Exhibit_C.pdf
PDF 155 KB Posted
- Solicitation number
- CC-6191-24/HSM
- Issued by
- Seminole County, Florida
About this file
Exhibit C is a Sample Rate Schedule document for the Seminole County Board of County Commissioners' Master Services Agreement for Hurricane Window and Door Replacements (Project CC-6191-24/HSM). The project involves selecting a qualified General or Building Contractor to replace hurricane-rated windows and storefront doors at fire stations throughout Seminole County, with work to be completed over multiple years. The county will utilize this agreement to request proposals from the awarded contractor for priority locations without needing to solicit separate bids each time, with an engineer's estimated project value of $300,000.00.
The rate schedule provides detailed pricing methodology for various project components, including permit fees, window and door removal and installation, stucco and drywall repairs, painting, sealants, and electrical work. A critical pricing term is a 10% maximum markup on materials, applicable to permits, windows, doors, dumpsters, and rental equipment. The document includes a sample calculation demonstrating how the markup would be applied, with the contractor allowed to add 10% to the base cost of materials. The pricing structure is designed to provide transparency and predictability in project costs while allowing a reasonable profit margin for the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C
Sample Rate Schedule
Permit fees- Price per each $10,000.00 of total assessed cost or work Removal of existing window- Price square foot Removal of existing storefront door and sidelights- price square foot Removal of existing window blinds- price square foot Removal of existing exterior hurricane shutter- price square foot Installation of new window- price per square foot Installation of new windows- Fire Rated- Price per square foot Installation of new storefront door and sidelights- price square foot Exterior stucco repairs- price per square foot labor and material ______ Interior drywall repairs- price per square foot labor and material Interior and exterior sealants- price per lineal foot Interior and exterior paint- price per square foot labor and material Electric powered shutter junction box installation and wiring termination-price per unit Dumpster fees for all trash and debris removal- price per unit
Material
Item PERCENT MARK UP
1 Mark up for Materials over Actual Cost (10% maximum): 10%
Example: If the mark-up you wish to bid is 10%, the unit price is $45.00, and the extended total should be $49.50. (1.10 x $45.00 = $49.50)
2 Mark down for Materials over Actual Cost: 0%
Example: If the mark-down you wish to bid is 10%, the unit price is $45.00, the extended total cost should be $40.50 (.90 x $45.00 = $40.50)
NOTE: Permits, Windows and Doors, dumpsters and rental equipment will all be subject to cost plus allowable markup of 10%.
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 1_2: |
| 2_2: |
| 1_3: |
| 2_3: |
| 1_4: |
| 2_4: |
| Material: |
| Item: |
| 1_5: |
| Mark up for Materials over Actual Cost 10 maximum: |
| 10: |
| 2_5: |
| Mark down for Materials over Actual Cost: |
| 0: |
| Example If the markdown you wish to bid is 10 the unit price is 4500 the extended total cost should be 4050 90 x 4500 4050: |
File details come from the government source that posted it. Updated .