Exhibit C
24 KB Posted
- Attached to
- Fulton Street Parking Deck
- Solicitation number
- BR-50-2202-DB
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
This is a Design Builder Fee Proposal exhibit for Project No. BR-66-1701, the Public Safety Building Renovation & Expansion at Georgia Southern University. The document establishes the fee structure for design-build services, which encompasses comprehensive design and construction administration services. The proposal organizes compensation into three primary categories: a Design Consultants Fee for basic design services and construction administration, a Preconstruction Fee representing gross profit for pre-construction consulting services, and a Construction Fee representing gross profit for construction services. All fees are established as fixed amounts agreed upon by both the Design Builder and the Owner, with the Design Builder obligated to perform all contract requirements within established time limits.
The fee proposal requires the Design Builder to specify maximum allowable overhead costs and expenses in two categories: Pre-construction Costs & Expenses and Construction Overhead Costs, each detailed in separate attachments. These overhead amounts are inclusive of all direct and incidental expenses and represent the upper limits the Design Builder may charge beyond the three primary fees. The proposal structure ensures transparent cost segregation between professional fees, profit margins, and reimbursable expenses, allowing the Owner to clearly understand the total financial commitment for design-build services on the project.
Text of this file
15 of Exhibit C
Project No. BR-66-1701, Public Safety Building Renovation & Expansion Georgia Southern University
DESIGN BUILDER (DB) FEE PROPOSAL
1. DB’S FEE:
Basis of Fee. The DB’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.
A. DESIGN CONSULTANTS FEE:
Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:
TOTAL
Design Fee (fixed fee)
B. PRECONSTRUCTION FEE:
Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to DB a Preconstruction Fee:
TOTAL
Pre-Construction Fee (fixed fee)
C. CONSTRUCTION FEE:
Construction Fee. Representing the gross profit for the construction services provided by DB as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to DB a Construction Fee.
TOTAL
Construction Fee (fixed fee)
2. DB’S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:
The DB’s Overhead Costs. The maximum amount for the DB’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .
AMOUNT
A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)
B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)
Total Maximum Overhead Cost (Sum of A & B)
DB Firm Name
By:__________________________________________________________ Signature of DB Officer
Title of DB Officer
Other files
| File | Type | Posted |
|---|---|---|
| Egnyte Upload Instructions | — | |
| Exhibit H | — | |
| Exhibit F | — | |
| Exhibit D | — | |
| GSU BR-50-2202-DB RFQ-RFP | — | |
| Exhibit E | — | |
| GSU BR-50-2202-DB Addendum #2 | — | |
| Award Information | — | |
| Exhibit G | — | |
| Exhibit A | — | |
| Exhibit B | — | |
| GSU BR-50-2202-DB Addendum #1 | — |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .