Exhibit C5 - Erosion and Sediment Control.pdf

PDF 150 KB Posted

Attached to
Full Maintenance Services for Corpus Christi and Victoria, TX
Solicitation number
47PH0221R0001
Issued by

View the file

Other files

File Type Posted
Amendment 0002 BL8_ PM Schedule Report.xlsx XLSX spreadsheet
Amendment 0002 Questions and Answers.pdf PDF
Amendment 0002 Corpus Christi Victoria OM FM Spec 2 4 21.pdf PDF
Amendment 0002 Attachment 3_ Flag Policy.pdf PDF
Amendment 0002 Fire Inspection Reports.pdf PDF
Amendment 0002 Site Visit Sign-In Sheets.pdf PDF
Amendment 0002 Preproposal Meeting Roster .pdf PDF
Amendment 0002 Preproposal Conference Slides.pdf PDF
Amendment 0002 47PH0221R0001 SF30.pdf PDF
Corpus Christi Victoria OM FM Spec 1 20 21 Amendment 0001.pdf PDF
47PH0221R0001 Amendment 0001.pdf PDF
Figure B-3 Pricing of Services Amendment 0001.xlsx XLSX spreadsheet
47PH0221R0001 Corpus Christi Victoria OM_FM Spec 1 13 21.pdf PDF
Figure L-1 Management Plan Worksheet.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Attachment 2 - Service Contract Act (SCA) Wage Determination.pdf PDF
Figure L-2 Past Performance Questionnaire.pdf PDF
Figure B-3 Pricing of Services_.xlsx XLSX spreadsheet
Exhibit M9 - 2018 GSA PM Guide FINAL.pdf PDF
Exhibit M10 - Final Copy_PV Service Schedule.pdf PDF
BL6_ Work Order History.xlsx XLSX spreadsheet
FIGURE B-2 SCA_DOL Combination Wage Adjustment Spreadsheet.xlsx XLSX spreadsheet
Exhibit M5 - Smart Buildings.pdf PDF
BL5_ Roof Information.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
BL2_ Inventory to Include Fire Alarm Devices.xlsx XLSX spreadsheet
Figure B-1 Contractors Staffing Declaration.xlsx XLSX spreadsheet
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Attachment 1 - Collective Bargaining Agreement (CBA) with Wage Determination.pdf PDF
BL4_ Elevator Information.pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Exhibit C1 Building Information Sheets.pdf PDF
Exhibit M6 Water Treatment.pdf PDF
Exhibit C6 - Recycle Solid Water Trash Report.pdf PDF
BL7 Energy___Water_Monthly_Report_template.docx DOCX document
BL3_ Building Location Info.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report.pdf PDF
Exhibit M4 - Bldg Op Plan Template.pdf PDF
BL1_ Extinguisher Report.pdf PDF
Exhibit C2 and M1 Quality Assurance Surveillance Plan.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C5

EROSION AND SEDIMENT CONTROL

IPM, Erosion Control, Landscape Management Plan1

Used only when Contractor is required to perform activities that disturbs the existing grounds conditions

The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an IPM Erosion Control, Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and related services portion of the plan shall address the following items:

Goals and Scope

Responsible Parties

Guidance for Resources and Implementation

Performance Measurement

Training

Chemical Treatment Purchasing and Application

Integrated Pest Management (IPM)

Erosion and Sediment Control

Storm-Water Management Plan

Landscape Management and Grounds Maintenance

Composting

Quality Assurance/Quality Control Processes

1 This is a sample and is not intended to be comprehensive. Excerpts are from United States Green Building Council (USGBC).

File details come from the government source that posted it. Updated .