Exhibit E - AHA Example ENG Form 6206.pdf

PDF 28 KB Posted

Attached to
Cave Run Lake Slush Grout - Construction
Solicitation number
W912QR25QA037
Issued by

About this file

This appears to be a placeholder PDF document displaying a technical loading message for Adobe Reader, containing instructions for upgrading PDF viewing software. The document does not contain substantive contract or solicitation details related to the Cave Run Lake Slush Grout - Construction federal contract opportunity (Solicitation Number W912QR25QA037) from the Department of the Army Corps of Engineers Engineering District Louisville. No specific contract, procurement, or project information can be extracted from this file.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITIONS ARE OBSOLETE.

Page of

LRL FORM 1259, JAN 2023

U.S. Army Corps of Engineers, Louisville District

ACTIVITY HAZARD ANALYSIS (AHA)

The proponent agency is CELRL-SO.

Gloves 05.A.08 Gloves Safety Glasses 05.B.01 Safety Glasses Hard Hat 05.D.01 Hard Hat Fall Protection 05.H Fall Protection Safety Boot 05.E Safety Boot Reflective Vests 05.F Reflective Vest

E = EXTREMELY HIGH RISK H = HIGH RISK

P r o b a b i l i t y

M = MODERATE RISK L = LOW RISK

FREQUENT

Continuously experiences or occurs very often. Likely to occur often in the life of an item with a probability of occurrence greater than 10-1 in that life.

LIKELY

Occurs frequently. Several times in the life of an item with a probability of occurrence less than 10-1 but greater than 10-2 in that life.

OCCASIONAL

Occurs several times. Likely to occur some time in the life of an item with a probability of occurrence less than 10-2 but greater than 10-3 in that life.

SELDOM

Unlikely but can reasonably be expected to occur. Unlikely but possible to occur in the life of an item with a probability of occurrence less than 10-3 but greater than 10-6 in that life.

UNLIKELY

Unlikely to occur but possible. So unlikely, it can be assumed occurrence may not be experienced with a probability of occurrence less than 10-6 in that life.

Catastrophic Could result in death or permanent total disability (accident risk). Loss of major system or equipment. Major property (facility) damage exceeding $1M. Severe or irreversible environmental damage that violates law or regulation.

E E H H M Critical Could result in permanent partial disability, injuries or illnesses, that may result in the hospitalization of at least 3 personnel or temporary total disability exceeding 3 months time (accident risk). Extensive (major) damage to equipment or systems or property exceeding $200K but less than $1M. Reversible environmental damage causing a violation of law or regulation.

E H H M L Marginal Could result in injury or occupational illness resulting in one or more lost work days, loss exceeding $10K but less than $200K, or mitigable (minor) environmental damage without violation of law or regulation where restoration activities can be accomplished for the environment. Lost day due to injury or illness not exceeding 3 months (accident risk).

H M M L L Negligible Could result in injury or illness not resulting in a lost work day, loss exceeding $2K but less than $10K, or minimal environmental damage not violating law or regulation. A first aid or minor medical treatment (accident risk). Slight equipment or system damage but fully functional and serviceable. Little or no property or environmental damage.

M L L L L S e v e r i t y Job Steps Hazards Actions to Eliminate or Minimize Hazards

EM 385-1-1 (PARA REF)

RAC

EQUIPMENT

TRAINING

INSPECTION

COMPETENT/QUALIFIED PERSON(S) - SIGNATURE

TITLE

DATE

Personnel Involved - SIGNATURE

TITLE

DATE

mary.a.herrick@usace.army.mil Forms Design Team Mary Ann Herrick 20230131 2022-08-24

LRL 1259 JAN 2023 ACTIVITY HAZARD ANALYSIS

LRL 1259 JAN 2023 ACTIVITY HAZARD ANALYSIS

M

PrintButton1:
saveas:
EmailSubmitButton1:
currentPage:
pageCount:
Date AHA form was prepared or last revised.:
Describe specific activity in which this AHA form is being prepared for, i.e., Unit 2 Annual Maintenance.:
Describe specific activity in which this AHA form is being prepared for, i.e., Unit 2 Annual Maintenance.:
For multiple job steps, use the highest obtained Risk Code. Note: the risk code is the residual risk after controls have been implemented. The following codes require the appropriate personnel approvals:

E = Division Commander (E = Extremely High Risk). Equates to loss of ability to accomplish mission if hazards occur during mission.

H = District Commander (H = High Risk). Results in significant degradation of mission capabilities if hazards occur during mission.

M = Program Manager, Project Manager, Project Engineer (M = Moderate). Minor injury, lost workday accident, compensable injury or illness, minor system damage, or minor property damage.

L = First Line Supervisor, Quality Assurance Representative (L = Low). Little or no impact on mission accomplishment.:

Who prepared this analysis?:
Who prepared this analysis?:
List project name:
Phone Number:
RemarksByReview:
Recommended Protective Clothing & Equipment: :
CheckBox4: 0
CheckBox3: 0
CheckBox5: 0
CheckBox2: 0
CheckBox6: 0
CheckBox1: 0
CheckBox7: 0
TextField12: Cell Phones
CheckBox8: 0
TextField13: First Aid Kit 03.B
CheckBox9: 0
TextField14: PFD 05.J
CheckBox10: 0
TextField15: Hearing Protection 05.C.01
Button1:
Button2:
TextField1:
TextField2:
TextField3:
:
DropDownList2:
DateTimeField1:
DD2:
DD3:
DD4:

File details come from the government source that posted it. Updated .