This document is an Underground Storage Tank (UST) Interior Lining Inspection Report issued by the Arizona Department of Environmental Quality (ADEQ), located in Phoenix, Arizona. The form is a comprehensive inspection checklist designed to document the assessment, preparation, and post-installation review of underground storage tank interior lining services, with sections dedicated to facility, owner, and tank information, as well as detailed pre-entry, entry, and post-lining assessment protocols.

The inspection report covers multiple technical aspects of UST relining, including evaluations of tank condition, compatibility of lining materials with stored products, and compliance with state regulatory standards. Key components of the inspection include assessing tank damage types (such as fractures, punctures, and delamination), verifying resin compatibility, conducting tank tightness tests, and ensuring proper installation methods. The document requires detailed documentation from service providers, including manufacturer certifications, testing results, and confirmation of adherence to Arizona administrative codes R18-12-220 and R18-12-281, with follow-up documentation to be submitted to ADEQ's UST Plan Review division.

View the file

Other files

File Type Posted
2024.1.1 Energy & Environmental Advisors, Inc. GAUWCPP.pdf PDF
2026-1-1 Energy & Environmental Advisors, Inc. GAUWCPP.pdf PDF
Attachment___6.0_Certificates_Licenses.pdf PDF
Attachment___6.0_Certificates_Licenses_2.pdf PDF
BPM005267 Contract Award and Executive Summary_Determination - Executed.pdf PDF
BPM005267 Determination of Not Susceptible for Award.pdf PDF
BPM005267 Unsuccessful Letter.docx DOCX document
BPM005267_Solicitation_Attachments.docx DOCX document
CTR0670133_Energy_EnvironmentalAdvisors_Contract_Extension_Amendment__2.pdf PDF
Exhibit C - UST Closure Inspection Report.docx DOCX document
Exhibit F - Contractor Performance Report_ADEQ_July2019.docx DOCX document
PDS - Joey Kiker.pdf PDF
2024-01-01 Williams & Co Consulting GAUWCPP.pdf PDF
BPM005267 Award CTR066266.docx DOCX document
Procurement Request.pdf PDF
State of Arizona Mail - RE_ BPM005267 UST Inspections - Clarification Request (Williams & Co Consulting).pdf PDF
2025-1-1 Energy & Environmental Advisors, Inc. GAUWCPP.pdf PDF
Attachment_-_Company_Experience.pdf PDF
BPM005267 BAFO Consensus Evaluation Report - Executed.pdf PDF
BPM005267 BAFO.pdf PDF
BPM005267 Consensus Evaluation Report - Executed.pdf PDF
BPM005267 Executive Summary_Determination of Award - Executed.pdf PDF
BPM005267 Offer and Acceptance_CTR066266_Williams Co Consulting.pdf PDF
BPM005267 Responsibility Responsiveness Form.xlsx XLSX spreadsheet
BPM005267-UST_Inspections_-_Pricing_Sheet.xlsx XLSX spreadsheet
CTR066266_Williams___Co_Consulting_Pricing_Sheet.xlsx XLSX spreadsheet
Consent_to_Assignment_Executed_20230811.pdf PDF
Exhibit D - UST INSTALLATION INSPECTION REPORT.docx DOCX document
Exhibit G - QUALITY ASSURANCE PROJECT PLAN (QAPP) Checklist.docx DOCX document
State of Arizona Mail - RE_ 5622937 QUOTE Solicitation Advertisement.pdf PDF
2023-1-1 Williams Co 18-214731 GAUWPP.pdf PDF
Attachment_-_Supplement_Insurance (1).pdf PDF
BPM005267 Attachment 1 Offer and Acceptance Form.pdf PDF
BPM005267 Past Performance Questionnaire Williams Co Consulting_SWB-6-21-23.pdf PDF
BPM005267 Solicitation Requirements.pdf PDF
CTR066266_BAFO_Document.pdf PDF
CTR0670133_Energy_EnvironmentalAdvisors_Contract_Extension_Amendment__1.pdf PDF
Email to confirm new RFP Requested for Existing Contract.pdf PDF
Exhibit A - UST Field Inspection Report.docx DOCX document
Exhibit B - Modification Inspection Report.docx DOCX document
PDS - Jason Kocer.pdf PDF
PDS Non ADEQ Employee - Stephen Johnson.pdf PDF
State of Arizona Mail - Fwd_ 5622937 QUOTE Solicitation Advertisement Quote Request.pdf PDF
State of Arizona Mail - Re_ BPM005267 UST Inspections - Clarification Request (Environmental Technology).pdf PDF
CTR0670133_Energy_EnvironmentalAdvisors_Key_Personnel_Amendment__3.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BPM005267 Exhibit E

UST INTERIOR LINING INSPECTION REPORT

ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY

1110 West Washington Street, Phoenix, Arizona 85007 ADEQ Help Line (In-State Only) 1-800-234-5677

INSPECTION INFORMATION
ADEQ Plan Review #
MD

Date of Pre-Entry Contact with Contractor

Entry/Pre-Lining Inspection to occur AFTER tank assessment but BEFORE lining begins.

Date of Entry / Pre-Lining Inspection

Date of Pre-Burial Inspection
(Required if spill bucket, containment sump, or piping is disturbed.)

Contractor to schedule Post-Entry Inspection to allow observation of tank / line / hydrostatic testing.

If on-site Post-Entry Inspection is not required, submit documentation of items listed in Post-Lining Assessment

FACILITY INFORMATION

Facility Name

ADEQ Facility ID

Facility Address

City & Zip

Facility County
Choose an item.
OWNER INFORMATION

UST Owner Name

Mailing Address

Owner Contact Name

Contact Title

Owner Contact Email

Contact Phone #

Is F.R. current?
YES ☐ No ☐
F.R. Expiration

PERSON QUALIFIED TO DETERMINE WHETHER TANKS ARE SUITABLE FOR LINING/REPAIR

Company

Individual’s Name

Individual’s Title

Individual’s Email

Phone #

INTERIOR LINING SERVICE PROVIDER INFORMATION

Service Provider Company

Address of Service Provider Company

Service Provider Name

ADEQ Certification #
IL00

Email Address

Phone #

Resin on Contractor’s License

Manufacturers’ Certifications
Contractor to submit to Plan Review letter(s) from the manufacturers of the materials to be used in the relining process that 1) authorize the contractor’s use of the material, and 2) affirm the material’s compatibility with the product(s) stored in the USTs to be lined.

TANK INFORMATION (each compartment is to be listed in a separate column)

Tank ID #

Installation Date

Tank Manufacturer

Tank Model

Compartmentalized Tank
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Compartment Size
Tank Wall Type
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Tank Material Construction
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Tank Corrosion Protection
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Product
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Tank Status
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
If in Temp Closure:

Date placed in TC

Suspected Release #

LUST #

Was tank lined previously?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Date of Last

Tank Tightness Test

Testing Company

Result
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Comments

SCOPE OF WORK

Tank ID #

Intended Scope of Work
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Is reline allowed by tank manufacturer?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
USTs will be opened, relined, & returned to service
All at the same time ☐ Individually / one at a time ☐

REASON for interior lining

Method to be used to vapor-free UST
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Method of TANK ENTRY
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Has the PRODUCT PIPING been disturbed?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
RESIN to be used to re-line these tanks
Is the resin compatible with the product to be stored in the UST?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Does the resin on-site match the resin intended to be used?
Choose an item.
Does the resin on-site match the resin on the contractor’s license?
Choose an item.
Is the resin UL listed?
Choose an item.
If the resin is NOT UL listed, is the material approved by the tank manufacturer?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
LINING MATERIAL
Is the lining material compatible with the product to be stored in the UST?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.

PRE-ENTRY INFORMATION PROVIDED BY SERVICE PROVIDER

Tank ID #

Date Fuel Removed

Emptied to less than 1”
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Date of Triple Rinse

Triple Rinse performed by

All Electrical Equipment to Turbines and Ancillary Equipment is Disconnected
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
(comment such as: LOTO at electrical panel / yoke disconnected)
(comment such as: LOTO at electrical panel / yoke disconnected)
(comment such as: LOTO at electrical panel / yoke disconnected)
(comment such as: LOTO at electrical panel / yoke disconnected)
(comment such as: LOTO at electrical panel / yoke disconnected)
Method used to vapor-free UST
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.

ENTRY / PRE-LINING ASSESSMENT OF FRP USTs

Tank ID #

Evaluation Method
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
FTPI T-95-1 Tank Damage Classifications
For any “Yes” answers, add narrative in the Comments Regarding Tank Damage section.
FRACTURES (cracking)
A crack in the FRP sometimes causing delamination. This is usually caused by a significant impact. Some tank sections may be torn out of the tank and may need rebuilding. (FTPI T-95-1)
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
PUNCTURES (holes)
A hole or penetration in the surface of the fiberglass laminate. A sharp object may pierce the tank wall. A puncture is usually “clean” with little distortion to the area around the damage. (FTPI T-95-1)
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
DELAMINATION
The rupture of internal bonding between layers of fiberglass and resin. A separation in the layers of Fiberglass, or a peeling away of secondary bond laminate. This type of damage occurs mostly at the fittings, lift lug or other tank attachments. However, it may also be seen at the ribs or the inside of a tank. (FTPI T-95-1)
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
MISSING SECTIONS
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
SURFACE CRACKING
These are generally small cracks that appear in the surface of the tank, inside or out. For the most part they do not penetrate the tank wall. These are minor in nature but need the same professional attention as the other types of damage. (FTPI T-95-1)
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
GEOMETRIC DISTORTION
This is an out-of-round condition with unequal vertical and horizontal measurements or bottom flattening. Tank geometry changes are usually the result of improper installation methods, which can be detected by measuring the tank diameter after installation and before the tank is placed in service. (FTPI T-95-1)
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
LOCAL BUCKLING
This is the distortion of the shell wall between the ribs. (FTPI T-95-1)
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Is UST suitable for the intended scope of work per the qualified person?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Comments

ENTRY / PRE-LINING ASSESSMENT OF STEEL USTs

Tank ID #

Metal Thickness Reading

Testing Method(s)

Is tank suitable for the intended scope of work per the qualified person?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Comments

POST-LINING ASSESSMENT OF USTs

API 1631 Form B provided for each compartment
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Shell Thickness

Method for determining shell thickness

Lining Hardness Reading

Method for determining hardness

PRE-BURIAL INSPECTION

Tank Tightness Test Date

Tank Tightness Test Result
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Hydrostatic Test Date
Sumps Tested
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Hydrostatic Test Result
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Line Tightness Test Date
Line Tightness Test Result
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
PRECISION TESTING

Tank Tightness Test Date

Tank Tightness Test Result
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Line Tightness Test Date
Line Tightness Test Result
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Testing Company

Tester’s Name

Tester’s ADEQ #

For steel USTs, is cathodic protection restored?
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.
Cathodic Protection Method
Choose an item.Choose an item.Choose an item.Choose an item.Choose an item.

GENERAL COMMENTS regarding INTERIOR LINING INSPECTION

Walked site with Service Provider. Conducted inspection.

_______ I (the service provider) have personally verified that all UST system components installed for this inspection are compatible with the fuels that will be stored and are installed according to manufacturers’ instructions and the applicable installation standards and codes of practice in R18-12-220 and R18-12-281.

Follow-up action is needed: submit 3rd party tank testing documentation and documentation of items listed in Post Lining portion of checklist to USTPlanReview@azdeq.gov.

Inspector’s Printed Name

Inspector’s Signature

Date

Service Provider’s Name

Service Provider’s Signature

Date

GENERAL COMMENTS regarding PRE-BURIAL INSPECTION

Walked site with Service Provider. Conducted inspection.

_______ I (the service provider) have personally verified that all UST system components installed for this inspection are compatible with the fuels that will be stored and are installed according to manufacturers’ instructions and the applicable installation standards and codes of practice in R18-12-220 and R18-12-281.

Follow-up action is needed: submit 3rd party tank testing documentation and documentation of items listed in Post Lining portion of checklist to USTPlanReview@azdeq.gov.

Inspector’s Printed Name

Inspector’s Signature

Date

Service Provider Company

Service Provider Name

ADEQ Certification #
INR0

Email Address

Phone #

Service Provider’s Signature

Date

Interior Lining Inspection Report - Page 6

PHOTO LOG

image2.png image1.png oleObject1.bin