This is a Cost Proposal Matrix for the Fulton Street Parking Deck project (Project No. BR-50-2202) at Georgia State University in Atlanta, Georgia. The matrix serves as a guide for contractors to prepare cost proposals and identifies where the Owner wishes to allocate costs across three primary cost categories: Construction Fee, General Conditions, and Cost of Work By Others. The document outlines detailed cost allocation expectations across seven major categories: Site Supervision & Management, Site Office Expense, Safety & Security, Cleaning, General Equipment, Bonds & Insurance, and Miscellaneous expenses.

The matrix indicates a projected fee of $1,231,000 based on a $46 Million Guaranteed Maximum Price (GMP). Specific cost allocations are designated with "X" marks, dollar amounts, "NA" (not applicable), or "Incl." (included elsewhere) notations. Notable allocations include $30,000 for Safety Engineer general conditions and $1,231,000 for Builders Risk Insurance. Many line items are marked for inclusion in the Construction Fee category, including personnel costs (Project Executive, Senior Project Manager, Project Manager, Project Superintendent, and supporting staff), office expenses, equipment, and miscellaneous project costs. The matrix provides contractors with a structured framework to ensure costs are properly categorized and allocated according to the Owner's requirements for this design-build project.

Text of this file

Cost Proposal Matrix

PROJECT COST MATRIX
The spaces marked with an "X" below indicate where the Owner wishes to allocate costs for the project. Please follow this as a guide in preparing your cost proposal for the project.
Project No. BR-50-2202, Fulton Street Parking Deck
Georgia State University, Atlanta, Georgia
I. Site Supervision & Management:Construction FeeGeneral ConditionsCost of WorkBy Others
Project ExecutiveX
Corporate ExecutivesX
Legal ServicesX
Senior Project Mgr.X$0$00$0
Project Mgr.X$0$00$0
Project Supt.X$0$00$0
Asst. Project Supt.X$0$00$0
Area Supt.XNA
SecretaryX$0$00$0
Project EngineerX$0$00$0
Engineer or Eng. CompanyX$0$0
Cost ControlX$0$0
Safety EngineerX0$30,000
SchedulingX$0$00$0
PurchasingX0$0
Project AccountantXIncl.
RodmanXIncl.
$0$00$0
II. Site Office Expense:Construction FeeGeneral ConditionsCost of WorkBy Others
Job Office Trailer RentXNA
Office Jobsite Build OutX$0$00$0
Office Jobsite Set-upX$0$00$0
Temp. Const. Trailer/StorageXNA
Office FurnitureXIncl. Below
Office Machines/Equip.X$0$00$0
Copy Machines/MaintenanceXIncl. Above
Office SuppliesX$0$00$0
Janitor/San. SuppliesX$0$0
Postage & ShippingX$0$00$0
First Aid/Med. Treat.X$0$0
Telephone SystemX$0$00$0
Phone InstallationX0$0
Phone ChargesX0$0
Phone Charges-Long Dist.XBy Arch.
Radio CommunicationsX$0$00$0
Radio MaintenanceXIncl.
Computer-PCSX$0$00$0
ComputersXIncl.
SoftwareX$0$00$0
MIS ChargesX0$0
Temp. Electric-OfficeX
Security-OfficeX
Water - Field OfficeX
0$0
III. Safety & Security:Construction FeeGeneral ConditionsCost of WorkBy Others
Safety IncentivesXNA
Watchman/Guard Ser.X0$0
Traffic ControlX$0$00$0
Safety EquipmentX$0$00$0
Rainwear/Hardhats, etc.X0$0
Drug TestingX$0$00$0
Fences & GatesX0$0
Fire Protection, Extinquishers, BarrelsX0$0
Covered WalkwaysX0$0
Roadway MaintenanceX$0$0
Sidewalk BarricadesX$0$0
Safety RailingsX$0$0
Opening ClosuresX
Weather ProtectionX
Ladders & StailrsX
IV. Cleaning:Construction FeeGeneral ConditionsCost of WorkBy Others
Trash Bin Rent/HaulXIncl.
Trash Chutes/HoppersX$0$00$0
Dump Fees/HaulingX$00$0
Dust BarricadesX0$0
Daily CleaningX
Final Cleanup-BuildingX
Window/Skylight CleaningX
$00$0
V. General Equipment:Construction FeeGeneral ConditionsCost of WorkBy Others$00$0
Small Tools/ExpendablesX$0$00$0
Survey EquipmentXIncl.
Hoist/OperatorX0$0
Hoist ServiceX$0$00$0
Erect/Dismantle HoistX0$0
Temp. Elev. & OperatorX$00$0
Rapair Cab/Temp. Elev.X$00$0
Protect Perm. ElevatorX
Fuel/Oil/GreaseX
Forklift RentalX
Contractor Equipment LicenseX
Contractor Equipment PermitsX
Tower Crane ServiceX
Erect/Dismantle CraneX
Crane Rental/OperatorX
Construction EquipmentX
VI. Bonds & Insurance:Construction FeeGeneral ConditionsCost of WorkBy Others
Perform. & Payment BondsX
Workers Comp. InsuranceX
Liability InsuranceX
Fed. & State UnemploymentX
FICAX
Builders Risk InsuranceX
$1,231,000
Projected Fee (Based on $46 Million GMP)ERROR:#REF!
Builders Risk InsuranceX
VII. Miscellaneous:Construction FeeGeneral ConditionsCost of WorkBy Others
CM General Overhead CostX
CM Profit MarginX
Costs Over GMPX
Project Staff Living ExpensesX
Executive TravelX
Air FareX
Car RentalX
HotelX
MealsX
Project Staff Moving ExpensesX
Warranty WorkX
Off-Site ParkingX
Ceremony ExpenseX
Vehicle for On-Site Project ManagerX
Vehicle for On-Site SuperintendentX
Vehicle Repairs/MaintenanceX
Water - CoolersX
Water BarrelsX
Ice MachineX
Ice and/or CupsX
Temporary Toilets InstallX
Temporary ToiletsX
Cold Weather ProtectionX
Temp. Heat for Bldg.X
Job SignsX
Progress PhotosX
Extra Plans & Specs.X
Blueprint/Photostat.X
Temp. Electric -BuildingX
Building PermitX
Plan Check FeesX
Temporary RoadsX
Project TaxesX
Moving Coordination & Costs for ProjectX
Materials Incorporated Into the BuildingX
Corrective WorkX
Punchlist WorkX
Advertising for BidsX
Soils Testing & InvestigationX
Construction Materials TestingX0$0
Special InspectionsX
Water Connection FeesX
Sanitary Connection FeesX
Storm Connection FeesX
Gas Service FeesX
Power Service FeesX
Impact FeeX

&"Arial,Bold"&16&UAttachment A

&D &T &P

Sheet2

Sheet3

Other files

File Type Posted
Egnyte Upload Instructions —
Exhibit H —
Exhibit D —
GSU BR-50-2202-DB RFQ-RFP —
Exhibit E —
Exhibit C —
GSU BR-50-2202-DB Addendum #2 —
Award Information —
Exhibit G —
Exhibit A —
Exhibit B —
GSU BR-50-2202-DB Addendum #1 —
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .