Exhibit D Price Proposal Schedule.pdf
PDF 41 KB Posted
- Attached to
- Communications Tie-In for Building 3169 (C-21), Commander Fleet Activities Yokosuka, Japan
- Solicitation number
- N4008423R0100
About this file
This document contains a price proposal schedule and related federal contract opportunity solicitation. The price schedule requests line item unit pricing for a base price to provide new copper telephone cabling between various buildings and manholes on a Navy base in Japan, as well as optional items including mainframe connectors and unit pricing to remove and provide different gauges of copper cable. The related solicitation is from the Department of the Navy Naval Facilities Engineering Command to perform communications tie-in work for a building on the same Navy base in Japan. The solicitation is for a firm-fixed price construction services contract. Responses were due as indicated on the standard form included with the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008423R0100 Amendent 2.pdf | ||
| 23R0100 Amendment 1.pdf | ||
| Exhibit C Past_Performance_N4008423R0100.docx | DOCX document | |
| Exhibit B Safety Plan Sheet.docx | DOCX document | |
| N4008423R0100 RFP.pdf | ||
| Exhibit A Offeror Experience Project Data Sheet.docx | DOCX document | |
| Attchment 3 Pre-Proposal Inquiry Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line
Item
Description Quantity Unit Unit
Price
Sub-
Total
Total
Price
1 BASE PRICE: Total Price for the entire work for providing new copper telephone cabling between the Bldg.3169, and various existing manholes and
Bldg.C20 in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_____
2 Option Item No. 1: Price for providing all work in connection with 36 mainframe connectors and support, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.
The Government reserves the unilateral right to award Option
Items to the Contractor at the proposed price within 365 calendar days after the contract award.
If this line item is exercised, the contract completion date remains the same after award of the contract.
1 EA $_____
3 Option Item No. 2: Unit Price for removal, disposal, and providing of each copper cable, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
The Government reserves the unilateral right to award Option
Items to the Contractor at the proposed price within 365 calendar days after the contract award.
If this line item is exercised, the contract completion date remains the same after award of the contract.
Copper Cable 2400 pair PE89
24AWG with Pulling eye
(1PC), MFR PART: No.09-
126-02, MANUFACTURER:
SUPERIOR ESSEX
350 LM $_____ $_____
Copper Cable 1200 pair PE89
24AWG with Pulling eye
(1PC), MFR PART: No.09-
120-02, MANUFACTURER:
SUPERIOR ESSEX
100 LM $_____ $_____
Copper Cable 600 pair PE89
24AWG with Pulling eye
(1PC), MFR PART: No.09-
116-02, MANUFACTURER:
SUPERIOR ESSEX
100 LM $_____ $_____
Copper Cable 400 pair PE89
24AWG with Pulling eye
(1PC), MFR PART: No.09-
112-02, MANUFACTURER:
SUPERIOR ESSEX
250 LM $_____ $_____