Exhibit_E_Airpark_General_Terminal_Site_Plan_(1).pdf
PDF 2 MB Posted
- Solicitation number
- 59-26
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a site plan document for the City of Clearwater's design-build project involving a standby generator installation at Clearwater Executive Airport's CNG Station. The document is labeled as a progress submittal not for construction and includes a general terminal site plan for the airpark. The plan appears to be in an early phase of development, as indicated by the "progress submittal" notation and the sticky note indicating a proposed tentative location for the generator installation. The site plan provides the spatial layout and positioning context necessary for the design-build teams to understand the physical constraints and requirements of the airport facility where the CNG-powered standby emergency generator will be installed.
The document serves as a reference exhibit for qualified design-build teams responding to the City of Clearwater's request for proposals. This site plan is essential for bidders to visualize the project location, understand site conditions, and develop appropriate solutions for the selection, purchase, and installation of the compressed natural gas generator system. As a progress submittal, this plan reflects preliminary design considerations and is intended to guide respondents in their technical proposals and cost estimates for this infrastructure improvement project at the airport facility.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR
O
G R
ES
S
SU
BM
IT
TA
L N
O T
FO
R
C O
N
ST
R U
C
TI
O N
Kelly Peterich Sticky Note Proposed tentative location
File details come from the government source that posted it. Updated .