Exhibit B - Modification Inspection Report.docx
DOCX document 237 KB Posted
- Attached to
- Master Agreement AZ|CTR067133
- Contract number
- CTR067133
- Issued by
- Arizona
About this file
This document is an Exhibit B Modification Inspection Report from the Arizona Department of Environmental Quality (ADEQ) for an Underground Storage Tank (UST) system modification. The report is a comprehensive inspection form designed to document detailed technical specifications, modifications, and compliance testing for underground storage tank systems, focusing on various components such as spill buckets, piping, dispensers, sumps, and release detection equipment.
The inspection report covers technical details of UST system modifications, including assessments of tank types, materials, corrosion protection, secondary containment, leak detection methods, and compliance with federal and state regulations (specifically 40 Code of Federal Regulations and Arizona Revised Statutes). The document meticulously tracks installation, testing, and verification of each UST system component, with specific attention to pressure tests, hydrostatic testing, interstitial monitoring, and ensuring compatibility with stored regulated substances. Key regulatory requirements include secondary containment standards, release detection protocols, and performance standards for new UST systems, with particular emphasis on preventing environmental contamination and ensuring system integrity.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BPM005267 Exhibit B
UST MODIFICATION INSPECTION REPORT
ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY
1110 West Washington Street, Phoenix, Arizona 85007 ADEQ Help Line (In-State Only) 1-800-234-5677
| INSPECTION INFORMATION |
| ADEQ Plan # |
| MD |
| Type(s) of Modification |
| ☐ Spill Bucket(s) |
☐ Overfill Prevention Device ☐ STP Sump(s) ☐ Piping ☐ Dispensers ☐ UDC Sumps(s) ☐ Entry Boots ☐ Other:
Reason for Modification
Closure of Existing System Components Date
Arrival Time
Departure Time
Pre-Burial Date
Arrival
Departure Time
Final Installation Date
Arrival
Departure Time
FACILITY INFORMATION
Facility Name
| ADEQ Facility ID |
| 0-0 |
Facility Address
City & ZIP
| Facility County | |
| Choose an item. | |
| Tank Usage | |
| Choose an item. | Facility Status |
| Choose an item. | |
| OWNER INFORMATION |
UST Owner Name
Mailing Address
Owner Contact Name
Contact Title
Owner Contact Email
Contact Phone #
| Owner Type |
| Choose an item. |
SERVICE PROVIDER INFORMATION
Service Provider Company
Service Provider Address
Primary Contact
Position
Email Address
Primary Phone #
ENVIRONMENTAL COMPANY INFORMATION
Environmental Company
Company Address
Registered Professional
Office Phone #
Registered Professional Email
Primary Phone #
On-Site Rep Name / Title
On-Site Rep Email Address
Primary Phone #
Additional On-Site Personnel
| Documented Depth to Groundwater? |
| ‘ BGS |
AZDEQ REPRESENTATIVE INFORMATION
AZDEQ Representative
AZDEQ Rep Title
| @azdeq.gov |
| Phone Number |
Accompanied by
Title
UST INFORMATION - Complete one column for each compartment
Tank ID #
| Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Tank Gallon Capacity |
| Compartmentalized Tank | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Compartment Sizes |
| Manifolded Tank | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Manifolded with (T#) |
| Method of Manifold |
| ☐ Vent lines |
☐ Product Lines ☐ Siphon Line ☐ Vent lines ☐ Product Lines ☐ Siphon Line ☐ Vent lines ☐ Product Lines ☐ Siphon Line ☐ Vent lines ☐ Product Lines ☐ Siphon Line ☐ Vent lines ☐ Product Lines ☐ Siphon Line
Location of Manifold
Tank Manufacturer
| Tank Wall Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Tank Material Construction | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Tank Corrosion Protection | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Annular Space | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| COMMENTS |
Complete for the installation or replacement of SPILL BUCKET(s) & ANCILLARY EQUIPMENT Complete one column for each containment sump
Tank ID #
| Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| EXISTING SPILL BUCKET & ANCILLARY EQUIPMENT |
Manufacturer & Model
| Spill Containment Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| If Double Wall, |
type of gauge
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Spill Containment |
Size (Gallons)
Fill Cap / Adapter Manufacturer & Model
| Overfill Device | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Does UST have both |
ball float and flapper?
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Vapor Recovery |
Cap / Adapter Manufacturer & Model
REPLACEMENT SPILL BUCKET & ANCILLARY EQUIPMENT
Manufacturer & Model
| Spill Containment Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| If Double Wall, |
type of gauge
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Spill Containment |
Size (Gallons)
Reference: PEI/RP100-17, Section 7.2: SPILL CONTAINMENT
Spill Containment Integrity Test Date
| Spill Containment Integrity Test Method | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Spill Containment was tested according to | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Is water within 1.5 inches of the top of the spill bucket? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| PRE-test Height |
POST-test Height
| Did the water level drop 1/8 inch or MORE | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Was a 30-inch water column of vacuum attained to start the test? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Is the ending vacuum level 26 inches water column or greater? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Spill Containment Integrity Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Fill Cap / Adapter Manufacturer & Model |
| Overfill Device | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Overfill Device Condition | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Does UST have both |
ball float and flapper?
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Vapor Recovery |
Cap / Adapter Manufacturer & Model
COMMENTS
Complete for the installation or replacement of STP SUMP(s) & ANCILLARY EQUIPMENT Complete one column for each STP sump
Tank ID #
| Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| EXISTING STP SUMP & ANCILLARY EQUIPMENT |
STP Containment Sump Manufacturer
STP Containment Sump Model
| STP Sump Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| If Double Wall, |
Type of annular space
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| If Double Wall, |
Type of IM sensor
Entry Boot Manufacturer
REPLACEMENT STP CONTAINMENT SUMP & ANCILARY EQUIPMENT
STP Containment Sump Manufacturer
STP Containment Sump Model
| STP Sump Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| If Double Wall, |
Type of annular space
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| If Double Wall, |
Manufacturer of IM sensor
If Double Wall, Model of IM sensor
Entry Boot Manufacturer
Entry Boot Model
Adhesive Manufacturer & Product Name
| Adhesive Compatible with Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Reference: PEI/RP100-17, Section 8.5.4: CONTAINMENT SUMP TESTING. |
STP Containment Hydrostatic Test Date
| Is the water a minimum of 4 inches above the highest wall penetration? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| PRE-test Height |
POST-test Height
| Did the water level drop 1/8 inch or MORE | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| STP Containment Hydrostatic Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| GENERAL COMMENTS about STP Containment Sump Hydrostatic Testing |
Tank ID #
| Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| STP Turbine Manufacturer |
STP Turbine Model
| Line Leak Detector Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| STP Piping Connector | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| STP Corrosion Protection | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| STP Equipment Compatible with Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
COMMENTS regarding STP SUMP and ANCILLARY EQUIPMENT
Complete for the replacement or addition of PIPING Complete one column for each PRODUCT
Tank ID #
| Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| EXISTING PIPING INFORMATION |
| Existing Piping System Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Existing Piping Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Existing Piping Wall Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Existing Piping Material | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| (a): Length of existing piping |
| (b): Length of piping to be removed |
| - |
| - |
| - |
| - |
| - |
| (c): Length of replacement piping |
| + |
| + |
| + |
| + |
| + |
| (d): Length of new piping being added to the system |
| + |
| + |
| + |
| + |
| + |
(e): Length of piping after modification/s:
(a) – (b) + (c) + (d)
| = |
| = |
| = |
| = |
| = |
(f): total length for replacement and new piping: (c) + (d)
(g): Percentage of new piping to total linear feet of all connected piping:
divide (f) by (a)
| % |
| % |
| % |
| % |
| % |
If the Existing Piping System Type is pressurized, and the Existing Piping Type is underground, and the Existing Piping Wall Type is single wall, and (g) is 50% or more, the existing piping must be brought into compliance with the secondary containment and release detection requirements for hazardous substance underground storage tank systems in 40 Code of Federal Regulations section 280.42 and the interstitial monitoring requirements in 40 Code of Federal Regulations section 280.43, subsection G
A.R.S. 49-1009 Tank Performance Standards (C) – Beginning January 1, 2009, a personal shall not install a new piping component that is twenty-five percent or more of the total linear footage of all connected piping of the underground storage tank unless all connected piping of the underground storage tank that conveys a regulated substance under pressure is brought into compliance with the secondary containment and release detection requirements for hazardous substance underground storage tank systems in 40 Code of Federal Regulations section 280.42 and the interstitial monitoring requirements in 40 Code of Federal Regulations section 280.43, subsection G. [THIS REQUIREMENT WAS UPDATED IN AZ HB 2043.]
AZ HB 2043 requires an underground storage tank system (UST) to comply with certain federal performance standards in effect on January 1, 2020, and requires the following to comply with the secondary containment performance standards for new USTs and release detection requirements for interstitial monitoring in 40 Code of Federal Regulations Section 280.43(g) and in effect on January 1, 2020:
(a) newly installed USTs; and
(b) any newly installed piping component that is 50% or more of the total linear footage of all connected piping in the UST and conveys a regulated substance.
NEW or REPLACEMENT PIPING INFORMATION
| Piping Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Piping Wall Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Piping Material | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Piping Manufacturer |
Adhesive (Glue) Brand
| Is Piping Compatible with Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Pressure Test Date |
PRIMARY
Test Pressure at START of Pressure Test
| psi |
| psi |
| psi |
| psi |
| psi |
PRIMARY
Test Pressure at END of Pressure Test
| psi |
| psi |
| psi |
| psi |
| psi |
PRIMARY
Pressure Test Results
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Pressure Test Date |
SECONDARY
Test Pressure at START of Pressure Test
| psi |
| psi |
| psi |
| psi |
| psi |
SECONDARY
Test Pressure at END of Pressure Test
| psi |
| psi |
| psi |
| psi |
| psi |
SECONDARY
Pressure Test Results
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| COMMENTS |
Complete for the addition or replacement of DISPENSERS or UNDER-DISPENSER CONTAINMENT SUMPS
EXISTING DISPENSER EQUIPMENT (BEFORE modification)
| Dispenser Description | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Number of Dispensers |
Dispenser Manufacturer (if available)
Dispenser Model
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| UDC Sump Manufacturer |
UDC Sump Model
| UDC Sump Wall Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| UDC Sump Constr Material | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. |
| Piping Connector in UDC |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
Piping Connector Mfgr
Shear Valve Manufacturer
Shear Valve Model
Quantity of Shear Valves
40 CFR 280.20(f) Dispenser systems. Each UST system must be equipped with under-dispenser containment for any new dispenser system installed after April 11, 2016.
(1) A dispenser system is considered new when both the dispenser and the equipment needed to connect the dispenser to the underground storage tank system are installed at an UST facility. The equipment necessary to connect the dispenser to the underground storage tank system includes check valves, shear valves, unburied risers or flexible connectors, or other transitional components that are underneath the dispenser and connect the dispenser to the underground piping.
(2) Under-dispenser containment must be liquid-tight on its sides, bottom, and at any penetrations. Under-dispenser containment must allow for visual inspection and access to the components in the containment system or be periodically monitored for leaks from the dispenser system.
NEW or REPLACEMENT DISPENSER EQUIPMENT (AFTER modifications)
| Dispenser Description | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Number of Dispensers |
Dispenser Manufacturer
Dispenser Model
| Dispenser Condition | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Product at Dispenser | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| UDC Sump Manufacturer |
UDC Sump Model
| UDC Sump Wall Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| UDC Sump Constr Material | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. |
Entry Boot Manufacturer
Entry Boot Model
Adhesive Manufacturer & Product Name
| Adhesive Compatible with Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Piping Connector in UDC | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. | ||||
| Choose an item. |
Piping Connector Mfgr
Piping Connector Model
Shear Valve Manufacturer
Shear Valve Model
Quantity of Shear Valves
COMMENTS
| SAMPLING OF PIPING and DISPENSING AREAS |
| DISPENSERS |
| PIPING |
| Is water present beneath the piping or dispensers? | |
| Choose an item. | Choose an item. |
| Is sheen or free product observed beneath the piping or dispensers? | |
| Choose an item. | Choose an item. |
| If water or sheen is present, was the water sampled? | |
| Choose an item. | Choose an item. |
| Documented number of water samples collected in the Piping and Dispensing Area |
| If groundwater is present in the piping and dispensing areas, were soil samples collected from native soils along the excavation walls at the soil-water interface? | |
| Choose an item. | Choose an item. |
| Bedrock or Caliche encountered beneath the piping or dispensers? | |
| Choose an item. | Choose an item. |
| If bedrock or caliche was encountered beneath the piping or dispensers, were samples of fine grained backfill material collected? | |
| Choose an item. | Choose an item. |
| X’ from grade to native soil in piping and dispensing areas. | |
| ‘ BGS | |
| ‘ BGS |
| Time between removing the piping and sampling |
| N/A |
| Were soil samples collected every 20 linear feet? | |
| Choose an item. | Choose an item. |
| Were soil samples collected in native soil beneath each elbow, joint, fitting, dispenser, ancillary equipment, and area of corrosion? | |
| Choose an item. | Choose an item. |
| Were multi-depth samples collected in the piping and dispensing areas? | |
| Choose an item. | Choose an item. |
| Range of documented sample collection depths beneath the piping and dispensers | |
| From ‘ BGS to |
‘ BGS
From ‘ BGS to
‘ BGS
| Documented number of soil samples collected beneath dispensers and piping |
| Dispensers: |
| Piping: |
| The LOWEST PID reading of a sample collected in the piping and dispensing areas |
| ppm |
‘ BGS
ppm
‘ BGS
| The HIGHEST PID reading of a sample collected in the piping and dispensing areas |
| ppm |
‘ BGS
ppm
‘ BGS
| Evidence of Release in the Piping and Dispensing Areas? (add comments below) |
| ☐ NONE |
☐ Stained Soil ☐ Odor ☐ Elevated PID reading ☐ Vapor ☐ Sheen ☐ Free Product on Groundwater
☐ NONE
☐ Stained Soil ☐ Odor ☐ Elevated PID reading ☐ Vapor ☐ Sheen ☐ Free Product on Groundwater
| Additional soil samples were collected below the initial set of samples where Evidence of Release occurred (add comments below) | |
| Choose an item. | Choose an item. |
| Inspector & consultant discussed collecting dual depth samples at each sampling location | |
| Choose an item. | |
| Inspector & consultant discussed the use of PID meter to field assess each soil sample | |
| Choose an item. | |
| Inspector & consultant coordinated sampling locations prior to collecting samples | |
| Choose an item. | |
| Sample Preservation Method | |
| Choose an item. | |
| Are required analytical laboratory methods for soil and/or groundwater samples accounted for on sample Chain-of-Custody? | |
| Choose an item. | |
| Comments regarding Sampling and/or Evidences of Release in the Piping and Dispensing Area |
UDC & TRANSITION SUMP HYDROSTATIC TESTING
Reference: PEI/RP100-17, Section 8.5.4: CONTAINMENT SUMP TESTING.
SUMP Designation
Hydro Test Date
| Is the water a minimum of 4 inches above the highest wall penetration? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| PRE-test Height |
POST-test Height
| Did the water level drop 1/8 inch or MORE? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Hydro Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| SUMP Designation |
Hydro Test Date
| Is the water a minimum of 4 inches above the highest wall penetration? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| PRE-test Height |
POST-test Height
| Did the water level drop 1/8 inch or MORE? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Hydro Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| SUMP Designation |
Hydro Test Date
| Is the water a minimum of 4 inches above the highest wall penetration? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| PRE-test Height |
POST-test Height
| Did the water level drop 1/8 inch or MORE? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Hydro Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| SUMP Designation |
Hydro Test Date
| Is the water a minimum of 4 inches above the highest wall penetration? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| PRE-test Height |
POST-test Height
| Did the water level drop 1/8 inch or MORE? | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Hydro Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| COMMENTS regarding UDC Sump Hydrostatic Testing |
RELEASE DETECTION INFORMATION
Per R18-12-220. Performance Standards for New UST Systems (A) Owners and operators of a new UST system shall meet the requirements described in this Section in order to prevent releases due to structural failure, corrosion, or spills and overfills for as long as the UST system is used to store regulated substances. In addition, except for suction piping that meets the requirements of R18-12-241(C)(2)(a) through (e), tanks and piping installed or replaced after January 1, 2009 shall be secondarily contained and use interstitial monitoring in accordance with R18-12-243(G). Secondary containment shall be able to contain regulated substances leaked from the primary containment until they are detected and removed and prevent the release of regulated substances to the environment at any time during the operational life of the UST system. For cases where the piping to be replaced exceeds the percentage in A.R.S. § 49-1009(C), the entire piping run shall be secondarily contained.
Tank ID #
| Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Automatic Tank Gauge (ATG) | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| ATG Manufacturer |
ATG Model
| Tank Annular Space | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Tank Interstitial Monitoring (IM) | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Tank IM Sensor Model |
ATG Probe Model
| Piping Leak Detector Type | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Piping IM | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Line Leak Detection Method | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Piping IM Sensors used in | ||||
| Choose an item. | Manufacturer |
Model
| Piping IM Sensors used in | |
| Choose an item. | Manufacturer |
Model
| Piping IM Sensors used in | |
| Choose an item. | Manufacturer |
Model
| Piping IM Sensors used in | |
| Choose an item. | Manufacturer |
Model
| Do all IM sensors rest on the base of the sump? | ||||
| Choose an item. | Are all IM sensors at the lowest point of the sump? | |||
| Choose an item. | Are all IM sensors mounted in a true vertical position? | |||
| Choose an item. | ||||
| Are jumpers used to connect sections of secondary containment of the piping | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| The secondary containment of the piping is open in | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Method used to open the secondary containment of the piping | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| GENERAL COMMENTS |
about release detection and IM sensors
FINAL INSPECTION SYSTEM TESTING INFORMATION
Complete the items directly related to the modifications.
Tank ID #
| Product | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Line Tightness Test Date |
| Line Tightness Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Line Leak Detector |
Test Date
Line Leak Detector Test Results
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Overfill Prevention Device Test Date |
| Overfill Prevention Device Test Result | ||||
| Choose an item. | Choose an item. | Choose an item. | Choose an item. | Choose an item. |
| Leak Detection System Test Date |
| Leak Detection System Test Results |
| Choose an item. |
| Monitoring Certification Date |
| Monitoring Certification Result |
| Choose an item. |
| Testing Company |
Testing Company Address
Testing Technician
ADEQ Testing Certification #
Technician’s Email
Primary Phone #
GENERAL COMMENTS about system testing
CLOSURE INSPECTION GENERAL COMMENTS
Service Provider’s Name
ADEQ Certification #
Service Provider’s Email
Primary Phone
Service Provider’s Signature
Date
Inspector’s Name
Inspector’s Email
Primary Phone
Inspector’s Signature
Date
PRE-BURIAL INSPECTION GENERAL COMMENTS
_______ I (the service provider) have personally verified that all UST system components installed for this inspection are compatible with the fuels that will be stored and are installed according to manufacturers’ instructions and the applicable installation standards and codes of practice in R18-12-220 and R18-12-281.
Concluded inspection. Debriefed service provider. Finalized report. Submitted report from site.
Service Provider’s Name
ADEQ Certification #
Service Provider’s Email
Primary Phone
Service Provider’s Signature
Date
Inspector’s Name
Inspector’s Email
Primary Phone
Inspector’s Signature
Date
FINAL INSPECTION GENERAL COMMENTS
_______ I (the service provider) have personally verified that all UST system components installed for this inspection are compatible with the fuels that will be stored and are installed according to manufacturers’ instructions and the applicable installation standards and codes of practice in R18-12-220 and R18-12-281.
Concluded inspection. Debriefed service provider. Finalized report. Submitted report from site.
Service Provider’s Name
ADEQ Certification #
Service Provider’s Email
Primary Phone
Service Provider’s Signature
Date
Inspector’s Name
Inspector’s Email
Primary Phone
Inspector’s Signature
Date
Modification Inspection, Page 15
PHOTO LOG FOR
image2.png image1.png oleObject1.bin
File details come from the government source that posted it. Updated .