Questions and Answers (current as of Feb 4, 2021)
Questions Number Question Reference
Regarding the Past performance and Experience requirements of the subject solicitation. Where it states, “A minimum of 1 of the maximum 5 Past Performance projects must be submitted from each member of the joint venture” can those project examples be as part of a joint venture entity or must they be for contracts where the JV member is the sole contractor?
Answer
The intent of that statement is that the performance and experience be shown for each firm. The Past Performance submission may be when you were a Prime (Sole contractor) or a JV member. However, please note that you must clearly specify your role and contribution to the joint venture.
2 If someone is out sick, do we have to provide additional staffing while they are out? G.7.14
Answer Reference G.7.14, however a sick day here or there is understandable. Failure to satisfactorily perform that person's work would be a deduction.
3 If I lose an employee, while I am working to vet a new employee, which takes time, will I be penalized for that? G.7.14
Answer Reference G.7.14 You must cover that work and those hours. It can be with other qualified persons from your staff or corporate staff.
4 Is the site visit required?
Answer Not required, but recommended.
General Maintenance Worker information is listed under Contractor Key Personnel. Is the GMW a key personnel, and is a resume required to be submitted with the proposal? Same question for Administrative Support
Answer Yes. All listed under Key Personnel will require resumes.
6 Can the government clarify that elevator maintenance is not apart of this requirement?
Answer Correct, elevator maintenance is not part of this requirement. Lamps for elevators and hoistways is part of the requirement.
7 Can the government provide the current BAS controls subcontractor?
Answer Subcontractor information is proprietary information of the incumbent and will not be made available. Per FAR 52.222-41
(n) - Such list shall be turned over to the Successor Contractor at the commencement of the succeeding new contract.
8 Are generators located at both locations?
Answer An equipment inventory list is provided with the solicitation.
Are there any proprietary equipment/subcontractors? If so, can the Government please provide the equipment and subcontractor information?
Answer Subcontractor information is proprietary information of the incumbent and will not be made available. Per FAR 52.222-41
(n) - Such list shall be turned over to the Successor Contractor at the commencement of the succeeding new contract.
10 Corpus Christi Hours, what are they?
Answer Reference C.1.7.1 For normal Building Hours.
11 Emergency repairs have to be done during normal hours, do you mean O&M hours, or building hours?
Answer Specify where in the contract you are referring. Your statement is not concurrent with contract language. Also see C.2.21
12 Can we reach out to the current contractor to form a joint partnership?
Answer That's up to you, but make sure that contractor meets requirements of new solicitation.
13 What is the building Square Footage?
Answer Reference the Building Information Sheets in the specifications.
14 If we are working as a team, will the past performance of the prime and the subs be acceptable?
Answer Each firm must submit a past performance example.
15 Is the offeror the team, sub or prime contractor?
Answer Both
16 General maintenance worker needs to have a resume submitted?
Answer Yes, any position listed as key personnel must submit a resume.
17 Is there any proprietary equipment at your facilities?
Answer The question is too vague to provide an accurate response.
18 Custodial crew leader is a part-time position. Can that person work part time at each location?
Answer Coverage hours must be met. We cannot tell you how to propose, but just to make sure that you explain yourself well in your management plan.
19 Will we be able to take photos of mechanical rooms and equipment?
Answer Yes, but no pictures of entrances, exits or anything that could present a security concern. Data is CUI and must not be shared. Pics must be deleted/destroyed after use if you are not the successful bidder.
20 Will you all be posting a list of attendees, and a copy of the slides online?
Answer Yes. This will be posted through an amendment.
21 Please provide sizes and quantities for contractor-supplies mats and runners C.9.5.1.4 Floor Mats and
Runners
Answer Sizes and numbers of runners is up to the contractor. The contractor should prevent rain and water puddles in the building by providing sufficient numbers.
Please clarify the staffing requirements described in the following PWS paragraphs:
C.9.2.1 Cleaning Hours "outside of the Core Coverage Hours may take place as follows:
Corpus Christi - 4:00 a.m. and 10:00 p.m.
Martin Luther King, Jr. Federal Building - 6:30 a.m. and 7:00 p.m. C.9.2.1
Answer The contractor may clean anytime between those hours. You are not limited to the Core Coverage Hours.
Please clarify the staffing requirements described in the following PWS paragraphs:
C.1.7.2 identifies Core Coverage Hours as 7:00 a.m. through 5:00 p.m. Does this mean that:
Cleaning at Corpus Christi should be performed between 4:00 a.m. and 7:00 a.m. and/or between 5:00 p.m. and 10:00 p.
m.
Cleaning at Victoria should be performed between 4:00 a.m. and 6:30 a.m. and/or between 5:00 p.m. and 7:00 p.m. C.1.7.2
Answer
No. Core coverage hours are for the contractor to ensure they have staff to perform work orders/service calls and policing during all those times. Cleaning schedules that the contractors propose are limited only by the cleaning hours.
Section also requires a staff presence during Core Coverage Hours. Are there any restrictions on what tasks can be performed during Core Coverage Hours. C.1.7.2
Answer
No. Core coverage hours are for the contractor to ensure they have staff to perform work orders/service calls and policing during all those times. Cleaning schedules that the contractors propose are limited only by the cleaning hours.
Please confirm that this is only for additional cleaning of ground floor windows only. C.9.6.3 Window Washing (Exterior Surfaces of
Windows)
Answer The C.9.6 area of the contract is 'Above Standard Services" This is if the Government wishes for all exterior windows to be cleaned an additional time during the year.
26 Are 'business hours' the same as the Normal Working Hours or the Core Coverage Hours?
Paragraph .C.9.7 Service
Calls Answer Core Coverage Hours.
Under Factor 1 Management Plan, (a) Management Approach, Item 5: Can resumes of key personnel be excluded from the 50 page limit?
Section L.12 Technical Proposal Instructions
Answer No.
28 Can GSA provide a copy of the site visit sign in sheets?
Answer Sign in sheets will be provided through an amendment to the solicitation.
29 Can the government clarify if the post office connected to the MLK building in Victoria, TX is part of this requirement?
Answer Yes, it is.
Can the government provide for both locations a count of the number of trees the contractor is required to provide trimming,pruning, and arborist surveys for?
C.9.5.4.2 Grounds Maintenance Services
Answer There are approximately 51 trees at the Corpus Christi Courthouse and 19 trees at the MLK Jr. Federal Building in Victoria.
Can the government clarify that there is only one emergency generator under this contract located at Corpus Christi?
Generators Answer Refer to Equipment inventory list
Can the government provide the model and serial number for the generator unit at Corpus Christi and if applicalbe the untit at MLK building in Victoria?
Generators Answer Refer to Equipment inventory list
33 Will the government provide contractor parking at each location? If so, how many parking spots will be allocated?
Answer No. Contractor parking will not be provided.
General Maintenance Worker information is listed under contractor key personnel. Is the GMW a key personnel, and is a resume required to be submitted in the proposal? Can the government please clarify as attachement "Figure L-1 Management Plan Worksheet" provided doesn't list a GMW as personnel
C.1.2.1 Contractor Key Personnel
Answer Yes resumes are required if you submit a staffing plan with a GMW.
Adminstrative Clerk information is listed under contractor key personnel. Is the Adminstrative Clerk a key personnel, and is a resume required to be submitted in the proposal?
C.1.2.1 Contractor Key Personnel
Answer Yes
36 Can the government provide the due date switchgear testing and any other major testing due dates?
C.5.5.2.3
Testing/Inspections Answer Switchgear testing is due during the base period.
37 What is the current condition of the roofs at both locations? Do the roofs require frequent repairs? C. 6.13.7 Roofs Answer There are no ongoing issues with the roofs at either location.
38 Can the government provide a copy of the last years FA, SPK, & FE inspections?
C.5.5.2.3
Testing/Inspections Answer This information will be provided through an amendment.
Can the government provide the number of refuse containers and sizes of these containters used at each location?
C.9.10.1.2 Solid Waste/Trash Removal and
Disposal
Answer
Currently, both buildings have an 8 cubic yard dumpster for waste and a 4 cubic yard dumpster for recycling. The Solid Waste/Trash Audit discussed in Section C.9.10.1 will identify the required container size for each buildings use.
Can the government provide additional data on the number of shared liability repairs that were above the $2500 threshold per year? C.5.11.1 General
Answer There were < 10 in FY20.
41 Can the government provide the cost of Local Air Quality Management Operating Permits?
C.5.5.3 Local Air Quality Management Operating
Permits Answer There are no current permit requirements for this area.
Can the government provide the number of users accounts/government furnished computers be given under this contract to utilize NCMMS Maximo? C.1.9.2 Operations
Answer Refer to C.1.9.1 General, and 1 computer for data entry on NCMMS
Can the government provide the number portable fire extinguishers, manufactor, type, and last service dates at both locations?
C.5.9.8 Portable Fire Extinguishers
Answer Refer to the equipment inventory list
44 Can the government provide the number of fire dampers at each location?
C.5.9.5 Fire Damper and Combination Fire/Smoke
Dampers Answer This information is not available at this time.
45 On average how many under threshold repairs are made per year?
RFP PBWS Sect. C.5.11 Repairs
Answer Refer to work orders in Building Library
On average how many over threshold repairs are made per year? RFP PBWS Sect. C.5.11
Repairs Answer See Answer 40.
47 Please advise how many hours are logged on each chiller and has any chillers had a rebuild? RFP PBWS Sect. C.6.4.2 Answer Chillers in Victoria new in 2016 - Chillers in Corpus Original- No rebuilds
48 When is the date of the last certification on the window washing Rig/davits?
RFP PBWS Sect. C.9.5.2.3
Window Washing Answer No Anchor points or Davits both building's- A scissor lift or boom is utilized
Is the PBWS scope the same under the current RFP (#47PH0221R0001) as it is under the incumbent contractor? If not, what are the differences?
Answer The old contract has no relevance to the new scope of work.
50 What is the current staffing level in the building?
Answer See attachment L-1 for the government's manpower baseline.
51 What are the current work shifts in the building?
Answer Current work shifts are not applicable to the solicited scope of work. Proposals must address the solicited scope of work when addressing shifts.
52 Will the Gov’t. provide Personal Protective Equipment (PPE) for the personnel?
Answer No
53 Are resumes required with the proposal for the General Maintenance Worker (GMW) and Administrative Support?
C.1.2.1 Contractor Key
Personnel Answer All Key Personnel
54 What are the designated cleaning hours for the MLK Federal Building postal space in Victoria? C.9.5.1.22 Postal Space
Answer
The cleaning hours per section C.9.2.1 are between the hours of 6:30 a.m. and 7:00 p.m., Monday through Friday, excluding Federal holidays.
What are the designated cleaning hours for fitness centers, health units and laboratories at the Corpus Christi Federal Building and Courthouse?
C.9.5.1.23 Fitness Centers, Health Units and
Laboratories
Answer
The cleaning hours per section C.9.2.1 are between the hours of 4:00 a.m. and 10:00 p.m., Monday through Friday, excluding Federal holidays.
With the additional services to Operations & Maintenance of Custodial and Grounds Maintenance, will the Government allow a maximum of six (6) projects?
Section L. Factor 2. Past Performance, and Factor 3.
Experience Answer No.
Please confirm the awarded contractor is not responsible for the mechanical maintenance (mechanical inspections, preventive maintenance) and repair of VTE, but only those custodial services covered in C.9.5.1.14 Elevators and Stairways?
Ref: Section C.5.2.1 Components of the Building
Operating Plan, K and C.
9.5.1.14 Elevators and
Stairways Answer Custodial and Lamps only
"Emergency Work Orders and callback responses are service requests where the work consists of correcting failures that constitute an immediate danger to personnel or property, including broken water pipes, stalled elevators with trapped passengers.” Can the Government confirm the contractor is not responsible for mechanical and repair service for the VTE?
C.5.12.2.1 Emergency Work Order (During Core
Coverage Hours) Answer Confirmed.
59 What is the monthly value of the contract?
Answer Contract value is publicly available by means of FOIA or other publicly available information.
During contract performance, are offerors required to provide Project Managers/Onsite Supervisors at both locations simultaneously? Section C.1.2.2, Authority
Answer No, Refer to C.1.2.2 Authority
The way we understand the RFQ, the requirement for bidders to provide resumes for all supervisory positions and be forced to hire these employees seems unusual since offerors are not allowed access to incumbent personnel under after award. If bidders propose new supervisor staff, a vast amount of institutional knowledge walks out the door with incumbent staff departure. This makes it infeasible for the awardee to vet the current, knowledgeable incumbent supervisory staff prior to award to determine whether they need to search for more qualified or experienced personnel. This seems counter-productive to providing the best possible service for the buildings. Will the Government consider the resumes as minimally acceptable qualifications, as stated in Factor 1(a), however, permitting the awardee to vet the current staff before making changes to existing incumbent supervisory team? This would allow the awardee to change Key Personnel after award if incumbent personnel are qualified and acceptable.
Factor 1a. Management Approach
Answer This answer is addressed in the amendment revising section C.1.2.1. of the work statement.
62 Is the position of HVAC Supervisor, listed in Exhibit L-1 considered to be Key Personnel requiring a resume?
Section L.12.a(4), Management Approach Answer Yes
Are employees designated as Alternate Project Managers or Onsite Supervisor considered to be Key Personnel requiring a resume?
Section L.12.a(4), Management Approach
Answer Per Section C.1.2.1, all positions listed as Contract Key Personnel are required to have a resume submitted with the proposal.
64 Are Custodian Crew Leaders, listed in Exhibit L-1 considered to be Key Personnel requiring resumes?
Section L.12.a(4), Management Approach Answer Per Section C.9.3, all supervisory custodial employees are required to have a resume submitted with the proposal.
During the Pre Proposal Conference, some discussion revolved around whether the contractor should replace personnel who are out for vacation/leave or sick. The Government representatives indicated the contractor would not have to backfill for these types of absences (vacation/leave or sick); however, Paragraph L.12.a (2) indicates offerors must maintain “full staffing levels at all times during employee vacations and other absences.” Can the Government clarify the intent of this paragraph?
Section L.12.a(2), Management Approach
Answer
Reference G.7.14, however a sick day here or there is understandable. Failure to satisfactorily perform that person's work would be a deduction. You must cover that work and those hours. It can be with other qualified persons from your staff or corporate staff.
Are offerors required to maintain full staffing levels at all times including employee vacations and other absences in accordance with Paragraph L.12.a (2)?
Section L.12.a(2), Management Approach
Answer See Answer 65.
67 Is parking available for all contractor personnel at both buildings?
Answer There is parking in the vicinity of the facilities; however, there is no assigned "Contractor" parking at either building.
It states the contractor would be responsible for all proprietary and non-proprietary controls on the sites that the BAS is included. The proprietary controls would be limited to the manufacturer of those controls so can the Government please provide the types of systems that GSA is referring to as proprietary at each building?
C.5.8 Building Automation Systems and IT
Controls/Section C.1.2.7.5 BAS Technician
Answer Refer to C.1.2.7.5 Qualifications for BAS Technician, BAS Devices are names under this paragraph
69 Is there a Government provided man lift available?
C.9.6.8 High Cleaning
Above 10 Feet Answer No
Will the Government confirm the number of user accounts/Government provided laptops which will be issued for NCMMS data entry? C.1.9 Use of NCMMS
Answer Refer to C.1.9.1 General, and 1 computer for data entry on NCMMS
Will the contractor be responsible for replacement costs of trees, shrubbery, broken windows, doors, etc. damaged by extreme weather, such as hurricanes? Site Visit
Answer
Per Section C.9.5.4.11, the Contractor is only responsible for the cost of replacement of all planted materials that have been damaged as a direct result of the Contractor's lack of oversight, neglect or lack or proper care and maintenance.
Could the Government please confirm that there is only one administrator serving both the Corpus Christi and Victoria sites in their Baseline?
L.3 Management Plan Baseline
Answer Confirmed
There appears to be a missing position/FTE for a Project Manager who would manage both locations. Did the Government intend for one of the listed positions, such as the HVAC Supervisor, to fulfill Project Manager responsibilities?
L.3 Management Plan Baseline
Answer
Management Plan Baseline indicates the government’s baseline manpower projection. The projection is not intended to mandate the staffing or labor mix utilized to fulfill this requirement. The offeror may elect to propose any alternative that will fulfill the requirement of this solicitation. If the offeror elects to deviate from the government’s manpower projection, the offeror must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirements of the solicitation. Failure to provide a Worksheet Narrative will result in a deficiency to the technical rating of your proposal.
75 Will the Government please indicate when each building received its last 3-year electrical testing?
C. 6.9 Electrical Switchgear and Switchboards Answer Last time was past the 3 year, Due on the base year
76 Will the Government please indicate when the last eddy current was performed at each site?
C. 6.4.4 Testing/Inspecting Non Destructive Chiller Tube Analysis (Eddy
Current) Answer Next Due Dec-2021
77 Will the Government please provide when was the last IR scan performed on the electrical panels?
C.5.8.2.1 GSA-hosted Systems Requirements
Answer FY 2020
78 Will the Government please confirm filter alarms are integrated into the BAS?
C.6.3.4 Replacement of Air
Filters, Answer No they are not
79 Can the Government provide when the last inspections were performed on the fire extinguishers?
C.5.9.8 Portable Fire
Extinguishers Answer Jan-2021
80 Are both buildings using NCMMS? Are they combined or separate NCMMS systems? C.1.9 Use of NCMMS Answer Yes, They are Identified as 2 separate buildings in the NCMMS
81 When were the last major roof repairs for each building? C. 6.13.7.
Answer There have been no recent major repairs.
Submittal Instructions states that “For Miscellaneous Documents, the offeror may electronically sign (or sign and scan) and submit the Standard Form (SF) 33 with their proposal.
Does the Government want Offerors to attach each separate document for SF33, SAM, and any required FAR provisions to the submittal email?
Does the Government want one document called “Miscellaneous Documents” that includes any document not part of either the Technical or Price Proposal? RFQ, L.10.2
Answer Offerors may submit the documents in either fashion.
There appears to be a disparity between the percentage of the number of hours expended for Custodian and Custodian Crew Leader when compared to the square footage between the Corpus Christi Federal Building/Courthouse and the Martin Luther King, Jr. Federal Building.
Are the custodial requirements the same for both buildings?
Are offerors required to perform any additional custodial requirements for the Martin Luther King Jr. Federal Building, Victoria, since it is a historic building? Exhibit L-1 and Exhibit C-1
Answer The custodial and related services under Section C9 pertains to both buildings.
“See the Microsoft Excel Attachment, Section J.8, titled Management Plan Worksheet” FIGURE L.1. No other Management Plan worksheet will be accepted” Could the Government please advise whether there is a Section J.8 that was not included?
Management Plan Worksheet Instructions
Answer There is not a Section J.8.
Does the Government require the Offerors to provide a complete and current record of SAM, including current printed copy of our Annual Reps & Certs? L.10.1 General
Answer Yes.
86 Will the Government confirm the 60-day transition starts May 1, 2021? C.7.2
Answer The 60-day transition is anticipated to begin on March 1, 2021 in order to meet the contract start date of May 1, 2021.
87 Do any of the two buildings contain asbestos? Exhibit C.1 and C.5.5.8 Answer Victoria does. There was a survey done in 2011.
88 Can the Government provide the current Building Operating Plans for the two buildings? C.2.11 Answer This information will be provided to the awardee prior to contract start.
Will the O&M Contractor receive office space at both buildings?
Answer Yes 90 How often was there snow and ice removal during the duration of the current contract? C.9.5.3
Answer Although snow and ice are unusual for the Corpus Christi and Victoria areas, the Contractor is responsible for services outlined in Section C.9.5.3 as a standard service.
Is tree pruning required at both buildings and can the Government provide an approximate count of the trees that require thinning? C.9.5.4.4
Answer The annual tree survey at both buildings will identify the number of trees needing pruning or thinning services.
Tree pruning is considered a standard service, while tree thinning is an above standard service.
92 SF33
93 Will the Government provide how many square feet of cleanable space has been unoccupied on the current contract? G.7.12 Answer Please refer to the Building Information Sheets.
Can the government confirm that the parking lot across the street, where post office mail delivery trucks are part are not a part of the contractors responsibility? General-Parking Lot
Answer Only those parking lots adjacent to the building are government property, please refer to building information sheet.
Can the government verify if the hand sanitizer dispensers located in both building are the responsibility of the contractor to replace? If so can the government provide the brand, type, and number of dispensers at each building? General
Answer Yes see Section C.9.5.1.7. Offerors may use whatever brand and type they wish, see the Building Information Sheets for quantity and locations.
Can the government verify the city building located in the Corpus Christi parking lot is not the responsibility of the contractor as there are trees and grass surrounding that building?
General-Parking Lot/Grounds
Answer This is not the responsible of the contractor.
Can the government provide a boundary map outlining the areas that the contractor is responsible for in relation to grounds maintenance? During both site visits it was very unclear which trees, parking lots, and lawns follows under this contract.
General- Grounds Maintenance
Answer Refer to building information sheet.
98 Can the government provide the site visit attendee list for both site visits? General- Site Visit
Answer They will be provided in the amendment.
Does the SF33 contain 1 page or 3? The document showed 1 of 3 pages.
Answer The SF33 is only 1 page.
Per Section C.1.2, Figure L-1 indicates the government’s baseline manpower projection. Figure L-1 does not indicate a supervisory position to be responsible for both projects. Please confirm that a supervisory position, to be responsible for both sites, is not required to be on site. If we deviate from the L-1 Government Baseline Projection, we are required to submit a worksheet narrative explaining the deviation. C.1.2, Figure L-1
Answer
Figure L-1 contains the government’s baseline manpower projection. The projection is not intended to mandate the staffing or labor mix utilized to fulfill this requirement. The offeror may elect to propose any alternative that will fulfill the requirement of this solicitation. If the offeror elects to deviate from the government’s manpower projection, the offeror must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirements of the solicitation. Failure to provide a Worksheet Narrative will result in a deficiency to the technical rating of your proposal.
Normal business hours and core coverage hours list 9 hour days (to include an hour lunch), five days a week, for a total of 45 hours. Is it the Government’s intent that the entire staff work 45 hours a week, or may we alternate 8 hours shifts to ensure the coverage? General
Answer Yes, offerors may propose alternate shifts to ensure coverage. This information needs to be clearly indicated in the proposed staffing plan.
101 Will a color printer be required versus a black and white printer? General Answer No preference.
102 Are there any ongoing projects that will not be completed by the commencement of this new contract? General Answer No.
103 With one site located near body of salt water, are there any known rust/corrosion – high maintenance items? General Answer Nothing noted at this time to impact normal operations of the building.
104 What type of filters (MERV rating) will be required for HVAC systems? General Answer 11. This has been addressed in the amendment.
Does the 60 day transition start on 1 May, with full services to begin on 1 July? Or does transition start 1 March, and full services to start on 1 May? General
Answer Transition starts on 1 March with full services to begin on 1 May.
106 Who is responsible for the lifts located on the Loading Dock? General
Answer Contractor is responsible for custodial only.
107 Are there any future plans to renovate the lifts at the Loading Docks? General
Answer Not at this time.
108 Are there any future upgrades planned for either location? General
Answer None known at this time.
109 What plans does GSA have for addressing the asbestos throughout the facilities? General
Answer None at this time.
Can the government clarify what they are looking for under employee information and employee duties? Is this in reference to all employees working under this contract or only key personnel that is part of the contractor’s emergency plan?
Submittals – Factor 1 Management Approach -
#5 Answer Information needs to be provided for all personnel that have a role in the plan.
111 Who is the current contractor and contract value per year and building? General
Answer The current contractor is COMMERCIAL FACILITIES MANAGEMENT, INC.. Contract value is publicly available by means of FOIA or other publicly available information.
112 Is administrative Support position needs to be staffed more than 8 hours per day. The PWS states 7 am through 5 pm each working day. This is more than 8 hours per day. Do we need more than 1 FT administrative staff personnel on this contract?
General Answer 8-5 will be administrative support hours, we will include this in the amendment.
113 Provide historical repairs data over $2,500 each year for each building? General Answer There were < 10 for both facilities in FY2020.
114 List of second tier subcontractors currently been utilized for each of the buildings? General
Answer
Employee and subcontractor information is proprietary information of the incumbent and will not be made available. Per FAR 52.222-41(n) - Such list shall be turned over to the Successor Contractor at the commencement of the succeeding new contract.
115 Any fuel storage tank onsite? Above ground or underground? If so, which location General Answer An above ground tank at Corpus Christi location.
116 Provide historical data on roof repairs for each of the building? General Answer In 2017 minor repairs were conducted in Victoria.
117 What size and list of trash and recycling containers at each of the buildings? General
Answer
Currently, both buildings have an 8 cubic yard dumpster for waste and a 4 cubic yard dumpster for recycling. The Solid Waste/Trash Audit discussed in Section C.9.10.1 will identify the required container size for each buildings use.
Answer See Section C.1.2.1 and C.9.3 for description of Key Personnel and the solicitation attachments 1 and 2 for labor categories.
Answer Refer to the equipment inventory list provided.
Answer Any information will be provided to the awardee.
Answer Normal business hours maintain 72 and 78 for heating and cooling.
Answer The 5-year standpipe inspection will be due during the base year of this contract.
Answer See Line 354 on the BL2, for TX0313ZZ location only.
Answer There are no chemical fire-protection systems in either facility.
Answer < 10 repairs
Answer < $25K
Answer Refer to Inventory
Answer Refer to Inventory
Answer Next Due Dec-2021
Answer Sizes and numbers of runners is up to the contractor. The contractor should prevent rain and water puddles in the building by providing sufficient numbers.
Answer Approximately 3,000 sq. ft.
Answer Approximately 3,000 sq. ft.
Answer Refer to building information sheet.
Answer Refer to building information sheet.
Answer This is an above standard service and will be ordered on an as needed basis. The annual tree survey will determine if this service is necessary each year.
Answer Zero hours
Answer The government does not have this data.
Answer The government does not have this data.
Answer Zero hours
Answer Zero hours
Answer Zero hours
Answer Please refer to the building information sheet.
Answer Please refer to the building information sheet.
Answer Refer to equipment inventory list.
In review of the staffing requirements in paragraph C.1.2.1, Contractor Key Personnel, and the government’s baseline manpower projection, Figure L-1 Management Plan Worksheet, we see a conflict in requirements and are asking for clarification. Paragraph C.1.2.1 states, “The Contract Project Manager is considered essential to the work being performed under this Contract”, and “The Contractor shall designate a Contract Project Manager “. The government’s baseline manpower projection does not include a Project Manager. Can you provide clarification, or correction to this requirement? C.1.2.1
Answer
Figure L-1 the government’s baseline manpower projection. The projection is not intended to mandate the staffing or labor mix utilized to fulfill this requirement. The offeror may elect to propose any alternative that will fulfill the requirement of this solicitation. If the offeror elects to deviate from the government’s manpower projection, the offeror must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirements of the solicitation. Failure to provide a Worksheet Narrative will result in a deficiency to the technical rating of your proposal.