Exhibit C5 - Erosion and Sediment Control.pdf

PDF 56 KB Posted

Attached to
Custodial and Related Services, El Paso and surrounding areas
Solicitation number
47PH0220R0019
Issued by

View the file

Other files

File Type Posted
1 - Revised Custodial Specification El Paso and surrounding areas - December 3 2020.pdf PDF
Amendment 0003.pdf PDF
Revised Custodial Specification El Paso and surrounding areas - December 1 2020.pdf PDF
Amendment 0002.pdf PDF
Solicitation Number 47PH0220R0019 Questions.pdf PDF
REVISED Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Amendment 0001.pdf PDF
Vetting Sheet.xlsx XLSX spreadsheet
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Exhibit C2 - Custodial Quality Assurance Surveillance Plan (QASP).pdf PDF
Figure L-1 Management Plan Worksheet _ Baseline Manpower Projection.xlsx XLSX spreadsheet
Attachment 1_ Collective Bargaining Agreement (CBA) _ CBA - Wage Determination.pdf PDF
Exhibit C6 - Recycle Solid Waste Trash Report.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Attachment 2_ Service Contract Act (SCA) Wage Determination 2015-5229.pdf PDF
FIGURE B-2 SCA_DOL Combination Wage Adjustment Spreadsheet.xlsx XLSX spreadsheet
1 - Custodial Specification El Paso and surrounding areas - November 3 2020.pdf PDF
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report.pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
FIGURE B-1 Contractor Staffing Declaration.xlsx XLSX spreadsheet
Figure L-2 Past Performance Questionnaire.pdf PDF
Exhibit C1 Building Information Sheets.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT

C5

EROSION AND SEDIMENT

CONTROL

IPM, Erosion Control, Landscape

Management Plan

Used only when Contractor is required to perform activities that disturbs the existing grounds conditions

The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an

IPM Erosion Control, Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and related services portion of the plan shall address the following items:

• Goals and

Scope

• Responsible

Parties

• Guidance for Resources and

Implementation

• Performance

Measurement

• Training

• Chemical Treatment Purchasing and

Application

• Integrated Pest Management

(IPM)

• Erosion and Sediment

Control

• Storm-Water Management

Plan

• Landscape Management and Grounds

Maintenance

Composting

• Quality Assurance/Quality Control

Processes

1 This is a sample and is not intended to be comprehensive. Excerpts are from

United States Green Building Council (USGBC).

File details come from the government source that posted it. Updated .