Exhibit C - Cost Summary Sheet.xlsx

XLSX spreadsheet 61 KB Posted

Attached to
WVU Replacement Horse Barn
Solicitation number
RFP202690000660
Issued by
Monongalia County, West Virginia

About this file

The document is a Cost Summary Sheet (Exhibit C) for West Virginia University's (WVU) Horse Barn and Manure Bunk project located at the J.W. Ruby Research Farm in Reedsville, West Virginia. The solicitation (RFP20259000660) involves construction of multiple buildings for the Equine program, including a base project for a Horse Barn and Manure Bunk, with three alternate proposals for an Equipment and Dry Storage Shed, Event Barn, and Event Barn Pavilion. The cost summary sheet is structured using the MasterFormat 2018 division system, requiring bidders to provide detailed labor and material costs across 14 construction divisions, from general requirements to utilities.

The pricing document includes a comprehensive labor rate schedule for various worker classifications, including supervisors, foremen, and laborers, with rates specified for regular hours, non-regular hours, and holiday/Sunday work. The cost summary allows for zero-dollar entries in divisions without associated costs and requires contractors to provide a total base price. Subcontractor markup is set at 0%, suggesting the work may be primarily self-performed. The document indicates that WVU reserves the right to accept or reject any proposals, and the completed cost summary will serve as backup documentation for purchase order adjustments. No specific budget or funding sources are explicitly detailed in this exhibit.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Exhibit C
Cost Summary Sheet - RFP20259000660

Contractor Date

Solicitation Name and Number

The University will utilize this Price Summary Sheet for the solicitations. Proposers are to complete the Proposal response, either providing a cost for the work or specifying "NO PRICE". The University reserves the right to accept or reject any or all Proposals and/or Alternates, in whole or in part, in its sole discretion.

Provide a breakdown of the solicitation costs per MASTERFORMAT (2018); in the event a category does not contain costs, mark Zero ($0.00). The proposed costs per divisions utilized should total the TOTAL BASE PRICE. Included under these divisions are some of the items that make up costing per Masterformat 2018; place costs where most applicable.

Division Section Title Proposed Cost

General Requirements
Division 1Admin Requirements, Quality Requirements, Temporary Facilities and Controls, Product Requirements, Execution and Closeout Requirements, Performance RequirementsLabor

Materials

Concrete
Division 3Concrete Forming and Accessories; Concrete Reinforcing; Cast-in-Place ConcreteLabor

Materials

Metals
Division 5Miscellaneous Metals, bollardsLabor

Materials

Woods, Plastics, and Composites
Division 6Rough Carpentry; Finish Carpentry; Architectural Woodwork;Labor

Materials

Thermal and Moisture Protection
Division 7Thermal Protection not in building shell; Joint sealantsLabor

Materials

Openings
Division 8Doors, Frames and hardware, roll-up doors, Windows, glass, Louvers and Vents, installation of OFCI doors.Labor

Materials

Finishes
Division 9Interior stud framed partitions and ceilings, drywall and drywall finishing, painting of drywall and unfinished metal surfaces , rubber cove base.Labor

Materials

Specialties
Division 10Toilet accessories for ADA restroom, etc.Labor

Materials

Furnishings
Division 12Installation of Owner Furnished/Contractor installed items (OFCI)Labor

Materials

Special Construction
Division 13Building shell, insulation, siding, roofing, including erection.Labor

Materials

Plumbing
Division 22Plumbing Piping; Plumbing Equipment; Plumbing Fixtures; Installation of OFCI items.Labor

Materials

Heating, Ventilating, and Air Conditioning
Division 23Heaters and Exhaust Fans with Controls.Labor

Materials

Electrical
Division 26Medium-Voltage Electrical Distribution; Panels and circuits breakers, branch circuits, devices, lighting, power to OFCI items, Underground primary from transformer.Labor

Materials

Earthwork
Division 31Site Clearing; Earth Moving; Excavation Support and Protection; Grading. Seed and mulch where necessary. Stone paving to replace exisitng that's contaminated during construction.Labor

Materials

Utilities
Division 33Water Utilities; Sanitary Sewerage; Stormwater Utilities;Labor

Materials

Miscellaneous
Overhead and Profit, Tax, etc.$0.00

Total Base Price (WVU Horse Barn and Manure Bunk): $0.00

Alternate(s) Proposed Cost

Alt 1 Equipment and Dry Storage Shed $0.00

Alt 2 Event Barn $0.00

Alt 3 Event Barn Pavilion $0.00

Labor Rates

Instructions/Notes: Values entered into this form will provide backup documentation for the purchase order to determine adjustment(s) to the work. Type (or write) over gray text to place adequate description of item. In the event a rate/position is not required, either leave "Rate per Hour" space blank, put a "zero" (0), or delete the text. If other rates are required not captured below, please place them in the table.

Line No.DescriptionUOMRate per Hour
1Supervisor, Regular Hours (inclusive of all burden, per individual)Hour
2Supervisor, Non-Regular Hours (inclusive of all burden, per individual)Hour
3Supervisor, Holidays and Sundays (inclusive of all burden, per individual)Hour
Line No.DescriptionUOMRate per Hour
4Foreman, Regular Hours (inclusive of all burden, per individual)Hour
5Foreman, Non-Regular Hours (inclusive of all burden, per individual)Hour
6Foreman, Holidays and Sundays (inclusive of all burden, per individual)Hour
7Laborer, Regular Hours (inclusive of all burden, per individual)Hour
8Laborer, Non-Regular Hours (inclusive of all burden, per individual)Hour
9Laborer, Holidays and Sundays (inclusive of all burden, per individual)Hour

Subcontractors

Provide percent markup of subcontractor(s) for this project. If work is all self-performed, leave the space blank or put a zero cost ("$0.00). 0%

Signatory Date

Printed Name Title

&G &G

Divisions Form, V1.2 Bayles, February 2024

Sheet2 image1.jpeg image2.jpeg