Exhibit E SB Participation Commitment Doc.docx

DOCX document 52 KB Posted

Attached to
Alert Facility and Alert Apron Federal contract opportunity
Solicitation number
N69450-20-R-0129
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This Small Business Participation Commitment Document outlines the subcontracting commitments for the Alert Facility and Alert Apron project at NAS JRB New Orleans. The solicitation requires the construction of an Aerospace Control Alert Facility, Alert Apron, aircraft shelters, aircrew alert quarters, and other support structures. Offerors must provide percentages of the total contract value that will be awarded as subcontracts to small businesses, including minimum targets of 20% for total small business and 5% each for HUBZone, women-owned, veteran-owned, and service-disabled veteran-owned small businesses. Construction is to be completed within 1300 calendar days of award of a firm-fixed price contract between $25 million and $100 million by the Department of the Navy Naval Facilities Engineering Command. The solicitation is unrestricted and open to all responsible sources.

View the file

Other files for this federal contract opportunity

Other files attached to Alert Facility and Alert Apron, newest first.
File Type Posted
C511 STORM DRAINAGE DETAILS_Amd06_2020-10-21.pdf PDF
N6945020R0129_0005.pdf PDF
Amd_0004_CLINS.pdf PDF
PROJECT TOC Amendment 0003.pdf PDF
ESD106 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
32 11 20 Amendment 0003.pdf PDF
ESD107 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
32 12 16 Amendment 0003.pdf PDF
N6945020R0129_0003.pdf PDF
E506 - ELECTRICAL DETAILS_Amd0003_2020-10-06.pdf PDF
E505 - ELECTRICAL DETAILS_Amd0003_2020-10-06.pdf PDF
ESD105 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
G003 - OVERALL PROJECT MAP_Amd0003_2020-10-06.pdf PDF
A351 - SHELTER_1 BUILDING SECTIONS Amd 0002.pdf PDF
P402 - ENLARGED CREW SANITARY PLAN SOUTH Amd 0002.pdf PDF
CA200 - APRON GEOMETY AND UTILITY PLAN Amd 0002.pdf PDF
A602 - DOOR_WINDOW_LOUVER DETAILS Amd 0002.pdf PDF
S154 - SHELTER_2 SLAB PLAN Amd 0002.pdf PDF
10 51 13 Amendment 0002.pdf PDF
01 30 01_00 22 Amendment 0002.pdf PDF
13 34 19 Amendment 0002.pdf PDF
A353 - SHELTER WALL SECTIONS Amd 0002.pdf PDF
C401 - GRADING AND DRAINAGE PLAN Amd 0002.pdf PDF
A201 - ACQ_ECP EXTERIOR ELVATIONS Amd 0002.pdf PDF
A701 - FINISH LEGEND AND SCHEDULE Amd 0002.pdf PDF
01 35 13 Amendment 0002.pdf PDF
C101 - EXISTING CONDITIONS AND SURCHARGE SITE PLAN Amd 0002.pdf PDF
PROJECT TOC Amendment 0002.pdf PDF
A601 - DOOR - WINDOW ELEVATIONS_DOOR SCHEDULE Amd 0002.pdf PDF
S152 SHELTER _1 SLAB PLAN_Amd01_2020-09-14.pdf PDF
P403 ENLARGED CREW PIPING PLAN NORTH_Amd01_2020-09-14.pdf PDF
E503 ELECTRICAL DETAILS_Amd01_2020-09-14.pdf PDF
N6945020R0129_Amendment_0001.pdf PDF
P502 PLUMBING DETAILS_Amd01_2020-09-14.pdf PDF
P402 ENLARGED CREW SANITARY PLAN SOUTH_Amd01_2020-09-14.pdf PDF
ES109 ELECTRICAL SITE PLAN - NEW WORK_Amd01_2020-09-14.pdf PDF
P401 ENLARGED CREW SANITARY PLAN NORTH_Amd01_2020-09-14.pdf PDF
P104 OVERALL SHELTER 2 PLUMBING PLAN_Amd01_2020-09-14.pdf PDF
ES107 ELECTRICAL SITE PLAN - NEW WORK_Amd01_2020-09-14.pdf PDF
B-3 RQLH059034 NORTHCOM Construct Alert Apron Drawings.pdf PDF
Attachment B_COVID-19 Screening Questionnaire.pdf PDF
Exhibit C Safety Data Sheet.docx DOCX document
Exhibit D Historical SB Utilization.docx DOCX document
B-3 NORTHCOM Construct Alert Spec.pdf PDF
Exhibit F Small Business Subcontracting Plan.doc DOC document
N6945020R0129.pdf PDF
Attachment A_ProjNet_How To Guide.pdf PDF
B-3 RQLH189009 NORTHCOM Construct Alert Facility Drawings.pdf PDF
Exhibit B Past Performance Questionnaire.docx DOCX document
Exhibit A Construction Experience Project Data Sheet.docx DOCX document
Show all 50

Alert Facility and Alert Apron has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT E

SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD)

N69450-20-R-0129

This form is to be completed by all Offerors (both large and small businesses) in order to provide supporting information for evaluation of Factor 4, Small Business Utilization and Participation. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

1. Offeror Info:

Offeror Name:
Applicable size category for the Offeror under the NAICS Code identified (check one):
Large Business (LB) ☐

Small Business (SB) ☐

If the Offeror is a Small Business, check all socioeconomic categories that apply to the Offeror.

If none of the socioeconomic categories apply to the Offeror, check NONE:

Historically Underutilized Business Zone Small Business (HUBZone SB) ☐ Woman-Owned Small Business (WOSB) ☐ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) ☐ Small Disadvantaged Business (SDB) ☐ Veteran-Owned Small Business (VOSB) ☐ Service-Disabled Veteran-Owned Small Business (SDVOSB) ☐

NONE ☐

2. Subcontracting Breakdown:

a. Total contract value (sum of b + c):
$
100%
b. Estimated value of all planned subcontracting (inclusive of all planned subcontracting to all businesses, regardless of size):
$
% of 2.a
c. Estimated value of all work to be self-performed by Offeror’s workforce:
$
% of 2.a

3. Subcontracts for products and services to be awarded under this contract:

a. Large Business:

Name of Subcontractor
Type and Complexity of Product/Service
Type of Commitment to Subcontractor:
Estimated Subcontract Value
Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

This number represents total planned subcontracting dollars under this contract that will go to subcontractors who are Large Business concerns.
$

b. Small Business:

Name of Subcontractor
Type and Complexity of Product/Service
Type of Commitment to Subcontractor:
Estimated Subcontract Value
Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

1. This number represents total planned subcontracting dollars under this contract that will go to subcontractors who are Small Business concerns (includes all SB, HUBZone SB, WOSB/EDWOSB, SDB, VOSB, and SDVOSB concerns); Historically Black Colleges, Universities, and Minority Institutions (HBCU/MI); AbilityOne participating non-profit agencies for the blind or severely disabled; and Alaskan Native Corporations (ANCs) and Indian Tribes as prescribed in FAR 19.703(c) & FAR 52.219-9.
$
2. If the Offeror is a Small Business concern, enter the dollar amount that the Offeror will self-perform (line 2.c).
$
3. Total planned dollars under this contract that will go to SB concerns (sum of 3.b.1 + 3.b.2):
$
4. Total proposed small business participation rate (in terms of percentage of total contract value):
% of 2.a

All Offerors provide a detailed explanation supporting the total small business participation rate (methods used to develop the rate):

All Offerors who are not able to meet the minimum total small business participation rate (20% of the total contract value) shall provide a detailed explanation why the minimum total small business participation rate cannot be achieved:

c. HUBZone SB:

Name of Subcontractor
Type and Complexity of Product/Service
Type of Commitment to Subcontractor:
Estimated Subcontract Value
Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

1. This number represents total planned subcontracting dollars under this contract that will go to subcontractors who are qualified HUBZone SB concerns certified by the Small Business Administration (SBA).
$
2. If the Offeror is a HUBZone SB concern, enter the dollar amount that the Offeror will self-perform (line 2.c).
$
3. Total planned dollars under this contract that will go to HUBZone SB concerns (sum of 3.c.1 + 3.c.2):
$
4. Total proposed HUBZone SB participation rate (in terms of percentage of total contract value):
% of 2.a

d. WOSB/EDWOSB:

Name of Subcontractor
Type and Complexity of Product/Service
Type of Commitment to Subcontractor:
Estimated Subcontract Value
Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

1. This number represents total planned subcontracting dollars under this contract that will go to subcontractors who are small business concerns 51% owned and controlled by one or more women.
$
2. If the Offeror is a WOSB/EDWOSB concern, enter the dollar amount that the Offeror will self-perform (line 2.c).
$
3. Total planned dollars under this contract that will go to WOSB/EDWOSB concerns (sum of 3.d.1 + 3.d.2):
$
4. Total proposed WOSB/EDWOSB participation rate (in terms of percentage of total contract value):
% of 2.a

e. SDB:

Name of Subcontractor
Type and Complexity of Product/Service
Type of Commitment to Subcontractor:
Estimated Subcontract Value
Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

1. This number represents total planned subcontracting dollars under this contract that will go to subcontractors who are small business concerns owned and controlled by one or more socially and economically disadvantaged individuals (include in this category the planned subcontracting dollars to HBCU/MIs, and the planned subcontracting dollars to ANCs and Indian Tribes).
$
2. If the Offeror is a SDB concern, enter the dollar amount that the Offeror will self-perform (line 2.c).
$
3. Total planned dollars under this contract that will go to SDB concerns (sum of 3.e.1 + 3.e.2):
$
4. Total proposed SDB participation rate (in terms of percentage of total contract value):
% of 2.a

f. VOSB:

Name of Subcontractor
Type and Complexity of Product/Service
Type of Commitment to Subcontractor:
Estimated Subcontract Value
Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

1. This number represents total planned subcontracting dollars under this contract that will go to subcontractors who are small business concerns 51% owned and controlled by one or more qualifying veterans (include in this category the planned subcontracting dollars to SDVOSB concerns shown in 3.g below).
$
2. If the Offeror is a VOSB concern, enter the dollar amount that the Offeror will self-perform (line 2.c).
$
3. Total planned dollars under this contract that will go to VOSB concerns (sum of 3.f.1 + 3.f.2):
$
4. Total proposed VOSB participation rate (in terms of percentage of total contract value):
% of 2.a

g. SDVOSB:

Name of Subcontractor
Type and Complexity of Product/Service
Type of Commitment to Subcontractor:
Estimated Subcontract Value
Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

Teaming Agreement (TA)

☐YES ☐ NO

Date of Agreement:

Letter of Commitment ☐YES ☐ NO Date of the LOC:

Other Type of Commitment:

☐YES ☐ NO

Other Commitment Date:

DUNS NUMBER

1. This number represents total planned subcontracting dollars under this contract that will go to subcontractors who are small business concerns 51% owned and controlled by one or more qualifying service-disabled veterans.
$
2. If the Offeror is a SDVOSB concern, enter the dollar amount that the Offeror will self-perform (line 2.c).
$
3. Total planned dollars under this contract that will go to SDVOSB concerns (sum of 3.g.1 + 3.g.2):
$
4. Total proposed SDVOSB participation rate (in terms of percentage of total contract value):
% of 2.a

4. If the Offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance.

Notes:

(1) Lines 2.b + 2.c = 100% of Line 2.a

(2) Lines 3.a + 3.b.1 = 100% of Line 2.b

(3) Subcontracts to companies that qualify in multiple categories of SB must be reported under each category. For example: if you are planning to subcontract $100,000 to company ABC, a woman-owned, small disadvantaged business that is also a certified HUBZone SB, you will report $100,000 in block 3.b (SB), 3.c (HUBZone SB), 3.d (WOSB) and 3.e (SDB).

(4) The sum of 3.c.1 through 3.g.1 does not automatically equate to the value of line 3.b.1.

(5) Designated HUBZone SB concerns must be certified by SBA.

(6) Large business Offerors selected for award shall be required to submit an acceptable Small Business Subcontracting Plan incorporating the proposed subcontract values and any specifically identified small business concerns. The Small Business Subcontracting Plan shall also include small business subcontracting goals that meet or exceed the minimum small business subcontracting targets stated in the solicitation. If the Offeror fails to negotiate an acceptable subcontracting plan, the Offeror will be ineligible for award.

(7) This form may be expanded as needed.

Attachment Y – Small Business Participation Commitment Document Page 2 of 4

(Rev 4/2020)

File details come from the government source that posted it. Updated .