This is a Design Builder Fee Proposal form for Project No. J-449 at Georgia Gwinnett College in Lawrenceville, Georgia. The document outlines the compensation structure for the design-builder selected to provide design-build services for the Building B-Roof Replacement project. The fee proposal consists of three primary components: a Design Consultants Fee for basic design services and construction administration, a Preconstruction Fee representing gross profit for pre-construction consulting services, and a Construction Fee representing gross profit for construction services. Each fee category is designated as a fixed fee amount to be specified by the bidder.
The proposal requires bidders to identify maximum overhead costs and expenses, separated into two categories: Pre-Construction Costs and Expenses (excluding the pre-construction fee) and Construction Overhead Costs (excluding the construction fee). The document includes designated line items for both the Design Consultants Fee, Preconstruction Fee, and Construction Fee, along with supporting attachments (Attachment A and Attachment B) that detail the overhead cost breakdowns. Bidders must complete the form with specific dollar amounts for each fee category and provide the total maximum overhead cost, along with signature authorization from the design-builder firm's officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit B _ Contractor Affidavit.docx | DOCX document | |
| Exhibit G _ Proposer_s Disclosure Statement.doc | DOC document | |
| Exhibit E _ General Conditions Breakdown.xlsx | XLSX spreadsheet | |
| Egnyte Upload Instructions_6.pdf | ||
| Exhibit D _ Precon Cost and Expenses.xlsx | XLSX spreadsheet | |
| _GGC J_449 DB RFQ_RFP.pdf | ||
| Exhibit F _ Project Cost Matrix.xlsx | XLSX spreadsheet | |
| Exhibit A _ Certification Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15 of Exhibit C Project No. J-449 Georgia Gwinnett College, Lawrenceville, Georgia
DESIGN BUILDER (DB) FEE PROPOSAL
1. DB’S FEE:
Basis of Fee. The DB’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.
A. DESIGN CONSULTANTS FEE:
Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:
TOTAL
Design Fee (fixed fee)
B. PRECONSTRUCTION FEE:
Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to DB a Preconstruction Fee:
TOTAL
Pre-Construction Fee (fixed fee)
C. CONSTRUCTION FEE:
Construction Fee. Representing the gross profit for the construction services provided by DB as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to DB a Construction Fee.
TOTAL
Construction Fee (fixed fee)
2. DB’S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:
The DB’s Overhead Costs. The maximum amount for the DB’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .
AMOUNT
A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)
B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)
Total Maximum Overhead Cost (Sum of A & B)
DB Firm Name
By:__________________________________________________________ Signature of DB Officer
Title of DB Officer