseAC or Heat Pump Tons:
3 PhaseAC or Heat Pump Tons: 20 tons
Total kW TonsHPAC or Heat Pump Tons: 70 tons
Total Demand kWAC or Heat Pump Tons:
LargestHeat Strip:
1 PhaseHeat Strip:
3 PhaseHeat Strip:
Total kW TonsHPHeat Strip:
Total Demand kWHeat Strip: 0
LargestLighting:
1 PhaseLighting:
3 PhaseLighting:
Total kW TonsHPLighting:
Total Demand kWLighting: 54 Kw
LargestRefrigeration:
1 PhaseRefrigeration:
3 PhaseRefrigeration:
Total kW TonsHPRefrigeration:
Total Demand kWRefrigeration: 0
LargestWater Heating:
1 PhaseWater Heating:
3 PhaseWater Heating:
Total kW TonsHPWater Heating:
Total Demand kWWater Heating: 9 kw
LargestCooking:
1 PhaseCooking:
3 PhaseCooking:
Total kW TonsHPCooking:
Total Demand kWCooking: 0
LargestMiscellaneous:
1 PhaseMiscellaneous:
3 PhaseMiscellaneous:
Total kW TonsHPMiscellaneous:
Total Demand kWMiscellaneous: 150 kw
LargestReceptacles:
1 PhaseReceptacles:
3 PhaseReceptacles:
Total kW TonsHPReceptacles:
Total Demand kWReceptacles: 58.7 kw
Total Connected kW: 297
Total Demand kW: 278
Building Sq Ft: 18,000
of Units: 1
Perm Power Date:
Size of Main Panel Size: 1000 amps
of Meters: 1
of Stories: 2
Secondary Conductor Size: 400 kcmil
AL:
CU: X
Bldg Service Entrance OH:
UG: X
Neutral Conductor Size: 400 kcmil
AL_2:
CU_2: X
of Conductors per phase SetsRuns: 3