BL7 Energy___Water_Monthly_Report_template.docx

DOCX document 108 KB Posted

Attached to
Full Maintenance Services for Corpus Christi and Victoria, TX
Solicitation number
47PH0221R0001
Issued by

View the file

Other files

File Type Posted
Amendment 0002 BL8_ PM Schedule Report.xlsx XLSX spreadsheet
Amendment 0002 Questions and Answers.pdf PDF
Amendment 0002 Corpus Christi Victoria OM FM Spec 2 4 21.pdf PDF
Amendment 0002 Attachment 3_ Flag Policy.pdf PDF
Amendment 0002 Fire Inspection Reports.pdf PDF
Amendment 0002 Site Visit Sign-In Sheets.pdf PDF
Amendment 0002 Preproposal Meeting Roster .pdf PDF
Amendment 0002 Preproposal Conference Slides.pdf PDF
Amendment 0002 47PH0221R0001 SF30.pdf PDF
Corpus Christi Victoria OM FM Spec 1 20 21 Amendment 0001.pdf PDF
47PH0221R0001 Amendment 0001.pdf PDF
Figure B-3 Pricing of Services Amendment 0001.xlsx XLSX spreadsheet
47PH0221R0001 Corpus Christi Victoria OM_FM Spec 1 13 21.pdf PDF
Figure L-1 Management Plan Worksheet.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Attachment 2 - Service Contract Act (SCA) Wage Determination.pdf PDF
Figure L-2 Past Performance Questionnaire.pdf PDF
Figure B-3 Pricing of Services_.xlsx XLSX spreadsheet
Exhibit M9 - 2018 GSA PM Guide FINAL.pdf PDF
Exhibit M10 - Final Copy_PV Service Schedule.pdf PDF
Exhibit C5 - Erosion and Sediment Control.pdf PDF
BL6_ Work Order History.xlsx XLSX spreadsheet
FIGURE B-2 SCA_DOL Combination Wage Adjustment Spreadsheet.xlsx XLSX spreadsheet
Exhibit M5 - Smart Buildings.pdf PDF
BL5_ Roof Information.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
BL2_ Inventory to Include Fire Alarm Devices.xlsx XLSX spreadsheet
Figure B-1 Contractors Staffing Declaration.xlsx XLSX spreadsheet
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Attachment 1 - Collective Bargaining Agreement (CBA) with Wage Determination.pdf PDF
BL4_ Elevator Information.pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Exhibit C1 Building Information Sheets.pdf PDF
Exhibit M6 Water Treatment.pdf PDF
Exhibit C6 - Recycle Solid Water Trash Report.pdf PDF
BL3_ Building Location Info.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report.pdf PDF
Exhibit M4 - Bldg Op Plan Template.pdf PDF
BL1_ Extinguisher Report.pdf PDF
Exhibit C2 and M1 Quality Assurance Surveillance Plan.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BL7

Energy and Water Efficiency Monthly Report

1.0 General: This energy and water efficiency report is to be completed per the requirements of section 5.6, Energy & Water Efficiency, of the O&M services contract. The Contractor shall use this report template and submit completed reports as part of the monthly report to the Facility Manager.

2.0 Energy and Water Efficiency Reporting Template. The Contractor shall use this template to complete the energy and water efficiency report sections for “Contract Information” and “Contractor Reporting Elements.” The GSA Property Manager shall complete the section “GSA Review and Response Elements.”

Contract Information Contract Number:

Report Prepared by:

Building Information Building Number: (if the building is part of a combined facility use the facility level data) Building Name:

Building gross square foot:

Energy Technology & Analytic Tools Available at this Building:

Advanced Meters: yes/no
GSA Link: yes/no
Renewable Energy Systems: yes/no (describe)
Most Recent Energy Audit: yes/no (date)

Annual Performance Target (To be filled out by in conjunction with the regional energy coordinator and the facility manager at the beginning of the Contractor’s performance period and 1 year thereafter until the end of contract)

Energy
Water
TARGET Annual Usage
XX,XXX BTU/GSF
X.X Gal./GSF
TARGET Annual Usage Variance
+ / - 5% of target BTU/GSF
+ / - 5% of target Gallon/GSF
ACTUAL Annual Usage
XX,XXX BTU/GSF
X.X Gal./GSF
Actual Usage is Within Target Variance (Yes/No)?
Yes / No
Yes / No
ACTUAL Annual Usage, Previous Year
XX,XXX BTU/GSF
X.X Gal./GSF
Actual Usage is Improving Relative to Previous Year (Yes/No)?
Yes / No
Yes / No

If actual energy or water usage is not within target variance, please provide narrative justification:

If actual energy or water usage is not improving relative to previous year, please provide justification:

Monthly Utility Bill Reporting (To be filled out monthly)

Actual Usage for

Difference Between This Year & Previous Year

Purchased Utility
Recommended Reporting Unit
Current Billing Cycle Ending Month a
Current Billing Cycle
Same Month Previous Year
Actual Units
Percentage Difference
Electricity
kWh
Electric Demand
Peak kW
Natural Gas
100 Cubic Feetb (Therms)
Steam
MLB / mmBTU
Chilled Water
Ton-Hours

Other Energy c

Total Energy Usage mmBTU d

Domestic Water
Gallons e

a. Current cycle ending month refers to the most recent month in which data is available. EUAS and utility invoices are typically not available until 45 days after the month’s end. E.g. June data is available around August 15th.

b. EUAS data is reported in cubic feet. 100 cubic feet = 1 CCF = 1 Therm

c. Other energy can refer to biomass or other purchased utilities that should add to show total building energy consumption

d. Total mmBTU = (3,413 X kWh + 1.031 X 100 Cubic Feet + 1,000,000 X MLB + 12,000 X Ton-Hours ) / 1,000,000

e. Water is sometimes billed on quarterly (3 month) intervals. If water is billed quarterly, use the total quarterly value from the most recent quarter available.

Renewable Energy Production (If applicable, to be filled out monthly)

Energy Output

Difference Between This Year & Previous Year

System
Recommended Reporting Unit
Current Month
Current Month
Same Month Previous Year
Actual Units
Percentage Difference
Solar Photovoltaic
kWh
Solar Hot Water
mmBTU
Wind
kWh
Geothermal
mmBTU
Other
Other

Discussion & Analysis (If applicable, to be filled out monthly)

Are there any significant (>15%) increases energy or water usage?
No:
Yes:

If yes, what is the cause?

Are there any significant decreases or improvements energy or water usage?
No:
Yes:

If yes, what is the cause? Is it something that can be replicated across additional GSA buildings?

Are there any significant changes in renewable energy production?
No:
Yes:

If yes, what is the cause?

Please describe any planned adjustments to operations or physical changes to the building (by the Contractor, a project, or at the request of tenants) since the last report that may result in improved energy or water efficiency.

Please describe any planned adjustments to operations or changes made to the building (by the Contractor, a project, or at the request of tenants) since the last report that may result in increased energy or water usage.

Were planned adjustments from the last report implemented?

Advanced Meter Analysis (To be filled out monthly. If advanced meters are not available for this building, skip to next section.)

Electric Demand Profile (example)

Electric Sub-Meter Demand Profile (example)

Steam Demand Profile
Gas Demand Profile
Chilled Water Demand Profile
Domestic Water Demand Profile (example)

System & Efficiency Checks (To be filled out monthly)

Are advanced meters functioning properly (i.e. are any meters not communicating or reporting data or reporting faulty data)?

Yes

No

Malfunctioning meters reported to regional metering point of contact?

Is GSA Link functioning and are Sparks being addressed?

Yes

No

Malfunctioning GSA Link reported to regional point of contact?

Are space temperatures set at 72 degrees F. +/- 2 degrees F. for heating mode?

Yes

No

If no, are there plans to adjust temperatures to the desired range?

Are space temperatures set at 75 degrees F. +/- 3 degrees F. for cooling mode?

Yes

No

If no, are there plans to adjust temperatures to the desired range?

Are the night and weekend set back temperatures set to no more than 550 in the winter and no less than 900 in the summer?

Yes

No

If no, are the night/weekend setback temperatures at the level that promotes maximum energy savings without disrupting comfort?

Are holiday schedules verified for upcoming holidays?

Yes

No

If no, are there plans to verify or add holiday schedules?

Is the optimum start/stop sequence programmed into the building automation system?

Yes

No

If no, are there plans to implement optimum start/stop?

Is there a chilled water reset programmed into the chiller controls?

Yes

No

If chilled water reset schedule is available, but not in use, is there a plan to implement it?

Is there a hot water reset programmed into the boiler controls?

Yes

No

If a hot water reset schedule is available, but not in use, is there a plan to implement it?

Are the AHU schedules correctly programmed into the BAS and for the shortest possible time to maintain temperatures for the spaces served?

Yes

No

Comments

Are AHUs currently allowed to cycle off near the end of the day so building temperatures can “coast”?

Yes

No

Comments

Are computer room temperature set points at 78 degrees or higher, and are overtime utilities being collected for this space?

Yes

No

Comments

If applicable, have steam traps been inspected internally and, if needed, rebuilt prior to the heating season?

Yes

No

If no, are there plans to inspect and rebuild steam traps?

If applicable, have boiler efficiency tests been scheduled and performed in October - November?

Yes

No

If no, are there plans to schedule tests?

Have advanced meters and/or leak detection sensors been checked for signs of water leaks?

Yes

No

Comments

If applicable, have cooling towers been checked for signs of leaks or excessive drift?

Yes

No

If no, are there plans inspect cooling towers?

GSA Review & Concurrence

GSA1. GSA Reviewing Official:

GSA2. Date Reviewed:

GSA3. Comments:

image1.png image2.png image3.png

File details come from the government source that posted it. Updated .