This Statement of Work (SOW) details a construction project for slush grouting the south bank of the tailwater retreat channel at Cave Run Lake Dam in Bath County, Kentucky. The project requires the contractor to furnish all personnel, labor, equipment, supplies, materials, and incidentals to complete the slush grouting work, with the new grout extending from the existing concrete walkway to the crest of the retreat channel and matching the existing grout line on the north bank.

Key project specifications include grouting approximately 400 square yards (72 ft. east to west by 50 ft. from sidewalk to crest), with strict requirements for grout placement, temperature constraints (34-85°F), surface preparation, and curing. The contract will be awarded based on low price, with a period of performance of 75 business days after Notice to Proceed. Contractors must have a valid Unique Entity Identifier (UEI), be registered in the System for Award Management (SAM), and comply with specific security and safety requirements. The project is solicited by the U.S. Army Corps of Engineers Louisville District, with quotes due by 9 June 2025 at 1:00 PM Eastern Time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL INSTRUCTIONS

The contractor shall furnish all personnel, labor, equipment, supplies, materials, and incidentals necessary to slush grout a portion of the south bank of the tailwater retreat channel at Cave Run Lake Dam. Prices should include mobilization & de-mobilization, fuel, labor, material, and equipment.

The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.

Work under this contract shall begin within 14 calendar days of Notice to Proceed (NTP). The Period of Performance for this work is 75 business days after receiving the NTP.

One award will be made from this solicitation. The contract award will be based on Low Price.

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. Quotes will not be accepted for quantities less than the quantities specified in the Quote.

Failure to submit a unit price for all items listed will be considered as a material deviation from the requirements and the Quote will be rejected.

Offerors are encouraged to present their best prices in their initial quote submission. Quotes shall be submitted by 9 June 2025 at 1:00 PM Eastern Time as identified on SF 1442 block thirteen (13), to the Contract Specialist via email at jennifer.l.king2@usace.army.mil. Electronic submissions via facsimile will not be accepted.

All offerors wishing to do business with the Government must possess a valid Unique Entity Identifier (UEI) number and shall be registered in the System for Award Management (SAM) at the time of quote submittal.

Training tools are available on the SAM website to help you get familiar with SAM. Start by going to www.sam.gov and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well as Quick Start Guides and Helpful Hints that will help you create and account, migrate your roles, perform updates, and search for the information you need. These guides can also be viewed on http://www.acquisition.gov .

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

NOTICE TO POTENTIAL BIDDERS/OFFERORS: In accordance with DFARS 204.7302, Contractors and subcontractors are required to provide adequate security on all covered contractor information systems.

Contractors are required to implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 by inclusion of clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber incident Reporting, are required at time of award to have at least a Basic NIST SP 800-171 DoD Assessment that is current (i.e., not more than 3 years old unless a lesser time is specified in the solicitation).

SPRS provides storage and access to the NIST SP 800-171 assessment scoring information. To access the NIST SP 800-171 Assessments module, users must be registered in the Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ and be approved for access to Supplier Performance Risk System (SPRS).

The NIST SP 800-171 DoD Assessment Methodology is located at:

https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171

Vendor Help and Training Tutorials are available at https://www.sprs.csd.disa.mil/nistsp.htm

Price Breakout Schedule

LINE

ITEM

DESCRIPTION UNIT QTY.

ESTIMATED

COST

Slush Grout Rip Rap on South Bank of Tailwater Retreat Channel as specified.

JOB 1

Total Base Line Item 001:

TOTAL BASE $ ______________

Cave Run Lake Tailwater Retreat Channel South Bank Slush Grout

TABLE OF CONTENTS

SPECIFICATIONS/DESCRIPTION

Section

1. Project Information

2. Statement of Work

3. General Requirements

4. Technical Specifications

5. Responsibilities and Site Conditions

6. Contractor Submittals

7. Pre-Bid Site Visit

8. Contract Start and Completion Dates

9. Technical Points of Contact (TPOC)

10. Pre-Work Conference

11. Working Hours

12. Permits and Licenses

13. Identification of Contract Employees and Vehicles

14. Safety Requirements

15. Required Security Training and Planning

16. Accident Reporting

17. Damage Reports

18. Contractor Employees’ Conduct and Competency

19. Damage or Loss of Contractor’s Supplies and Property

20. Supervision

21. Environmental Program

22. Contract Discrepancy Report (CDR)

23. Meetings

24. Quality Control

25. Quality Assurance

26. Deficiencies

27. Interruptions to Systems

28. Government Furnished Materials and Equipment

29. Contractor Furnished Items

30. Safeguarding Government Property

31. Minimum Manpower Requirements

32. Minimum Personnel Qualifications

33. Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts

34. Cooperation with other Contractors, Lessees, and Volunteers

35. Reports

36. Applicable Publications

37. Warranty

38. Wage Rates

39. Definitions

40. Index of Exhibits

1. PROJECT INFORMATION:

The project site is located at Cave Run Lake Dam is located approximately 10 miles southwest of Morehead, Kentucky in Bath County, Kentucky. The tailwater is at the west side of the dam, approximately 1 mile south of the USACE Field Office at Cave Run Lake, 150 KY-826, Morehead, Rowan County, Kentucky, 40351.

2. STATEMENT OF WORK:

The scope of work includes slush grouting the existing riprap stone protection on the south bank of the tailwater retreat channel below the stilling basin at Cave Run Lake Dam. The contractor shall furnish all personnel, materials, supplies, tools, equipment, transportation, labor, and incidentals necessary to perform the following work listed below per the specifications herein.

Please note, all measurements and distances provided are approximate and for reference only. It is the contractor’s responsibility to field verify all dimensions, quantities, and work conditions.

It is incumbent upon the contractor to attend the pre-bid meeting and site visit to understand the site conditions and work out the details of the job. Equipment storage and staging of materials shall be coordinated with the Maintenance Leader, and/or Lake Manager during the pre-construction meeting after award.

Line Item 001: Slush Grout Rip Rap on South Bank of Tailwater Retreat Channel as specified.

The contractor shall slush grout the existing riprap stone protection on the south bank of the retreat channel as indicated on Exhibit C. The new slush grout shall extend from the existing concrete walkway up to the crest of the retreat channel, matching the existing grout line on the southside of the retreat channel. The contractor will bond the new slush grout to the existing slush grouted areas. The new slush grout on the south bank shall extend westward, matching the extents of the existing slush grout across the retreat channel on the north bank. This area is approximately 400 square yards (about 72 ft. from east to west by 50 ft. from the sidewalk to crest).

Stone protection shall not be grouted when the ambient air temperature is less than 34°F or above 85°F, unless approved by the contracting officer in writing; nor when the temperatures before final set of the grout has occurred. Prior to grouting, all surfaces receiving slush grout shall be saturated surface dry (SSD) to prevent moisture loss of the freshly placed grout and excessive shrinkage.

Generally, grouting will proceed up the slope. Grout will be placed in final position into the voids between the larger stones by means of a pump hose or similar procedure to the maximum practicable extent, supplemented by rodding. The grout will be placed and worked into the tip course of rip rap stone such that the interstitial voids are filled to a minimum depth of 8” and the top of the exposed rock surfaces do not extend more than 6” beyond of the slush grout. Grout on the surfaces of the larger stones will be removed with stiff stable brooms.

The grouted surface shall be protected from rain and flowing water during the initial curing of the grout material. No workmen will be permitted on the grouted surface for at-least a 24-hour period during the initial curing of the placed grout. Grouted stone protection shall be cured by keeping the surface continuously moist for a period of not less the 7 days.

3. GENERAL REQUIRMENTS:

All material and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations.

The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be the responsibility of the contractor. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government.

The contractor will be required to secure a safe work area around the portion of the retreat channel the contractor designates as the work area using orange plastic fence (snow fence) or other material preapproved by the Lake Manager to prevent public from entering the site until all work is complete.

The contractor shall provide and have approved by the Lake Manager and TPOC a means of environmental protection to keep grout, cement and other debris from falling into the Tailwater discharge.

The contractor shall be responsible for removing and disposing of all debris, spoils, and material generated from construction activity offsite at a site authorized by state or local government to accept the type of debris and material.

The contractor shall be required to restore all areas disturbed by contractor’s actions back to its original condition prior to construction. All disturbed areas shall be graded and leveled to promote proper drainage, blended into the existing surrounding grades. Disturbed gravel areas shall be resurfaced with crushed stone similar in gradation, graded, leveled, and restored to the original contours. Grassy areas shall be seeded and receive an even application of 15-15-15 fertilizer at a rate of 10 lbs. per 1000 square feet. The area will be seeded using Kentucky 31 Fescue seed, or an equivalent approved by the Park Manager, at a rate of 200 lbs. per acre. The seed shall be raked in and mulched with straw at a rate of 150 lbs. per 1000 square feet. The straw shall be secured with nylon netting that is securely fastened to the ground to hold the mulching material in place.

Hours of Work will be 6:30 a.m. – 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance and shall be coordinated through the Lake Manager.

4. TECHNICAL SPECIFICATIONS:

GROUT MIX REQUIREMENTS

The concrete sand grout mixture will be the responsibility of the contractor. The grout mix design shall be submitted for review a minimum of 10 days prior to being used under this contract. The approved grout mixture proportions will not be changed without approval.

a. The air content shall be between 6.0 and 9.0 percent.

b. The specified compressive strength shall be 3000 psi at 28 days.

c. The maximum water cement ratio will be 0.55.

d. The slump of the grout mix will be 8 inches plus or minus 1 inch.

e. A water reducing admixture (WRA) may be used in the grout to increase the consistency and facilitate placement of the grout.

f. The grout will be mixed and transported in approved concrete or mortar mixer.

g. Mixing time will be as necessary to produce a mixture having a consistency such as to permit gravity flow into the interstices of the stone protection with the help of limited rodding.

h. The grout will be placed in the work within the period of 0.5 hour after mixing unless an approved retarder is used, in which case the grout will be placed within 1.5 hours after mixing.

5. RESPONSIBILITIES AND SITE CONDITIONS:

a. Existing break areas, offices, latrines, and showers are not available for contractor use. It is recommended that the contractor bring portable restrooms.

b. Parking of vehicles and designated laydown area is to be coordinated with the Lake Manager during pre-construction conference.

c. All deliveries will be coordinated with the TPOC at least 48 hours in advance.

d. Contractor shall keep work area clean and orderly.

e. All spoils and waste materials shall be removed from the site, and under no circumstance be dumped into the lake.

f. Access to the facility shall not be impeded.

g. The contractor shall exercise care when selecting equipment and equipment sizes as to not damage the existing pavement, curbing, sidewalks, etc. Any damaged caused by negligence to the site shall be repaired/replaced/restored to the condition prior to damage at the expense of the contractor.

h. Any damage caused by construction to the existing buildings, structures, utilities, or other areas of the project site shall be fully restored to the condition present before start of construction at the contractor’s expense.

6. CONTRACT SUBMITTALS:

Unless otherwise specified, the Contractor will submit the following information to the TPOC prior to the pre-work conference for this contract:

a. Contractor Representatives. List of names of Contractor Representatives.

b. Accident Prevention Plan (APP). Reference EM385-1-1 Chapter 2 including Sections (2-7) and (2-10.d) ENG Form 6293.

c. ENG Form 6282 SSHO Designation. Reference EM385-1-1 Sections: (2-2.x), (2-3.b), (2-4.b), (2-8.b.2), and (2-10.c)

d. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor Representatives) to call in case of emergencies.

e. List & Certificates of CPR & First Aid Training.

f. Activity Hazard Analysis (AHA). Reference EM385-1-1 Section (2-6) & (2-10.b) ENG Form 6206.

g. Operators. A list of names of qualified equipment/vehicle operators, including experience, training and qualification to operate specific equipment.

h. Certificate of Insurance.

i. Performance Bond. (Where applicable)

j. Security Requirements.

k. Personnel Training Records.

l. Licenses, Permits, and Notifications.

m. Product Data. Grout Mix Design

n. MSDS Safety Data Sheets.

o. Equipment.

p. Inspection, Compliance, and Test Reports.

7. PRE-BID SITE VISIT:

A site visit is HIGHLY ENCOURAGED for the contractor to review the complexities of the work site, verify existing conditions, and exact measurements. A single site visit will be held on 28 May 2025, at 10:30 AM Eastern Time. The Pre-Bid Site visit will be held at the Project Site Lake Office, please use the following address:

150 KY 826 Morehead, KY 40351

If the initial site visit is missed the Contractor may request, with no guarantee, a site visit with the TPOC, Darren Roberts, (502) 315-7007 and/or Lake Manager, Thomas Jackson, (606) 784-9709.

8. CONTRACT START & COMPLETION DATES:

Work under this contract will begin within 14 calendar days of Notice to Proceed (NTP). The period performance for this work is 75 business days after receiving the NTP.

It is of the upmost importance that physical work be completed within 30 days of mobilizing on site.

9. TECHNICAL POINTS OF CONTACTS:

TPOC: Darren C. Roberts U.S. Army Corps of Engineers LRL Operations - OPT-M Office: (502) 315-7007

Email: Darren.C.Roberts@usace.army.mil

Lake Manager: Thomas Jackson Cave Run Lake

150 KY-826

Morehead, Kentucky 40351 Office: (606) 784-9709 Email: Thomas.D.Jackson@usace.army.mil

10. PRE-WORK CONFERENCE:

The awarded contractor will be required to attend a mandatory pre-work conference / pre-construction meeting prior to beginning work during which the Contractor’s plan of work, safety procedures, start date and other items in this contract will be discussed.

1 1 . WORKING HOURS:

Normal working hours, except as otherwise specified herein, will be Monday through Friday, 6:30 a.m. to 4:00 p.m. Local Time (ET). Work inside Government buildings or other secured areas will be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project will be scheduled around normal working hours, as specified by the TPOC.

Holiday Work. The eleven (11) Federal holidays observed are:

New Year's Day (January 1st)

Martin Luther King Day (3rd Monday in January)

President's Day (3rd Monday in February)

Memorial Day (Last Monday in May)

Juneteenth (June 19th)

Independence Day (July 4th)

Labor Day (1st Monday in September)

Columbus Day (2nd Monday in October)

Veterans Day (November 11th)

Thanksgiving Day (4th Thursday in November)

Christmas Day (December 25th)

When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work will be scheduled around the above listed Federal holidays except as specified herein or as approved by the USACE

TPOC.

Inclement Weather Work. The Contractor will maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the TPOC when severe conditions make it impractical or dangerous to perform the work.

12. PERMITS AND LICENSES:

The Contractor will obtain, at own expense, any required licenses, permits or certifications necessary to perform the specified services. Required licenses, permits and certifications will be kept current during the period the work is performed. The Contractor is also responsible for all costs associated with the training of Contractor personnel to acquire and maintain valid licenses, permits or certifications necessary to perform the contract services specified herein. The Contractor, Contractor personnel and any persons acting on behalf of the Contractor will comply with all applicable Federal, State, and local laws and regulations, including any subsequent changes to these laws and regulations.

Minimum Personnel and Training Requirements. The Contractor will provide an adequate number of fully trained and qualified personnel to perform the work specified herein. Contractor personnel will be properly trained to perform their assigned work in a safe and effective manner. Training will include but is not limited to instruction on the proper and safe use and operation of Contractor equipment and any Contractor provided tools, supplies and materials required to perform the specified services. Only properly trained and qualified employees will be used in the performance of services specified herein. The Contractor will also assume responsibility for training or Orienting Contractor personnel to perform the services specified in the contract. In the event the Contracting Officer or his/her Authorized Representative determines that the Contractor does not have a qualified employee performing the specified work, the Contractor will be required to provide qualified personnel or subcontract the work to a person or persons who are trained and qualified to perform the work. The Contractor acknowledges that the employment of undocumented migrant workers to perform services under this contract will not be permitted.

13. IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES:

All Contractor employees will be in good appearance while performing services. Employees must wear long pants, shirt with no vulgar or obscene graphics with at least sleeves equivalent of a t-shirt, and durable work type shoes.

Vehicles and any motorized equipment utilized for transportation will be in good operating condition with no display of obscene or vulgar material such as stickers, flags, or etc. Vehicles will be maintained in accordance with federal, state, and local laws.

14. SAFETY REQUIREMENTS:

a. General. Performance of all services will assure complete safety to public visitors, Contractor employees, and all other persons in the area. The Contractor will comply with any pertinent requirements contained in the Corps of Engineers Safety Manual (EM 385-1-1), current at the time of award and any subsequent revisions to that document. Furthermore, the Contractor will comply with pertinent occupational safety and health standards for general industry (29 CFR Part 1910) as required by the Occupational Safety and Health Administration (OSHA). If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the TPOC or any other project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage will be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.

b. The Contractor will comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1-1, https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf or latest version and as otherwise stated herein. Special attention will be given to the requirements for safety meetings.

The Contractor will inform the TPOC a minimum of 7 calendar days prior to a Contractor monthly safety meeting, to permit a government representative to attend.

c. Accident Prevention Plan (APP). The Contractor will prepare an Accident Prevention Plan to assure that requirements of the safety program are provided as specified. This plan must be accepted by the Contracting Officer prior to commencement of any work. One copy of the Accident Prevention Plan will be provided to the Contracting Officer and the TPOC one week prior to the pre-work conference. The Accident Prevention Plan must use ENG Form 6293 prescribed in Chapter 2 section 7.b and section 10.d of the EM385-1-1.

d. Activity Hazard Analysis (AHA). The Contractor will use Activity Hazard Analyses (AHA’s) as one of many tools to insure safe performance of work. It is the Contractor’s responsibility to prepare the AHA.

Sample AHA’s may be available at the project office for review and use by the Contractor to assist in the development of site-specific Activity Hazard Analyses prior to the Contractor performing the job. The Contractor is encouraged to revise or add to these sample AHA’s as necessary to address changing conditions. Prior to performing jobs with inherent hazards, the Contractor will review, at a “Toolbox” safety meeting, the approved AHA’s with those employees who will perform that work each time the work is ordered. The Government may request advanced notification of the time and date of the above AHA “Toolbox” safety meeting for Contractor employees so that the Government may attend such reviews.

The Government will require the Contractor to prepare an AHA for any jobs for which an adequate AHA does not already exist. A copy of this AHA will be submitted to the TPOC and must be accepted before the Contractor starts the job. This copy of the AHA will become the property of the Government. Guidance is included, which will be used by the Contractor as a guide for the preparation of required AHA's.

A copy of the approved AHA’s will be available at all times to workers at each associated job site and a copy will be provided to the Government.

e. Public Safety. The Contractor will ensure that reasonable precautions are taken to protect the public at all times where work is being performed. The Contractor will immediately report to the TPOC any potential hazards found by his employees on the project. The Accident Prevention Plan will include procedures to be taken to provide for public safety. Additionally, the Contractor will not allow any persons, except employees, into work areas that are not otherwise open to the public; nor will the Contractor transport in Contractor work vehicles any persons, except employees, during times the Contractor is on the project performing work under a contract.

f. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, will be provided to eliminate or minimize hazards to personnel. As a minimum, each employee will wear a short-sleeved shirt, long trousers, and appropriate footwear during all contract work. Face shields, spectacles with side-shields, or goggles, and hearing protection will be worn by employees when required by safety manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards will also be provided and easily accessible to all employees.

g. Contractor Employees Certified in First Aid & CPR. The Contractor will schedule employees, so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual.

Copies of their certification will be provided in accordance with regulations. Two people per crew will be trained in First Aid and CPR. Individuals working alone will be trained in First Aid.

h. Hazard Communication Program. The Contractor will be responsible for implementing a hazard communication program for Contractor employees, as required by the Safety Manual. The Contractor will provide Material Safety Data Sheets (MSDS) and/or Safety Data Sheets (SDS) for review by the TPOC prior to use of any hazardous substance on the project and provide a plan for the proper handling, transportation, storage, and usage of hazardous substances on the project.

15. REQUIRED SECURITY TRAINING AND PLANNING:

a. General security requirements and guidance:

The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

b. Physical security and access control requirements:

All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures.

Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

c. Suspicious Activity Reporting training (e.g., iWATCH, CorpsWatch, or See Something, Say Something):

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

d. Pre-screen candidates using E-Verify Program:

Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

e. SUPPLEMENTAL SECURITY REQUIREMENTS:

All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

FOR ALL LOUISVILLE DISTRICT CONTRACTS:

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.

The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security Access Form each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.

The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.

The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security Office for background purposes.

FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC):

The documents listed below are required: SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). Fingerprints are captured electronically at the closest Army Recruiting Station to the contractor’s home of record or at the USACE, Louisville District Security Office.

Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.

Following submission of paperwork, the Louisville District Security Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Louisville District Security Office will make recommendations to the PCO or their Designated Representative. The Louisville District Security Office cannot give approval due to unfavorable report(s). The Louisville District Security Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.

FOREIGN NATIONALS:

The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of

U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N- 550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.

In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation, or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:

CELRL-SM

600 Martin Luther King Jr. Pl Louisville, KY 40202

Primary Email: DLL-CELRL-Security-SM@usace.army.mil

Alternate (if no response in 72 hours):

James R. Milner, phone (502) 315-6916; James.R.Milner@usace.army.mil Jason Almodovar, phone (502) 315-6754; Jason.Almodovar@usace.army.mil

16. ACCIDENT REPORTING:

The Contractor is responsible for reporting all accidents to the TPOC immediately. Prompt action will be taken to ensure immediate and appropriate medical treatment. The Contractor will maintain an accurate record of any accidents in the manner and on the forms prescribed by the TPOC. For property damage accidents of $2,000 or more, the Contractor will complete and submit to the TPOC a copy of ENG Form 3394. The Contractor will maintain an OSHA 300 Log of On – The – Job injuries and first aid treatments.

The Contractor will also provide a monthly record of all exposure and accident experience incidental to the performance of services under the contract. This reporting requirement includes exposure and accident experience of both the Prime Contractor and any subcontractor(s). A Monthly Record of Work-Related Injuries/Illnesses & Exposure form will be available from the Project Manager. The Monthly Record of Work- Related Injuries/Illnesses & Exposure report will be provided to the TPOC by the 5th working day of the month for the previous month.

17. DAMAGE REPORTS:

All instances where Government materials, supplies, property, and/or equipment are damaged will be reported immediately to the TPOC. When the damage was caused by contract employees, a written report of the incident and extent of such damage will be submitted to the TPOC, within 2 workdays (less weekends and holidays) of occurrence. For property damage accidents of $2,000 or more the Contractor will complete and submit to the TPOC a copy of ENG 3394.

18. CONTRACTOR EMPLOYEES’ CONDUCT AND COMPETENCY:

All contract employees will conduct themselves in a proper and courteous manner at all times. Since the majority of work is performed in the presence of the general public, the conduct of all employees is critical and will be closely monitored. Contract employees will comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.

a. Employee Dismissal. The Contractor expressly agrees to dismiss any employee or subcontractor employee whose continued employment is deemed by the Lake Manager to be inconsistent with the best interests of the public or the U.S. Army Corps of Engineers. The KO or the Lake Manager may require the Contractor to immediately remove from the work site any employee or subcontractor who is incompetent, endangers persons or property, or whose physical or mental condition would impair their ability to satisfactorily perform the work. Notification to the Contractor will be promptly made in writing if time and circumstances permit. Otherwise, notification will be verbal and confirmed in writing as soon as possible.

No removal will reduce the Contractor's obligation to perform all work required under this contract nor be the basis for time extension. Immediate replacement of the employee will be made.

19. DAMAGE OR LOSS OF CONTRACTOR’S SUPPLIES AND PROPERTY:

The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage, or theft. The Government assumes no responsibility for theft, damage, etc., of the above. The Government is not responsible for providing storage areas or facilities for the storage of Contractor supplies, materials, and equipment.

With prior approval, the TPOC may provide a location for the temporary storage of large equipment to prevent the transportation of such equipment to/from the work site while a particular service is being performed. However, the Government assumes no liability for the loss or destruction of Contractor equipment while it is stored on Government property.

20. SUPERVISION:

For Government TPOC please refer to section 9 for contact information. The Contractor is responsible for providing on-site supervision and quality control inspections of work performed under the contract. The level of supervision and inspections will be sufficient to assure that services are performed in accordance with contractual requirements and all applicable Federal, state, and local laws and regulations. The Contractor or a Contractor Representative will personally supervise the work or be readily available by phone or other means of communication to respond to any contract issue that may arise when work is in progress. The Contractor Representative(s) will conduct overall management coordination and be the central point of contact with the Government for performance of all work under the contract.

Contractor Representative will have full authority to contractually commit the Contractor for prompt action on all matters pertaining to administration of this contract and will be the on-site Contractor employee who is responsible for safety.

The names and telephone numbers of all individuals authorized to act on behalf of the Contractor as Contractor Representatives will be submitted in writing to the TPOC before work is performed.

The Contractor will maintain copies of contract work requirements, specifications, Activity Hazard Analysis, etc., at each work site which relate to each person's work responsibilities and will review them to insure employees’ comprehension of a job prior to initiating work.

21. ENVIRONMENTAL PROGRAM:

The Contractor will comply with Federal, State, and local laws, regulations, and standards regarding environmental protection. All environmental protection matters will be coordinated with the TPOC. Any of the facilities operated by the Contractor may be inspected by the TPOC, or other Federal, State, and local officials without advance notice. Access for inspection will be granted upon request.

Citations against Government facilities operated by the Contractor for non-compliance with environmental standards are a matter for resolution between the Government and the issuing office.

The Contractor will conduct all operations and maintenance activities in a manner to prevent contamination of Government land and property. The Contractor will ensure all lubricants, petroleum products, paints, cleaning materials, or any other hazardous substances are not spilled, leaked, or disposed of on Government property and are disposed of in accordance with environmental regulations. If spills or contamination occur, the Contractor will be responsible for cleanup and any associated costs in accordance with Federal, State and Local Law. Such spills will be reported to the TPOC immediately.

22. CONTRACT DISCREPANCY REPORT (CDR):

A CDR is a formal document used by the Government to process defects in services. As initially issued to the Contractor, the CDR describes the discrepancy or problem. The CDR will be discussed with the Contractor or his representative when it is issued. The Contractor will provide his written response on the CDR form within 24 hours of issuance. The Contractor's response must identify the cause and corrective action taken and Identify Contractor action to prevent recurrence.

Upon finalization of the CDR, the Contractor and the TPOC must sign the form. The Contractor will be given a copy of the completed form. Should the Contractor not concur with any decision, etc., the Contractor may so state, in writing, and request a final decision by the Contracting Officer. The Contracting Officer monitors all CDR’s issued, and CDR's are the principal evidence used by the Contracting Officer in determining Government contract actions such as termination or decision not to exercise options.

23. MEETINGS:

The Contractor is required to attend a pre-work meeting to be scheduled by the TPOC. The Contractor or his authorized representative will report each Month with the schedule and location determined by the TPOC to discuss contract work items. Specific topics of discussion at the Monthly meetings may include issuing inspections, quality control, and upcoming work. If a CDR is issued, mutual effort will be made to resolve any and all problems identified to preclude their recurrence. The TPOC may alter this reporting schedule, or change the reporting method, time, or place if mutually agreeable between the TPOC and the Contractor. A tour of the work site will be conducted following the discussions. It is recommended that the Contractor’s on-site representative or superintendent also attend this meeting. During the pre-work conference, the Contractor will also provide any required submittals not previously submitted.

24. QUALITY CONTROL:

The Contractor will have a Quality Control program to assure the requirements of the contract are provided as specified. The primary purpose of Quality Control is to identify and correct deficiencies in the quality of services performed before the level of performance is unacceptable.

The program will include, but not be limited to the following:

a. An inspection system covering all the services stated in the contract specifications.

b. A method of identifying and correcting deficiencies in the quality of services performed before the level of performance is unacceptable.

c. A file of all inspections conducted by the Contractor and the corrective actions taken. These files will be made available for inspection upon request by the TPOC.

d. A method of insuring that employees have full knowledge of work assignments, and that appropriate technical expertise is utilized with each work assignment.

e. A method of coordinating each work crew’s activities with the TPOC and/or inspector.

The Contractor may use any or all portions of this plan to prepare a plan of his own. A signed plan, including Contractor specific information, will be provided to the Contracting Officer and the TPOC, and accepted, prior to the Pre-Work Conference. If changes to this program occur, updated copies will be provided to the Contracting Officer and TPOC. Failure to provide appropriate Quality Control may result in issuance of a CDR, and/or termination of the contract.

25. QUALITY ASSURANCE:

The Government will monitor the Contractor's performance in each functional area under this contract and reserves the rights to use whatever additional surveillance procedures are deemed appropriate. The Government will keep a record of all complaints received by the public concerning Contractor performance. Upon receipt of a written complaint by the public, the Government will attempt to verify the complaint and furnish the Contractor a copy of the findings. Should the Government verification reveal a nonperformance by the Contractor, a CDR may be issued.

A Government employee shall not be considered an Inspector unless he identifies himself as such to the Contractor, the Contractor Representative, or Quality Control Inspector. No Inspector is authorized to change any provision of the specifications without written authorization of the Contracting Officer, nor shall the presence or absence of an inspector relieve the Contractor from any requirements of the Contract.

26. DEFICIENCIES:

If the Contractor fails to perform, or if performance in any area is judged unsatisfactory by the TPOC, the Government will take corrective action. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no cost to the Government.

27. INTERRUPTIONS TO SYSTEMS:

Contractor will coordinate with the TPOC so that the contractors work will not interrupt the projects mission.

Any authorized interruptions will be kept to an absolute minimum, and all repairs or replacements of equipment or components will be accomplished in an expeditious and efficient manner.

28. GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT:

Forms: All Department of Defense forms, required by the Government to be used under this contract, will be provided by the Government during the contract period. The Government reserves the right to modify or supersede these forms during the contract period.

Control: The Contractor will provide control to ensure Government furnished equipment, property, or items are utilized only for contract purposes. The Contractor may be provided with keys to security gate(s) to access the work area. Any work to be performed within these facilities must be performed during regular working hours when Government employees are available to unlock these facilities for the Contractor.

Safety Manual: Prospective contractors may review a copy of the Safety and Health Requirements Manual EM 385-1-1 at the Project Office. The Contractor can find a copy of Safety Manual EM 385-1-1 online at:

https://www.publications.usace.army.m…