Exhibit_D-Florissant_Bid_Dwg_Set.pdf

PDF 8 MB Posted

Attached to
Florissant Golf Club Irrigation
Solicitation number
25-0259-PR
Issued by
St. Louis County, Missouri

About this file

This document is a bid drawing set (Exhibit D) for the Florissant Golf Club irrigation system installation project in Florissant, Missouri. The project requires the installation of a complete new Rain Bird Integrated Control (IC) irrigation system throughout the golf course property, including HDPE mainline and lateral piping systems, Rain Bird IC sprinkler heads for greens, tees, fairways, and perimeter areas, and associated electrical and communication components. The irrigation system design consists of two control paths: Path 1 contains 310 stations and Path 2 contains 272 stations. The sprinkler head specifications include 227 Rain Bird A-952-IC-80-52 units (80 psi, 83' range, 36.3 gpm), 9 additional A-952-IC-80-52 units, 134 A-702-IC-80-36 units (80 psi, 70' range, 28.3 gpm), 178 A-752-IC-80-36 units (80 psi, 68' range, 24.7 gpm), 30 A-752-IC-80-26 units (80 psi, 51' range, 11.6 gpm), and 578 VIH units for a total of 1,156 irrigation heads. The pump station discharge specifications are 800 gpm at 103 psi with potable static pressure of 85 psi. Piping materials include HDPE 4710 DR13.5 in various sizes (2" through 18") and 1" PVC CL 200 lateral piping, with minimum bend radius requirements specified for all installations.

The contractor is solely responsible for developing accurate material takeoff quantities including normal installation waste and must notify the architect and owner of any significant discrepancies between their takeoff and the CAD-provided counts prior to bid submission. The Integrated Control (IC) electrical system requires 14 AWG communication cable routed along two distinct primary trunk and branch paths, with Integrated Control Surge Devices (ICSD) installed no farther than 500 feet apart or with no more than 15 ICM (Integrated Control Modules) between each ICSD. All ground resistance must be established at 50 ohms or less at each ICSD, with measurements recorded in field notes. The contractor must provide complete compliance with current Rain Bird IC system installation recommendations, include all voltage regulation and surge devices recommended by the manufacturer, coordinate with existing buried utilities on the golf course, and prepare comprehensive as-built documentation including digital long addresses for each ICM, pipe routing, wiring paths, valves, splices, and control component locations. Construction must be sequenced to maintain golf course operations with all but one hole open at any time, with each hole completed before proceeding to the next.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Path 1 = 310 Stations

Path 2 = 272 Stations

G1 G2

G3

G4

P1

P2

P3

P4

F1

F2 F3R1R2

T1

T2

T3

T4

G1

G2

G3

G4

P1

P2 P3

P4

F1

F2F3

F4F5

F6F7 F8

F9 F10

F11

F12

F13

F14

F15 F16

R1 R2

R3

R4

R5

T1

T2

T3

T4

T5

T6

T7

T8

G1

G2

G3

G4 P1

P2 P3

P4

F1F2

F3F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

T1T2

T3T4

T5

G1

G2

G3

G4 P1

P2

P3

P4R1

R2

F1 F2

F3

F4

F5

F6 F7

F8 F9

F10 F11

F12 F13

F14 F15

F16 F17

F18

T1

T2

T3

T4

T5 G1

G2 G3

G4 P1

P2

P3

P4 F1

F2

R1

R2

R3

T1

T2

T3

T4

T5

T6 G1

G2

G3

G4

P1

P2 P3

P4 F1

F2 F3

F4 F5

F6 F7

F8 F9

F10 F11

F12 F13

F14 F15

F16 F17

F18 F19

F20 F21

F22 F23

F24 F25

F26 F27

F28 F29

F30 F31

F32 F33

F34

R1

R2

R3

R4

R5

R6

R7

R8

T1

T2

T3

G1

G2

G3

G4 P1

P2 P3

P4

F1 F2

F3

F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

F14

T1

T2

T3

T4

T5

G1

G2 G3

G4 P1

P2

P3

R1

F1 F2

F3

F4

F5

F6

R2

R3

R4

T1 T2

T3

T4

T5

T6

T7

G1

G2 G3

G4

G5

P1 P2

P3

G1

G2

G3

G4

P1

P2 P3

P4

R1

R2

F1

F2 F3 F4

F5

F6

F7

F8

F9

F10

F11

T1 T2

T3

T4

T5

T6

T7

T8

G1

G2

G3

G4

P1

P2

P3

P4

F1

F2

F3

F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

F14

F15

F16

F17

F18

F19

F20

F21

F22

F23 F24

F25

T1T2T3 T4T5T6

G1G2

G3 G4

P1

P2

P3 P4

F1

F2

F3

F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

F14

F15

F16

F17

F18

F19

F20

F21

F22

F23

F24

F25

F26

F27

F28

F29

F30 F31 F32

T1

T2

T3 T4 T5

T6 G1

G2

G3

G4

P1

P2 P3

P4

T1

T2

T3

T4

T5

T6 G1

G2

G3G4

P1 P2

P3 P4

F1

F2

F3

F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

F14

F15

F16

F17

F18

F19

F20

F21

F22

F23

F24

F25

F26

R1R2 R3T1T2T3T4

G1 G2

G3

G4

P1 P2

P3

P4

F1F2 F3

R1R2

R3 R4

T1

T2

T3

T4

T5 T6

T7

G1

G2

G3

G4 P1

P2P3

P4

F1 F2F3

F4F5

F6F7

F8F9

F10F11

F12

F13

F14

F15

F16

F17

F18

F19

F20

F21

R1

R2

T1

T2T3

T4T5

T6T7

T8

T9

T10

G1

G2

G3 G4

P1P2

P3 P4

F1

F2

F3

F4 F5 F6 F7 F8 F9

T1 T2

T3

T4

T5

T6

G1 G2

G3

G4

P1

P2

P3

P4

R1

F1 F2

F3

F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

T1

T2

T3

T4

T5

T6 T7

T8

G1

G2 G3

G4 P1

P2

P3

P4

F1 F2

F3

F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

F14

F15

F16

R1

R2

R3

T1

T2

T3

T4

T5T6

T7

T8

T9

The Contractor is solely responsible for developing his own material takeoff quantities, including normal installation waste and all other factors that contribute to material requirements and losses.

Quantities shown are software reported with no installation allowances. The Contractor shall notify the Architect and Owner of any perceived significant discrepancies between his takeoff and the CAD Counts prior to submitting his bid proposal.

Pump Station Discharge:

(800 gpm @ 103 psi) (Potable Static 85 psi)

Maintenance Shop

0 100 200

Scale in Feet

AR

AR

AR

AR

PG

Sprinkler Head Legend & Count Units Description

227 Rain Bird A-952-IC-80-52; 80 psi, 83', 36.3 gpm

9 Rain Bird A-952-IC-80-52; 80 psi, 83', 36.3 gpm

134 Rain Bird A-702-IC-80-36; 80 psi', 70', 28.3 gpm

178 Rain Bird A-752-IC-80-36; 80 psi', 68', 24.7 gpm

5 Rain Bird A-752-IC-80-26; 80 psi, 51', 11.6 gpm

25 Rain Bird A-752-IC-80-26; 80 psi, 51', 11.6 gpm

578 VIH Total

0 Rain Bird A-752 B-80-24; 80 psi, 48', 10.2 gpm

0 Rain Bird 5006+PCSAMRSS; 45 psi; 37', 2.51 gpm

0 Block/Commercial Sub-Total

578 Total

Irrigation Legend Quick Coupler Valve as specified

Remote Control Valve as specified

Main Isolation Gate Valve; AWWA; Line Size

Sub-Main Isolation Valve as specified

Pipe; HDPE 4710 DR as specified; Size Noted by color

PVC Lateral Piping (block valve lateral piping)

Air Release Valve; Bermad 1"

Control System Station Tag Assignment

Control System Hole Boundary F12

AR

12"

2"

3"

4"

6"

8"

10"

5'

7.3'

9.4'

26.6'

13.8'

18.0'

22.4'

HDPE Minimum Radius Pipe curvature shall not be allowed within 24" of any fitting, saddle, or service tee.

1" PVC CL 200

2" HDPE 4710 DR13.5

3" HDPE 4710 DR13.5

4" HDPE 4710 DR13.5

6" HDPE 4710 DR13.5

8" HDPE 4710 DR13.5

10" HPDE 4710 DR13.5

12" HDPE 4710 DR13.5

18" HDPE 4710 DR13.5

Pipe Legend & Size

Irrigation System 04/13/26 08:13

04/13/26 08:13 1 of 2 Head and Pipe Layout 1Florissant.dwg

Time:

Drawing:

Golfmapstm

Sheet:

IPD, LLC

Irrigation Planning & Design P.O. Box 2717 Georgetown, Texas 78627 Tel: 512-924-3942LLC

Florissant Golf Club Florissant, Missouri

Path 1 = 310 Stations

Path 2 = 272 Stations

The Contractor is solely responsible for developing his own material takeoff quantities, including normal installation waste and all other factors that contribute to material requirements and losses.

Quantities shown are software reported with no installation allowances. The Contractor shall notify the Architect and Owner of any perceived significant discrepancies between his takeoff and the CAD Counts prior to submitting his bid proposal.

Pump Station Discharge:

(800 gpm @ 103 psi) (Potable Static 85 psi)

Maintenance Shop

0 100 200

Scale in Feet

111 IC Primary Trunk/Branch Path 1; 14 AWG IC Primary Trunk/Branch Path 2; 14 AWG

The Primary Trunk and Branch routing shown does not include the secondary/lateral runs along the lateral pipe routing to the VIH sprinklers or to the remote control valves. The Contractor shall be solely responsible for determining the the proper and necessary lengths of all wire paths.

The Integrated Control Surge Device (ICSD) shall be installed with grounding rods along the primary "Trunk" IC wire path as noted on the drawing. In no case shall ICSD be farther than 500 feet from the adjacent ICSD or for no more than 15 ICM between each ICSD. Grounding shall establish a ground resistance of 50 ohms or less.

Rain Bird communication cable shall be 12/2 or 14/2 MAXI Cable meeting all manufacturing specifications for use with the Rain Bird IC system.

Rain Bird IC Electrical Legend

1. These IC Installation Notes are supplemental and are in addition to the complete specifications and requirements provided in the Bid Document.

2. The Contractor shall exercise special care to assure the proper installation of all wiring for the Integrated Control IC Modules and IC Surge Devices. The IC system shall be installed in complete compliance with the most current recommendations and instructions available from Rain Bird at the time of installation.

3. The Integrated Control Surge Device (ICSD) shall be installed with grounding rods along the primary "Trunk" IC wire path as noted on the drawing. In no case shall ICSD be farther than 500 feet from the adjacent ICSD or for no more than 15 ICM between each ICSD or as instructed by the Manufacturer.

4. The Contractor shall establish ground resistance at each ICSD of 50 ohms or less. The resistance shall be measured at each ICSD and recorded on the as built field notes. The Contractor shall be responsible for all materials and labor necessary to establish satisfactory ground resistance in accordance with all Rain Bird installation recommendations.

5. Each splice shall be constructed with sufficient slack to allow the splice to be raised 18" above the finish grade.

All splices, other than for VIH sprinklers, shall be installed inside a 10" round valve box with a black valve box cover and clearly noted on the construction and as built notes and drawing.

6. Wires to each VIH Integrated Control Module (ICM) shall be neatly folded and buried next to the VIH sprinklers.

7. The contractor shall identify and record the digital long address for each ICM at the time of making the field splice to each ICM. Each address shall be identified as noted on the as-staked installation drawings and provided to the Design Consultant on approved forms with other as built field notes.

8. The IC Trunk, major branch, and all minor branch routings to each ICM shall be clearly indicated on the construction field notes and submitted with the ICM digital address.

9. Each of the 2 primary IC wire paths shall be a distinct and different in color than other primary paths. In addition to the 2 primary trunk and branch path colors, a 3rd color shall be used for all secondary/lateral IC wire paths beginning at the 3-way splice for the lateral routing. This clearly indicates at all 3-way lateral splices location which wires are the primary path and which is the lateral wire run.

10. All 3-way lateral IC wire splices shall be made at the nearest sprinkler to the main line and primary branch routing.

11. The Contractor shall include in their bid all voltage regulation and surge devices recommended by Rain Bird.

12. There are buried utilities on the golf course which may not be indicated on the Contract Drawings. The Contractor shall be responsible to identify and to avoid such utilities. Special care, notification, and cooperation shall be provided in the coordination of all work related to the crossing of buried utilities.

Integrated Control (IC) Installation Notes:

AR

AR

AR

AR

PG

Irrigation System 04/13/26 08:13

04/13/26 08:13 2 of 2

1Florissant.dwg Time:

Drawing:

Golfmapstm

Sheet:

IPD, LLC

Irrigation Planning & Design P.O. Box 2717 Georgetown, Texas 78627 Tel: 512-924-3942LLC

Florissant Golf Club Florissant, Missouri Electrical 2-Wire Routing

File details come from the government source that posted it. Updated .