Exhibit D NCC Optimization Project List.pdf

PDF 527 KB Posted

Attached to
NCC WTP Operations and Maintenance
Solicitation number
RFP FAAA 2027000059 1
Issued by
Gilpin County, Colorado

About this file

This document is an optimization project list for the NCC (likely a water or wastewater treatment facility) that outlines capital upgrade recommendations and associated costs. The technical review team has identified multiple infrastructure improvements necessary to enhance operations and reduce operations and maintenance costs. Key projects include pipe burst trenchless installation of the influent pipeline (6,500 feet), replacement of flow meters, Gregory Gulch reconstruction to minimize sediment buildup, mix tank replacement or modification for improved pH control, installation of an isolation valve, and procurement of internal jetting equipment for maintenance activities. The primary infrastructure project involves replacing a 12-inch corrugated metal pipe (CMP) using pipe bursting technology, with alternative options including manhole insertion and replacement. Additional recommendations focus on instrumentation upgrades, pH control system adjustments, and equipment modifications to optimize facility performance. No specific quantities, response dates, due dates, or bidder meeting information is provided in this document.

The total estimated project cost is $2,268,005, with individual project estimates ranging from $2,000 for isolation valve installation to $2,031,068 for comprehensive pipe burst and infrastructure upgrades. Cost breakdowns include engineering support, survey work, permitting, traffic plan development, equipment procurement, labor, and contingency allowances (typically 10 percent) plus five percent markup on various line items. The document references specific vendors including Brute Jetters, Outlook Enterprises Inc., and Browns Hill, and includes research from commercial sources such as DuraCable and Grainger for equipment pricing. No information is provided regarding funding sources, set-asides, incumbent contractors, contract term, renewal options, or site visit scheduling.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recommendation Equipment necessary Estimated Cost Source Notes

For long-term operations, the technical review team recommends a review of the existing collection system infrastructure to identify potential capital upgrades for implementation to improve operations and reduce O&M costs. The upgrades would include improved access and modifications to prevent or reduce potential for plugging in the collection system.

For long-term operations, the technical review team recommends a review of the existing collection system infrastructure to identify potential capital upgrades for implementation to improve operations and reduce O&M costs. The upgrades would include improved access and modifications to prevent or reduce potential for plugging in the collection system.

The technical team recommends replacing the existing mix tank with a smaller and more appropriately sized unit is likely required for better pH control to allow operations at this lower pH setpoint.

As an alternative, the technical review team recommends reviewing the pH control loop and potentially making adjustments to reduce pH fluctuations.

Replacing the existing lime mix tank in the lime silo with a smaller and more appropriately sized unit is likely required for better pH control and to allow switching to a lime slurry feed system.

An isolation valve is recommended to be installed above the mix tank.

The technical review team recommends that the site team consider procuring new jetting equipment so smaller flushing activities can be performed by operations/maintenance personnel, thereby limiting contractor effort for off-site jetting of source lines and for

Jetting equipment for internal use

$ 29,768 Brute Jetters model Cart 3012 or similar

Pipe burst trenchless installation entire length of influent pipeline, new flume flow meters replacing flodar installations, rebuild Gregory Gulch to minimize sediment buildup and add head, etc.

$ 2,031,068

Engineering Support: $30,000 Survey - $12,000 Pipeburst - 6,500 feet at $250 / foot - $1,625,000 Permit / Traffic Plan - $7,500 Gregory Gulch Modifications: $15,000 MH-18 Packaged MH/Flume: $8,000 GI Packaged MH/Flume: $8,000 National Tunnel Modification - $10,000 National Tunnel Ultrasonic Flow Meter - $10,000 Flume level sensors / Flow Meters (x2): $8,000 Instrument integration - $25,000 Contingency - 10% - $175,850 Markup - 5%

Budgetary estimate for pipe bursting replacement of 12" CMP, based on review of internet costs for bursting

CMP

New flow meters, potential pipeline modifications, rebuild of Gregory Gulch, etc.

$ 180,180

Engineering Support: $20,000 Survey - $10,000 Manhole removal / excavation (x2) - $60,000 Gregory Gulch Modifications: $15,000 MH-18 Packaged MH/Flume: $8,000 GI Packaged MH/Flume: $8,000 National Tunnel Modification - $10,000 National Tunnel Ultrasonic Flow Meter - $10,000 Flume level sensors / Flow Meters (x2): $8,000 Instrument integration - $25,000 Contingency - 10% - $15,600 Markup - 5%

Budgetary estimate for manhole insertion / replacement from internet cost searches

New nozzle and kit for existing mix tank to reduce HRT

$ 5,565

Outlook Enterprises, Inc.

Tank Adapter: $1,500 Parts and Labor: $2,800 Contingency: $1,000 Markup 5%

Contract with browns hill to address pH feedback loop?

$ 9,450

Engineering: $3,000 Parts: $2,500 Browns Hill: $3,500 Markup 5%

Engineering and construction of mix tank inside of the lime silo

$ 9,975

Engineering: $3,500 Labor: $2,500 Tank (est. 300 gallons): $2,500 Contingency: $1,000 Markup 5%

Purchase and installation of a new isolation valve

$ 2,000 total

$ 2,268,005.00

$ 2,268,005.00

Estimated for 12 gpm / 3000 PSIG jetter with 8-inch pipe capabilities https://www.duracable.com/cat/847/Jetters/ $22,850 - Jetter, $1000 Shipping, $2,000 Inflation contingency, 5% markup $1000 - Pickup truck water tank, $1,000 - immersion t h t $500 hi i 5% k https://www.grainger.com/category/plumbing/plumbing-v alves/throttling-valves/butterfly-valves/manually-operated -butterfly-valves/general-service-manual-butterfly-valves ?sst=4&ts_optout=true&searchQuery=4+inch+pvc+valve &categoryIndex=1