This document is a collection of multiple Underground Storage Tank (UST) inspection, modification, closure, and relining reports from the Arizona Department of Environmental Quality (ADEQ). The reports involve various facilities and companies, including Circle K, Fry's Food Stores, Safeway, Rock Springs Gas Depot, and others located across Arizona counties such as Maricopa, Coconino, and Yavapai. The documents are official state inspection records detailing UST system assessments, installations, modifications, and decommissioning processes.
The reports comprehensively document UST system components including tanks, piping, dispensers, and ancillary equipment for retail fuel sales facilities. The inspections cover critical aspects such as tank material (predominantly fiberglass reinforced plastic), product types (diesel, unleaded, and premium gasoline), leak detection methods, interstitial monitoring, spill prevention, and compliance with state and federal underground storage tank regulations. The documents demonstrate rigorous testing protocols, including hydrostatic tests, pressure tests, leak detection system evaluations, and environmental sampling to ensure system integrity and prevent potential environmental contamination. Each report includes detailed technical specifications, installation dates, tank dimensions, manufacturer information, and compliance status with Arizona Revised Statutes and Administrative Codes related to underground storage tank systems.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 10 – Experience and Capacity Response (Continued)
2.1 Provide at least one example per UST Inspection type that exhibits your experience for clients relevant to the Scope of Work for UST Inspections. Provide supporting documentation as a separate attachment and title the document: “Attachment - Company Experience”.
Williams & Company Consulting, Inc. (now providing as Energy & Environmental Advisors, Inc.)
currently holds ADEQ18-00008257 UST Inspections contract for ADEQ and has been performing each type of inspection, relevant to the scope of work, since August of 2018. We provided inspection reports to demonstrate these examples in Attachment – Company Experience.
EXAMPLE 1:
ROUTINE INSPECTION REPORT
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 1
UST Field Inspection Report Facility Name : CARIOCA #35 Facility ID: 0-000945
Inspection ID: 421620 Inspection Date: April 25, 2023
Physical Location:
Mailing Address: 2623 W DUNLAP AVE, PHOENIX, AZ 85021 County: MARICOPA
Inspector(s): Randy Jaquez Patrick Baty Inspector Email and Phone:
jaquez.randy@azdeq.gov (602) 826-8789 Site Arrival Time: 1110 Site Departure Time: 1230
Responsible Party Contact: Magee, Howard Phone: (602) 741-3532 Email: HOWARD@CARIOCACO.COM Tank Owner:
Owner Address:
Operator:
Operator Address:
Reason for Inspection:
☑ Routine Inspection ☐ Compliance Assistance ☐ Follow-Up ☐ Complaint ☐ Other:
Date Started: April 25, 2023 Date Completed: April 25, 2023
On-Site Representative Name and Title: Sam Lee, Manager Email:
Phone: (602) 943-1175
DRO:
DRO Email:
Facility Initial:
Inspection Report Issued: Email from ADEQ Office
ADEQ Initial:
Results of Inspection:
☑ This Facility is in compliance with Arizona Revised Statues A.R.S. §49-1001 through 49-1021 and associated Administrative Rules ☐ This Facility is not in compliance with Arizona Revised Statues A.R.S. §49-1001 through 49-1021 and associated Administrative Rules. Follow-up action is needed; please submit the requested documentation, which is detailed on the Due within 30 calendar days from this notice .
☐ Potential deficiencies were noted during the course of the inspection. Within one business day of this notice, submit compliance documentation to the compliance officer listed on this report.
Attachments: Notice of Inspection Rights, Small Business Bill of Rights, Photograph Log, Inspection Checklist, Small Business Bill of Rights, Inspection Checklist Comments:
Intent to Prohibit Delivery (Notice of Stop Use Order):
In accordance with A.R.S. § 49-1023.B.1, ADEQ may immediately issue a stop use order and affix a stop use tag on the non-compliant UST system(s) for the violation(s) identified below:
1. ☐ Section § 49-1003: Release Detection
2. ☐ Section § 49-1009: Tank Performance Standards
In accordance with A.R.S. § 49-1023.B.2, ADEQ will issue a stop use order on the non-compliant UST system(s) if the violation(s) identified below are not corrected within 30 days of the date of this notice.
3. ☐ Section § 49-1006: Financial Responsibility requirements
4. ☐ Section § 49-1020: Payment of Annual Tank Fees
5. ☐ Section § 49-1031: Payment of Fuel Tax
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 2
ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY
NOTICE OF INSPECTION RIGHTS
FACILITY INFORMATION ADEQ INFORMATION
Facility Name : CARIOCA #35 Facility ID: 0-000945 Physical Location:
Mailing Address: 2623 W DUNLAP AVE, PHOENIX, AZ 85021 County: MARICOPA
Date/Time of Inspection: April 25, 2023 Inspector: Randy Jaquez Patrick Baty Inspector Email and Phone: jaquez.randy@azdeq.gov
(602) 826-8789
Responsible Party Contact: Magee, Howard Phone: (602) 741-3532 Email: HOWARD@CARIOCACO.COM Tank Owner:
Owner Address:
Operator:
Operator Address:
On-Site Representative Name and Title: Sam Lee, Manager Email:
Phone: (602) 943-1175
DRO:
DRO Email:
ADEQ Follow-up Contact: FCB, Chris Brown -brown.chris@azdeq.gov - 602-771-
The ADEQ representative(s) identified above were present at the above address on the above listed date and time. Upon entry to the premises, the ADEQ representative(s) met with me, presented photo identification indicating that they are ADEQ employees and explained:
That the purpose of the inspection is to determine:
☑ Compliance with Title 49 of the Arizona Revised Statutes, Title 18 of the Arizona Administrative Code* and/or:
Arizona Revised Statutes: Title 49, Chapter 6.
Arizona Administrative Code: Title 18, Chapter 12.
Permit/Agreement Number: N/A.
☐ Qualification for a license issued pursuant to:
ARS: Title __, Chapter __, Article ___. AAC: Title __, Chapter __, Article ___.
☑ That this inspection is conducted pursuant to the authority granted in Arizona Revised Statutes § 49-104(B)(8) and/or:
Arizona Revised Statutes: § 49-1009.
Arizona Administrative Code: Title 18, Chapter 12.
Permit/Agreement Number: N/A.
☑ That the state shall not be barred by the statutes of limitations of actions, according to A.R.S. § 12-510, except as provided in A.R.S. § 12-529 concerning certain claims based on navigability of watercourses. According to 28 U.S.C. § 2462, the U.S. government must commence an action within 5 years after the date the claim first accrued.
☐ The applicability of the Small Business Bill of Rights pursuant to Arizona Revised Statutes § 41-1001(21).
☐ That the fee for this inspection is: $0.
*The Arizona Revised Statutes (A.R.S.) can be found on the internet: www.azleg.state.az.us/ArizonaRevisedStatutes.asp while the Arizona Administrative Code (A.A.C.) can be found at www.azsosaz.gov/public_services/Table_of_Contents.htm.
While I have the right to refuse to sign this form, the ADEQ representatives may still proceed with the inspection.
☑ I have read this notice and discussed any questions or concerns with the ADEQ representatives and I have received the Small Business Bill of Rights.
Signature of Regulated Person or Authorized On-Site Representative Sam Lee Name of Regulated Person or Authorized On-Site Representative
Date: April 25, 2023 Title: Manager
Signature of ADEQ Representative
Date: April 25, 2023
☐ The regulated person or authorized on-site representative refused to sign.
☐ The regulated person or authorized on-site representative was not present at the facility.
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 3
Inspection Rights
☑ I understand that I can accompany the ADEQ representative(s) on the premises, except during confidential interview.
☑ I understand that I have right to, on request:
• Copies of any original documents taken during the inspection, and that ADEQ will provide copies of those documents at
ADEQ’s expense;
• A split of any samples taken during the inspection, if the split of the samples would not prohibit an analysis from being conducted or render an analysis inconclusive;
• Copies of any analysis performed on samples taken during the inspection and that ADEQ would provide copies of this analysis at ADEQ’s expense;
• Copies of any documents to be relied on to determine compliance with licensure or regulatory requirements if the agency is otherwise permitted by law to do so.
☑ I also understand that:
• Each person who is interviewed by an ADEQ inspector during the inspection must be informed that:
1) Participation in an interview is voluntary, unless legally compelled to participate;
2) They have the right to have an attorney or other experts in their field present during the interview to represent or advise the regulated person;
3) The ADEQ inspector may not take any adverse action or treat less favorably or draw any inference as a result of the regulated person’s decision to be represented by an attorney or advised by any other experts in their field;
4) Statements made by the person may be included in the inspection report; and
5) They have the right to 24 hours to review and revise any written witness statement drafted by the ADEQ inspector on which the ADEQ inspector requests that person’s signature.
• If the information and documents provided to the ADEQ inspector become a public record, trade secrets and proprietary and confidential information may be redacted, unless the information and documents are not confidential pursuant to statute.
• Each person interviewed during the inspection must be informed that statements made by the person may be included in the inspection report;
• Each person whose conversation is tape recorded during the inspection must be informed that the conversation is being tape recorded;
• If an administrative order is issued or a permit decision is made based on the results of the inspection, I have the right to appeal that administrative order or permit decision. I understand that my administrative hearing rights are set forth in Arizona Revised Statutes § 41-1092 et seq. and my rights relating to an appeal of a final agency decision are found in Arizona Revised Statutes § 12-901 et seq;
• If I have any questions or concerns about this inspection, I may contact the person listed as the ADEQ Follow-up Contact on the front of this form; ADEQ’s Ombudsman at (602) 771-4322 (toll free inside Arizona at (800) 2345677, extension, 771-4322); or the Arizona Ombudsman-Citizens’ Aid office at (602) 277-7292 (toll free at
(800) 872-2879);
• If I have any questions concerning my rights to appeal an administrative order or permit decision, I may contact ADEQ’s Office of Administrative Counsel at (602) 771-2212 (toll free inside Arizona at (800) 234-5677, extension 771-2212).
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 4
Arizona Revised Statutes: Small Business Bill of Rights
41-1001.01. Regulatory bill of rights; small businesses A. To ensure fair and open regulation by state agencies, a person:
1. Is eligible for reimbursement of fees and other expenses if the person prevails by adjudication on the merits against an agency in a court proceeding regarding an agency decision as provided in section 12-348.
2. Is eligible for reimbursement of the person's costs and fees if the person prevails against any agency in an administrative hearing as provided in section 41- 1007.
3. Is entitled to have an agency not charge the person a fee unless the fee for the specific activity is expressly authorized as provided in section 41-1008.
4. Is entitled to receive the information and notice regarding inspections and audits prescribed in section 41-1009.
5. May review the full text or summary of all rulemaking activity, the summary of substantive policy statements and the full text of executive orders in the register as provided in article 2 of this chapter.
6. May participate in the rulemaking process as provided in articles 3, 4, 4.1 and 5 of this chapter, including:
(a) Providing written comments or testimony on proposed rules to an agency as provided in section 41-1023 and having the agency adequately address those comments as provided in section 41-1052, subsection D, including comments or testimony concerning the information contained in the economic, small business and consumer impact statement.
(b) Filing an early review petition with the governor's regulatory review council as provided in article 5 of this chapter.
(c) Providing written comments or testimony on rules to the governor's regulatory review council during the mandatory sixty-day comment period as provided in article 5 of this chapter.
7. Is entitled to have an agency not base a licensing decision in whole or in part on licensing conditions or requirements that are not specifically authorized by statute, rule or state tribal gaming compact as provided in section 41-1030, subsection B.
8. Is entitled to have an agency not make a rule under a specific grant of rulemaking authority that exceeds the subject matter areas listed in the specific statute or not make a rule under a general grant of rulemaking authority to supplement a more specific grant of rulemaking authority as provided in section 41- 1030, subsection C.
9. May allege that an existing agency practice or substantive policy statement constitutes a rule and have that agency practice or substantive policy statement declared void because the practice or substantive policy statement constitutes a rule as provided in section 41-1033.
10. May file a complaint with the administrative rules oversight committee concerning:
(a) A rule's, practice's or substantive policy statement's lack of conformity with statute or legislative intent as provided in section 41-1047.
(b) An existing statute, rule, practice alleged to constitute a rule or substantive policy statement that is alleged to be duplicative or onerous as provided in section 41-1048.
11. May have the person's administrative hearing on contested cases and appealable agency actions heard by an independent administrative law judge as provided in articles 6 and 10 of this chapter.
12. May have administrative hearings governed by uniform administrative appeal procedures as provided in articles 6 and 10 of this chapter and may appeal a final administrative decision by filing a notice of appeal pursuant to title 12, chapter 7, article 6.
13. May have an agency approve or deny the person's license application within a predetermined period of time as provided in article 7.1 of this chapter.
14. Is entitled to receive written notice from an agency on denial of a license application:
(a) That justifies the denial with references to the statutes or rules on which the denial is based as provided in section 41-1076.
(b) That explains the applicant's right to appeal the denial as provided in section 41-1076.
15. Is entitled to receive information regarding the license application process before or at the time the person obtains an application for a license as provided in sections 41-1001.02 and 41-1079.
16. May receive public notice and participate in the adoption or amendment of agreements to delegate agency functions, powers or duties to political subdivisions as provided in section 41-1026.01 and article 8 of this chapter.
17. May inspect all rules and substantive policy statements of an agency, including a directory of documents, in the office of the agency director as provided in section 41-1091.
18. May file a complaint with the office of the ombudsman-citizens aide to investigate administrative acts of agencies as provided in chapter 8, article 5 of this title.
19. Unless specifically authorized by statute, may expect state agencies to avoid duplication of other laws that do not enhance regulatory clarity and to avoid dual permitting to the extent practicable as prescribed in section 41-1002.
20. May have the person's administrative hearing on contested cases pursuant to title 23, chapter 2 or 4 heard by an independent administrative law judge as prescribed by title 23, chapter 2 or 4.
B. The enumeration of the rights listed in subsection A of this section does not grant any additional rights that are not prescribed in the sections referenced in subsection A of this section.
C. Each state agency that conducts audits, inspections or other regulatory enforcement actions pursuant to section 41-1009 shall create and clearly post on the agency's website a small business bill of rights. The agency shall create the small business bill of rights by selecting the applicable rights prescribed in this section and section 41-1009 and any other agency-specific statutes and rules. At the request of an authorized on-site representative of the regulated small business, the agency shall provide a written document of the small business bill of rights. In addition to the rights listed in this section and section 41-1009, the agency notice of the small business bill of rights shall include the process by which a small business may file a complaint with the agency employees who are designated to assist members of the public or regulated community pursuant to section 41-1006. The notice must provide the contact information of the agency's designated employees. The agency notice must also state that if the regulated person has already made a reasonable effort with the agency to resolve the problem and still has not been successful, the regulated person may contact the office of ombudsman-citizens aide.
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 5
UST Inspection Checklist
R18-12- Fill/Overfill Pass/Fail/N/A 220D(1) Spill bucket is free of cracks, bulges, holes, or other defects Pass
Comment:
220(A) Spill bucket is free of Product or PCW Pass
Comment:
220(A) Spill bucket lid is free of cracks and gasket is intact Pass
Comment:
220(A) Fill lid cap is functional and gasket is intact Pass
Comment:
220(A) Fill pipe is free of any obstructions and flapper valve is not disabled Pass
Comment:
220(A) DW SB: interstice port accessible and interstice free of liquid N/A
Comment:
220(A) DW SB: interstice gauge shows no liquid in the interstice Pass
Comment:
220(A) DW SB: interstice gauges are operational and readable Pass
Comment:
235(A)(1)(b) Triennial spill bucket integrity test conducted and passing Pass Comment: Test Date: 03/01/2023 235(A)(1)(b) Triennial sump and UDC integrity tests conducted and passing Pass Comment: Test Date: 02/16/2023
235(A)(2) Triennial Overfill Prevention Equipment test conducted and found operational and set to operate at the correct level
Comment: Test Date: 03/01/2023
R18-12- Pre-Inspection File Review Pass/Fail/N/A 240(A)(3) ATG Operability testing conducted and passing Pass
Comment: Test Date: 11/29/2022 237(G)(1) A and B operator certificates are present and current Pass
Comment: Samuel Lee on site Exp. Date: 07/19/2025 237(G)(1) C operator certificates (or signage, if unmanned facility) are present and current) N/A
Comment: N/A Exp. Date:
301(A) Financial Responsibility is current with the agency Pass
Comment: Exp. Date: 02/25/2024 222(B) Notification forms are submitted and accurately reflect all USTs present at the facility Pass
Comment:
222(B) Installation of new (after 12/22/88) UST(s) are properly certified on a notification form Pass
Comment:
233(E) Testing after any installation, modification, or repair conducted and present and within 30 days Pass
Comment:
222(D) Any new equipment installed/tested since last inspection N/A
Comment:
234(B)(1)-
(7) Records, repair, and testing and release detection available for inspection Pass
Comment:
CHECK Violations addressed and closed from previous inspections N/A
Comment:
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 6
R18-12- Fill/Overfill Pass/Fail/N/A 235(A)(2) Audible alarm test conducted and operational Pass
R18-12- Sumps Pass/Fail/N/A Has there been a precipitation event that may have contibuted to water in the sumps? No
220(A) Sump is free of product and/or Petroleum Contact Water (PCW) Pass Comment:
220(A) Sump is free of trash and other debris Pass Comment:
220(A) Sump is free of cracks, bulges or other defects Pass Comment:
220(A) RD Sensor is at the bottom of the sump Pass Comment:
220(A) STP or piping shows no significant signs of corrosion Pass Comment:
220(A) Line leak detectors (LLDs) are present and in good condition Pass
R18-12- Piping Pass/Fail/N/A 220(A) No cracks or breaks present in the piping Pass
Comment:
240(A)(1) DW Piping: Test boot is not pulled over piping and clamped or valve stem removed Pass
Comment:
220(A) Piping Penetrations are not cracked or coming off of sump wall Pass
Comment:
220(A) Piping flex connectors or metal components are not corroded Pass
R18-12- Dispensers and Under-Dispenser Containment (UDC) Sumps Pass/Fail/N/A 220(E) Shear Valve is properly anchored and all bolts are intact Pass
Comment:
220(A) Shear Valve switch has not been tampered with or held open Pass
Comment:
220(A) Shear Valve and connections are not leaking Pass
Comment:
220(A) UDC is free of product and/or Petroleum Contact Water (PCW) Pass
Comment:
220(A) UDC is free of trash, fuel filters or other debris Pass
Comment:
220(A) UDC is free of cracks, bulges, holes or other defects Pass
Comment:
220(A) Piping near or below the shear valve is free of leaks Pass
Comment:
220(A) Piping penetrations are not cracked, disintegrating, or coming off of UDC wall Pass
240(A)(1) DW Piping: Valve test stems removed or capped Pass
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 7
R18-12- Dispensers and Under-Dispenser Containment (UDC) Sumps Pass/Fail/N/A
240(A)(2) RD sensor is at the bottom of the UDC Pass
R18-12- Periodic Operation and Maintenance Walkthrough Inspections Pass/Fail/N/A
236(A)(1) Monthly Walkthroughs conducted every 30 days except where deliveries > 30 days Pass Comment:
236(A)(1)(a) Last 12 months of monthly walkthroughs are present Pass Comment:
236(A)(1)(b) Most recent annual walkthrough present Pass Comment:
236(A)(2);
236(A)(3) Monthly walkthroughs are conducted to a standard code of practice Pass
Comment:
236(A)(2);
236(A)(3) Annual Walkthroughs are conducted to a standard code of practice Pass
R18-12- ATG Operability Pass/Fail/N/A CHECKED ATG: Overview and Tank Inventory Overview is printed off the ATG Pass
Comment:
CHECKED ATG: RD Reports/Tapes are normal and alarms were investigated for unusual operating conditions or suspected releases Pass
Comment:
CHECKED ATG model is listed and confirmed for accuracy Pass
Comment: ATG Model: Veeder Root TLS 350 240(A) ATG is on and operational Pass
Comment:
245(C) ATG has paper and can print tank reports Pass
Comment:
240(A) ATG alarms acknowledged upon arrival N/A
Comment:
243(D)(1) ATG was in test mode a minimum of once a month for the last 12 months and documentation is present to verify Pass
Comment:
245(A) ATG installation documentation verified Pass
Comment:
240(A) Water in the bottom of the tank is checked and displayed to the nearest 1/8th of an inch Pass
Comment:
240(A) Device documentation is available on site (owner’s manual, manufacturer’s brochure) Pass
Comment:
245(A) ATG was installed, calibrated and maintained in accordance with manufacturer's specifications. Pass
Comment:
245(A)(2) ATG maintenance records maintained and available Pass
Comment:
240(A)(3) All parts of the UST system that use the ATG are programmed and being actively monitored Pass
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 8
R18-12- ATG Operability Pass/Fail/N/A
240(A)(4)
The following ATG minimum performance standards are met: 0.20 gph with probability of detection of 95% and probability of false alarm of 5% for ATG (e.g., third-party result sheet under EPA’s “Standard Test Procedures for Evaluating Leak Detection Methods”)?
Will declare a leak on the basis of inventory reconciliation if discrepancy exceeds 1% of flow-through, plus 130 gallons on a monthly basis Detects water and product to the nearest 1/8th of an inch
Pass
R18-12- Release Detection – General Pass/Fail/N/A 240(A) A method, or combination of methods, of release detection is in use Pass
Comment:
234(B)(7);
245(C) Last 12 months of release detection records are present Pass
R18-12- Release Detection – Site Specific
Method of Release Detection: Annual or Triennial Line Tightness test conducted and passing (Record Test Date)
Test Date (if applicable): 11/29/2022
Method of Release Detection: Annual Line Leak Detector test conducted and passing (Record Test Date)
Test Date (if applicable): 11/29/2022
Method of Release Detection: Interstitial monitoring conducted at least monthly
Test Date (if applicable): 04/25/2023
R18-12- Corrosion Protection Systems Pass/Fail/N/A
231(B)(1) Cathodic protection systems tested within 6 months of install and every 3 years thereafter N/A
Comment: Test Date:
233(C) Cathodic protection systems tested within six months of a repair N/A
Comment:
231(D) Records of sacrificial anode system tests indicate system is functioning properly N/A
Comment:
231(C) Records of cathodic protection systems being inspected every 60 days (Impressed Current Only) N/A
Comment:
220(B)(2)(c) Impressed current system is turned on and operating upon arrival N/A Comment: Amps/Volts/Hours:
R18-12- Safe Suction Piping Pass/Fail/N/A
241(C)(2)(a) Piping operates at less that atmospheric pressure N/A
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 9
R18-12- Safe Suction Piping Pass/Fail/N/A 241(C)(2)(d) Piping has one operational check valve located directly under the pump N/A Comment:
241(C)(2)(b) Slope of piping allow product to drain back into tank when suction is released N/A Comment:
241(C)(2) All information regarding suction piping has been verified with documentation N/A
R18-12- Suspected Releases Pass/Fail/N/A
251(A) Any suspected releases between inspection periods were reported within 24 hours of discovery N/A
Comment:
251(C) Suspected Releases were investigated within 60 days and the result reported to the agency N/A
Comment:
251(E) 14 day follow up of confirmed releases were filed with the agency N/A
Comment:
251(A) ATG alarms notifying of product in STP sumps or UDCs were investigated N/A
Comment:
230(B) No evidence of a spill or overfill present associated with a UST system Pass
R18-12- USTs Temporarily Closed For More Than 3 Months Pass/Fail/N/A 270(B) Corrosion protection has been maintained during closure N/A
Comment:
270(B) Release detection has been maintained during closure N/A
Comment:
270(B) USTs have been emptied to no more than 2.5 centimeters (1 inch) of residue or 0.3% by weight of the total capacity of the UST system N/A
Comment:
270(C)(1) Vent lines left open and functional N/A
Comment:
270(C)(2) All other lines, pumps, manways, and ancillary equipment are capped N/A
R18-12- Upgrades and Compatibility Pass/Fail/N/A 221(A) The UST system meets upgrade requirements as per A.A.C R18-12-221 Pass
Comment:
211(A)(3);
232(A) UST system components are compatible with the substances stored Pass
Comment:
232(B) Records demonstrating compatibility of UST system and components are present Pass
R18-12- Expired Exemptions Pass/Fail/N/A 210 (A) Emergency Generator UST has been upgraded to meet requirements N/A
Comment:
210 (A) Field Constructed Tanks (FCTs) have been upgraded to meet requirements N/A
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 10
R18-12- Expired Exemptions Pass/Fail/N/A 210 (A) Airport Hydrant Systems (AHSs) have been upgraded to meet requirements N/A
R18-12- For USTs Temporarily Closed For More Than 12 Months Pass/Fail/N/A 271(A) USTs have been upgraded, permanently closed, or had a change in service N/A
Comment:
270(A) Notification form for closure has been submitted N/A
Comment:
271(D)(5) Site assessment was conducted for tank closure N/A
Comment:
270(E) Permanently closed a UST system that does not meet either the performance standards for new UST systems or the upgrade standards and has been in temporary closure for more than 12 months
N/A
Piping Information Piping Number Pipe Wall Double Type of Construction Fiberglass Reinforced Plastic Leak Detection Method(s) Interstitial Monitoring (Double Walled) Type of Delivery System PRESSURE Location of Check Valves Comment Piping Count 9
Pipe Wall Double Type of Construction Fiberglass Reinforced Plastic Leak Detection Method(s) Interstitial Monitoring (Double Walled) Type of Delivery System PRESSURE Location of Check Valves
Piping Count 10a
Pipe Wall Double Type of Construction Fiberglass Reinforced Plastic Leak Detection Method(s) Interstitial Monitoring (Double Walled) Type of Delivery System PRESSURE Location of Check Valves
Piping Count 10b
Tank Information Tank Number 0-000945 Tank 9 COMPARTMENT A Date Installed 2020-11-20 Capacity(gallons) 12,000 Tank Wall Double Type of Construction Fiberglass Reinforced Plastic Contents Unleaded Gasoline Leak Detection Method(s) Interstitial Monitoring (Double Walled) Overfill Protection Flapper
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 11
Spill Protection Yes
Tank Count 1
Tank Number 0-000945 Tank 10 COMPARTMENT A Date Installed 2020-11-20 Capacity(gallons) 6,000 Tank Wall Double Type of Construction Fiberglass Reinforced Plastic Contents Premium Unleaded Gasoline Leak Detection Method(s) Interstitial Monitoring (Double Walled) Overfill Protection Flapper Spill Protection Yes
Tank Count 2
Tank Number 0-000945 Tank 10 COMPARTMENT B Date Installed 2020-11-20 Capacity(gallons) 6,000 Tank Wall Double Type of Construction Fiberglass Reinforced Plastic Contents Diesel Leak Detection Method(s) Interstitial Monitoring (Double Walled) Overfill Protection Flapper Spill Protection Yes
Tank Count 3
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 12
Photo Log
Facility Name: CARIOCA #35 Facility ID: 0-000945
Photo Number: 1 Inspector: Randy Jaquez
Photo Date: April 25, 2023
Photo Description: Veeder Root TLS 350
Photo Number: 2 Inspector: Randy Jaquez
Photo Description: Tank inventory
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 13
Photo Number: 3 Inspector: Randy Jaquez
Photo Description: Liquid status all normal
Photo Number: 4 Inspector: Randy Jaquez
Photo Description: Store front
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 14
Facility ID: 0-000945
Photo Number: 5 Inspector: Randy Jaquez
Photo Description: Dispensers
Photo Number: 6 Inspector: Randy Jaquez
Photo Description: Dispensers
Photo Number: 7 Inspector: Randy Jaquez
Photo Description: Tank pad
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 15
Photo Number: 8 Inspector: Randy Jaquez
Photo Description: Tank 1 unleaded 87 overview
Photo Number: 9 Inspector: Randy Jaquez
Photo Description: Tank 1 unleaded 87 Spill bucket overview
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 16
Facility ID: 0-000945
Photo Number: 10 Inspector: Randy Jaquez
Photo Description: Tank 1 unleaded 87 Spill bucket and Interstice gauge
Photo Number: 11 Inspector: Randy Jaquez
Photo Description: Tank 1 unleaded 87 Fill tube and flapper valve
Photo Number: 12 Inspector: Randy Jaquez
Photo Description: Tank 1 unleaded 87 STP sump
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 17
Photo Number: 13 Inspector: Randy Jaquez
Photo Description: Tank 1 unleaded 87 Piping penetration
Photo Number: 14 Inspector: Randy Jaquez
Photo Description: Tank 1 unleaded 87 Interstitial probe
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 18
Facility ID: 0-000945
Photo Number: 15 Inspector: Randy Jaquez
Photo Description: Tank 2a premium 91 overview
Photo Number: 16 Inspector: Randy Jaquez
Photo Description: Tank 2a premium 91 Spill bucket overview
Photo Number: 17 Inspector: Randy Jaquez
Photo Description: Tank 2a premium 91 Spill bucket and Interstice gauge
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 19
Photo Number: 18 Inspector: Randy Jaquez
Photo Description: Tank 2a premium 91 Fill tube and flapper valve
Photo Number: 19 Inspector: Randy Jaquez
Photo Description: Tank 2a premium 91 STP sump
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 20
Facility ID: 0-000945
Photo Number: 20 Inspector: Randy Jaquez
Photo Description: Tank 2a premium 91 Piping penetration
Photo Number: 21 Inspector: Randy Jaquez
Photo Description: Tank 2 b diesel overview
Photo Number: 22 Inspector: Randy Jaquez
Photo Description: Tank 2 b diesel Spill bucket overview
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 21
Photo Number: 23 Inspector: Randy Jaquez
Photo Description: Tank 2 b diesel Spill bucket
Photo Number: 24 Inspector: Randy Jaquez
Photo Description: Tank 2 b diesel Fill tube and flapper valve
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 22
Facility ID: 0-000945
Photo Number: 25 Inspector: Randy Jaquez
Photo Description: Tank 2 b diesel STP sump
Photo Number: 26 Inspector: Randy Jaquez
Photo Description: Tank 2 b diesel Piping penetration
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 23
Photo Number: 27 Inspector: Randy Jaquez
Photo Description: Fuel types
Photo Number: 28 Inspector: Randy Jaquez
Photo Description: UDC
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 24
Photo Number: 29 Inspector: Randy Jaquez
Photo Description: UDC piping penetration
Photo Number: 30 Inspector: Randy Jaquez
Photo Description: Vent lines and alarm
Revised April 2021 Facility ID: 0-000945 Inspection ID: 421620 Page 25
Facility ID: 0-000945
Photo Number: 31 Inspector: Randy Jaquez
Photo Description: Vent lines and alarm
EXAMPLE 2:
ROUTINE EXIT DEBRIEF REPORT
UST FIELD INSPECTION EXIT DEBRIEFING
Facility Name : CIRCLE K #2703463 Facility ID: 0-010530 Inspection ID: 421036
Physical Location:
Mailing Address: 2737 S ELLSWORTH RD, MESA, AZ 85209 County: MARICOPA
Inspector(s): Randy Jaquez (602) 826-8789 Inspector Email: jaquez.randy@azdeq.gov Compliance Officer: Chris Brown -brown.chris@azdeq.gov - 602-771-4270 Inspection Date: April 7, 2023 Responsible Party Contact: Kwiatkowski, Kim K.
Phone: (602) 728-8000 Email: AZLICENSE@CIRCLEK.COM Tank Owner: CIRCLE K STORES INC Owner Address: PO BOX 52085, PHOENIX, AZ 85072 Operator: CIRCLE K STORES INC Operator Address: PO BOX 52085, PHOENIX, AZ 85072
DRO: DOVIE MARIE SNYDER
DRO Email: DSNYDER@CIRCLEK.COM
On-Site Representative Name and Title: Angela Howe , CSR Email:
Phone:
You have just received an inspection conducted to evaluate compliance with the Arizona Revised Statutes, Title 49; the Arizona Administrative Code; and applicable permits/licenses. The following is intended to summarize potential deficiencies noted during the inspection, items you should consider for follow up action, or additional information requested by the inspector that is necessary to make a compliance determination. Be advised that additional reports and correspondence may be forthcoming from ADEQ.
Any omissions in this exit debriefing shall not be construed as a determination of compliance with applicable laws and rules.
Results of Inspection:
☐ This Facility is in compliance with Arizona Revised Statues A.R.S. §49-1001 through 49-1021 and associated Administrative Rules.
☑ This Facility is not in compliance with Arizona Revised Statues A.R.S. §49-1001 through 49- 1021 and associated Administrative Rules. Follow Up Action due within 30 days of this notice (May 7, 2023): Notice of Opportunity to Correct Deficiencies ☐ Potential deficiencies were noted during the course of the inspection. Within one business day of this notice, (), submit compliance documentation to the compliance officer listed on this report.
Additional deficiencies were noted during the inspection, and will be provided in the final inspection report.
Documentation:
Please submit documentation to the ADEQ contact above demonstrating that no violation has occurred or documentation that the alleged deficiency has been corrected. Acceptable documentation includes, but is not limited to photographs, receipts, standard operating procedures, and/or relevant logs.
Documents confirming the following items were not available at the time of the inspection. This documentation can be submitted to the inspector Randy Jaquez (602) 826-8789 within one business day of this notice to meet the compliance standards of Arizona Revised Statutes A.R.S. §49-1001 through 49-2021. If documentation is not received within 1 business day a NOC/NOV will be issued.
Subsequent correspondence will be handled via a compliance officer Chris Brown -brown.chris@azdeq.gov - 602-771-4270.
Is there a one-day delay for paperwork?
Yes
Field Inspection Comments:
Was compliance assistance provided?
No
Compliance Assistance Comments:
Violations List 1 Violations Code: A.A.C. R18-12-240 - 245: Previous 12 months of monthly release detection results.
Notes:
Violations List 2
Violations Code: A.A.C. R18-12-236(A)(1)(a): Monthly walkthrough inspections (every 30 days) of spill prevention equipment and release detection equipment Notes:
Please submit your response to your inspector’s attention at the Arizona Department of Environmental Quality, 1110 West Washington Street, Phoenix, Arizona 85007 or via email. Once ADEQ has received the requested documentation, the case will be closed and a letter will be issued stating that the agency will take no further action as a result of this inspection.
EXAMPLE 3:
NEW INSTALLATION INSPECTION REPORT
Installation Report version 2021.08.11
UST INSTALLATION INSPECTION REPORT
1110 West Washington Street, Phoenix, Arizona 85007
ADEQ Help Line (In-State Only) 1-800-234-5677
INSPECTION
INFORMATION
ADEQ Plan # NT5260.001 State Program None
Pre-Burial Tank Date 08/24/2022 Arrival
Time 7:00am
Departure Time
10:00am
Pre-Burial Piping Date 09/26/2022 Arrival
Time 9:10am
Departure Time
1:25pm
Final Inspection Date 04/24/2023 Arrival
Time 12:35pm
Departure Time
1:40pm
FACILITY INFORMATION
Facility Name Fry’s Fuel Center 104 ADEQ Facility ID 0-005260
Facility Address 1322 E. Route 66
City & ZIP Flagstaff 86001 Facility County Coconino
Tank Usage Retail Fuel Sale Facility Status Always Staffed
OWNER INFORMATION
UST Owner Name Fry’s Food Stores of Arizona
Mailing Address 500 S. 99th Avenue, Tolleson, AZ 85353
Owner Contact Name Dave Hill Contact Title Project Manager
Owner Contact Email Dave.Hill@frysfood.com Contact Phone # (623) 907-1990
Owner Type Private or Corporation
INSTALLER INFORMATION
Service Provider Company Eaton Sales and Services
Service Provider Address 3420 W. Whitton Avenue, Phoenix, AZ 85017
Primary Contact Loren Hodges Position Construction Mgr
Email Address LorenH@eatonmetal.com Primary Phone # (602) 415-3394
INSTALLATION INFORMATION
Backfill Material Crushed Rock Sieve Analysis meets tank manufacturer’s requirements
Bedding Depth 12+ inches Bedding Depth meets tank manufacturer’s requirements
Top of Tank Depth 80” Bottom of Tank Depth 200”
Excavation Liner Filter/Geotextile Fabric Will Excavation Cover be Subject to Traffic Yes
Cover Concrete Cover Thickness 8”
Tank Pit Monitoring Wells Yes Number of Wells 2 Well Location(s) SW and NE corners mailto:Dave.Hill@frysfood.com mailto:LorenH@eatonmetal.com
TANK INSTALLATION INFORMATION
Complete One Column for Each Compartment
Tank ID # 8 9A 9B
Tank Gallon Capacity 20,000 18,000
Compartmentalized Tank No Yes
If yes, compartment sizes 8,000 10,000
PRODUCT
Regular Unleaded
/ 87 Premium
Unleaded / 91 Diesel
Tank Compatible with Product
Yes Yes Yes
Manifolded Tank No No No
Manifolded with (T#) N/A N/A N/A
Method of Manifold
☒ Vent lines
☐ Product Lines
☐ Siphon Line
☐ Vent lines
☐ Product Lines
☐ Siphon Line
☐ Vent lines
☐ Product Lines
☐ Siphon Line
Location of Manifold N/A N/A N/A
TANK MANUFACTURER Xerxes Xerxes
Tank Model 622-057 632-108
Tank Diameter 10’ 10’
Tank Length 37’ – 8 ¾” 35’ – 2 ¼”
Serial # 91005507 91005508
UL # F-44612134 F-44612136
Tank Wall Type Double Double
Tank Material Construction Fiberglass
Reinforced Plastic Fiberglass Reinforced Plastic
Tank Corrosion Protection n/a n/a
ANNULAR SPACE Wet Annular Wet Annular
Vacuum Gauge Reading N/A N/A
Vacuum Gauge Reading after 1-hour wait period (if applicable)
N/A N/A
Does the Vacuum Gauge Reading meet tank the manufacturer’s requirements for installation?
N/A N/A N/A
Vacuum Application Date
N/A N/A N/A
Does the Vacuum Application Date meet the tank manufacturer’s requirements for installation?
N/A N/A N/A
Is MONITORING FLUID visible on the tank’s
EXTERIOR?
No No
Is monitoring fluid visible on the tank’s INTERIOR?
No No No
Monitoring Fluid level 6-1/2” 0-3/4”
Pressure Test Result (PSI) 2.2 psi 2.0 psi 2.2 psi
Soap Bubble Test Date 09/26/2022 09/26/2022 09/26/2022
TANK INSTALLATION INFORMATION - continued
Tank ID # 8 9A 9B
Product Regular Unleaded
/ 87 Premium
Unleaded / 91 Diesel
ANCHORAGE Method Overburden Overburden Overburden
1st vertical measurement (UST on bedding material)
123-1/2” 123-1/2” 123-1/2”
Vertical measurement after anchoring UST
N/A N/A N/A
Vertical measurement after backfilling to tank top
123-1/2” 123-1/2” 123-1/2”
Is deflection within tank manufacturer’s range?
Yes Yes Yes
Space Between USTs 24+ inches
Space from USTs to basin walls
24+ inches
GENERAL COMMENTS
about UST installation
USTs were delivered on 8/17/2022 and staged on bedding / backfill material until 08/24/2022 when they were installed in the basin.
ANCILLARY EQUIPMENT INFORMATION
Tank ID # 8 9A 9B
Product Regular Unleaded
/ 87 Premium
Unleaded / 91 Diesel
SPILL CONTAINMENT
Manufacturer & Model
OPW
1C-31320
OPW
1C-31320
OPW
1C-31320
Spill Containment Type Double Double Double
If Double Wall, type of gauge
Site Glass Site Glass Site Glass
Spill Containment Size (Gallons)
5 5 5
Reference: PEI/RP100-17, Section 7.2: SPILL CONTAINMENT
Spill Containment Integrity Test Date
09/26/2022 09/26/2022 09/26/2022
Spill Containment Integrity Test Method
Hydrostatic Test Hydrostatic Test Hydrostatic Test
Spill Containment was tested according to
Industry Standards Industry Standards Industry Standards
Is water within 1.5 inches of the top of the spill bucket?
Yes Yes Yes
PRE-test Height 11-2/16 inches 10 inches 9-12/16 inches
POST-test Height 11-2/16 inches 10 inches 9-12/16 inches
Did the water level drop
1/8” OR MORE?
No No No
Was a 30-inch water column of vacuum attained to start the test?
N/A N/A N/A
Is the ending vacuum level 26 inches water column or greater?
N/A N/A N/A
Spill Containment Integrity Test Result
Pass Pass Pass
FILL CAP Manufacturer &
Model
OPW / 634TT
Fill Adapter Manufacturer & Model
OPW / 61SALP
OVERFILL
PREVENTION Device
Flapper Valve
Flapper Manufacturer OPW
Flapper Model # 71S0-410C
VAPOR RECOVERY CAP
Manufacturer & Model
OPW
Vapor Recovery Adapter Manufacturer & Model
OPW
GENERAL COMMENTS
about Spill Containment
Vapor recovery buckets for UNLEADED and PREMIUM were also tested hydrostatically and passed.
ANCILLARY EQUIPMENT INFORMATION
Tank ID # 8 9A 9B
Product Regular Unleaded
/ 87 Premium
Unleaded / 91 Diesel
STP CONTAINMENT Mfgr Bravo Bravo Bravo
STP Containment Model B427x33-3BT-222-
B-PP-SL-K
B427x33-3BT-222-
B-PP-SL-K
B427x33-3BT-222-
B-PP-SL-K
STP Sump Wall Type Single Single Single
STP Containment Material Fiberglass Fiberglass Fiberglass
STP Containment DEPTH (from grade to lowest point sump)
80” 78” 79”
Reference: PEI/RP100-17, Section 8.5.4: CONTAINMENT SUMP TESTING.
STP Containment Hydrostatic Test Date
09/26/2022 09/26/2022 09/26/2022
Is the water a minimum of 4 inches above the highest wall penetration?
Yes Yes Yes
PRE-test Height 29-1/2 inches 30-14/16 inches 31-13/16 inches
POST-test Height 29-1/2 inches 30-14/16 inches 31-13/16 inches
Did the water level drop
1/8” OR MORE?
No No No
STP Containment Hydrostatic Test Result
Pass Pass Pass
GENERAL COMMENTS
about STP Containment Sump Hydrostatic Testing
Quantity of STPs 2 1 1
STP Turbine Manufacturer FE Petro FE Petro FE Petro
STP Turbine Model(s)
STPKMVS4-VL2-
STPKMRVS4-VL2-
STPKR150-VL2-24
STP Turbine Serial #
South:22E5005015 06S
North:
22E5005015055
22D501403120S 22G502201113S
Line Leak Detector Type Electronic Electronic Electronic
Line Leak Detector Mfgr FE Petro FE Petro FE Petro
Line Leak Detector Model TS-LSU500 TS-LSU500 TS-LSU500
Line Leak Detector Serial #
South:
22G501300040G
North:
22G501300039G
22G501300038G 22G501300037G
STP Piping Connector Flex Flex Flex
STP Corrosion Protection STP Sump STP Sump STP Sump
STP Equipment Compatible with Product
Yes Yes Yes
GENERAL COMMENTS
about Ancillary Equipment
PIPING INFORMATION
Tank ID # 8 9A 9B
Product Regular Unleaded
/ 87 Premium
Unleaded / 91 Diesel
New Piping Yes Yes Yes
Repair or Replacement Pipe
No No No
Total Piping Length ~340 feet ~340 feet ~340 feet
Piping System Type Pressurized Pressurized Pressurized
Piping Type Underground Underground Underground
Piping Wall Type Double Double Double
Piping Material Fiberglass
Reinforced Plastic Fiberglass
Reinforced Plastic Fiberglass
Reinforced Plastic
Piping Manufacturer Ameron Ameron Ameron
Piping Model Information Dualoy 3000LCX-A Dualoy 3000LCX-A Dualoy 3000LCX-A
Adhesive (Glue) Brand NOV NOV NOV
Is Adhesive (Glue) Compatible with Product
Yes Yes Yes
Is Piping Compatible with Product
Yes Yes Yes
Pressure Test Date 09/26/2022 09/26/2022 09/26/2022
PRIMARY
Test Pressure at START of Pressure Test
South: 56 psi @ D1/2
North: 57 psi @ D7/8
57 psi @ D7/8
57 psi @ D7/8
PRIMARY
Test Pressure at END of Pressure Test
South: 56 psi @ D1/2
North: 57 psi @ D7/8
57 psi @ D7/8
57 psi
PRIMARY
Pressure Test Results
Pass Pass Pass
SECONDARY
Test Pressure at START of Pressure Test
South: 6 psi @ D1/2
North: 5.0 psi @ D7/8
5.8 psi @ D7/8
6.0 psi
SECONDARY
Test Pressure at END of Pressure Test
South: 6.2 psi @ D1/2
North: 5.0 psi @ D7/8
6.0 psi @ D7/8
6.0 psi
SECONDARY
Pressure Test Results
Pass Pass Pass about Piping
UNLEADED has two STPs. One feeds the (3) south dispensers and (1) feeds the north (6) dispensers.
DISPENSER INFORMATION
Dispenser Description Gasoline only Gasoline & Diesel
Number of Dispensers
D3/4, D9/10, D15/16
All others
Dispenser Manufacturer (if available)
Wayne
Dispenser Model (if available)
B12/322XD6G B23/422XD6G+D
Dispenser Condition New New
Product at Dispenser Regular Unleaded
/ 87 Regular Unleaded
/ 87
Product at Dispenser Premium
Unleaded / 91 Premium
Unleaded / 91
Product at Dispenser Choose an item. Diesel
Product at Dispenser Choose an item. Choose an item.
Product at Dispenser Choose an item. Choose an item.
UDC Sump Manufacturer Bravo Bravo
UDC Sump Model B1250-E30 B1250-E30
UDC Sump Wall Type Single Single
UDC Sump Constr Material Fiberglass Resin Fiberglass Resin
Reference: PEI/RP100-17, Section 8.5.4: CONTAINMENT SUMP TESTING.
UDC Hydro Test Date 09/26/2022 09/26/2022
Is the water a minimum of 4 inches above the highest wall penetration?
Yes Yes
PRE-test Height D1/2, 13-15/16; D3/4, 14-7/16; D5/6, 14-0; D7/8, 22-2/16; D9/10, 14-5/16, D11/12, 14-13/16; D13/14, 14- 7/16; D15/16, 13-0; D17/18, 13-0
POST-test Height D1/2, 13-15/16; D3/4, 14-5/16; D5/6, 14-0; D7/8, 22-2/16; D9/10, 14-5/16, D11/12, 14-13/16; D13/14, 14- 7/16; D15/16, 13-0; D17/18, 13-0
Did the water level drop
1/8” OR MORE?
No No
UDC Hydro Test Result Pass Pass
GENERAL COMMENTS
about UDC Sump Hydrostatic Testing
D3/4 failed the first hydrostatic test. D3/4 was tested hydrostatically a second time and maintained the water level at 14-5/16 inches.
Piping Connector in UDC Flex Flex
Piping Connector Mfgr DoubleTrac DoubleTrac
Piping Connector Model Not provided about Dispensers
SHEAR VALVE INFORMATION
PRODUCT
Regular Unleaded
/ 87 Premium
Unleaded / 91 Diesel
Shear Valve Manufacturer OPW OPW OPW
Shear Valve Model 10P 10P 10P
Quantity of Shear Valves per dispenser
1 in each dispenser
1 in each dispenser
1 but only 6 dispensers
Checked functionality of at least one shear valve per product
No (see comment below)
No (see comment below)
No (see comment below)
Provide reason if shear valves were not checked
No metal test can onsite
Dispenser(s) where shear valves were checked
N/A
Functionality Test Results N/A
Shear Valves were securely anchored
Yes Yes Yes about Shear Valves
RELEASE DETECTION INFORMATION
Per R18-12-220. Performance Standards for New UST Systems (A)
Owners and operators of a new UST system shall meet the requirements described in this Section in order to prevent releases due to structural failure, corrosion, or spills and overfills for as long as the UST system is used to store regulated substances. In addition, except for suction piping that meets the requirements of R18-12-241(C)(2)(a) through (e), tanks and piping installed or replaced after January 1, 2009 shall be secondarily contained and use interstitial monitoring in accordance with R18-12-243(G). Secondary containment shall be able to contain regulated substances leaked from the primary containment until they are detected and removed and prevent the release of regulated substances to the environment at any time during the operational life of the UST system. For cases where the piping to be replaced exceeds the percentage in A.R.S. § 49-1009(C), the entire piping run shall be secondarily contained.
Tank ID # 8 9A 9B
Product Regular
Unleaded / 87 Premium
Unleaded / 91 Diesel
Automatic Tank Gauge (ATG) Yes
ATG Console condition New
ATG Manufacturer Franklin Fueling
ATG Model TS-550EVO
ATG Serial Number M402219405
If using existing ATG console, list console upgrades
N/A
Tank Annular Space Wet Annular
Tank Interstitial Monitoring
(IM)
Yes
TANK IM SENSOR Model TS-3WSNS
ATG Probe Condition New
ATG Probe Model FMP-LL3-131-I
ATG Probe Serial Number M4-7117553 M4-7117358 M4-7117362
Line Leak Detector Info Information listed in ANCILLARY EQUIPMENT INFORMATION
Piping Leak Detection Method Double-wall & Sumps w/Sensor
PIPING Interstitial Monitoring Yes
PIPING IM SENSORS used in All Sumps Manufacturer Franklin Fueling Model FMP-ULS
Quantity 12 Type Connected to ATG
PIPING IM SENSORS used in Choose an item.
Manufacturer Model
Quantity Type Choose an item.
PIPING IM SENSORS used in Choose an item.
Manufacturer Model
Quantity Type Choose an item.
PIPING IM SENSORS used in Choose an item.
Manufacturer Model
Quantity Type Choose an item.
PIPING IM SENSORS used in Choose an item.
Manufacturer Model
Quantity Type Choose an item.
Do all IM sensors rest on the base of the sump?
Yes Are all IM sensors at the lowest point of the sump?
Yes
Are all IM sensors mounted in a true vertical position?
Yes
Are jumpers used to connect sections of secondary containment of the piping
Yes
The secondary containment of the piping is open in
STP sump
Method used to open the secondary containment of the piping stems removed from schrader valves
FINAL INSPECTION SYSTEM TESTING INFORMATION
Tank ID # 8 9A 9B
Product Regular
Unleaded / 87 Premium
Unleaded / 91 Diesel
TANK TIGHTNESS Test
Date 04/20/2023
Tank Tightness Test Results Pass Pass Pass
LINE TIGHTNESS Test Date 04/20/2023
Line Tightness Test Result Pass Pass Pass
LINE LEAK DETECTOR
Test Date 04/20/2023
Line Leak Detector Test Results
Pass Pass Pass
OVERFILL PREVENTION
Device Test Date 04/20/2023
Overfill Prevention Device Test Result
Pass Pass Pass
LEAK DETECTION SYSTEM Test Date 04/20/2023
Leak Detection System Test Result Pass
MONITORING CERTIFICATION Date 04/20/2023
Monitoring Certification Result Pass
TESTING COMPANY Fuller Petroleum Services Inc.
Items Tested Tanks, lines, ATG, overfill.
Testing Company Address 2210 E Rose Garden Loop, Phoenix, AZ 85024
Testing Technician Steve Scoma ADEQ Testing Certification # T00113
Technician’s Email dbenham@fullerpetro.com Primary Phone # (602) 923-1500
TESTING COMPANY
Items Tested
Testing Company Address
Testing Technician ADEQ Testing Certification #
Technician’s Email Primary Phone # about system testing
OWNER / OPERATOR REPRESENTATIVE
During the final inspection, the Inspector explained the UST system, testing, and release detection requirements to the Owner/Operator’s representative.
Owner Contact Name Contact Title
Owner Contact Email Contact Phone #
Signature Date
GENERAL COMMENTS
about release detection and IM sensors
PRE-BURIAL TANK GENERAL COMMENTS
Dave…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .