Exhibit C - Cost Summary Sheet.xlsx
XLSX spreadsheet 61 KB Posted
- Attached to
- WVU Replacement Horse Barn
- Solicitation number
- RFP202690000660
- Issued by
- Monongalia County, West Virginia
About this file
The document is a Cost Summary Sheet (Exhibit C) for West Virginia University's (WVU) Horse Barn and Manure Bunk project located at the J.W. Ruby Research Farm in Reedsville, West Virginia. The solicitation (RFP20259000660) involves construction of multiple buildings for the Equine program, including a base project for a Horse Barn and Manure Bunk, with three alternate proposals for an Equipment and Dry Storage Shed, Event Barn, and Event Barn Pavilion. The cost summary sheet is structured using the MasterFormat 2018 division system, requiring bidders to provide detailed labor and material costs across 14 construction divisions, from general requirements to utilities.
The pricing document includes a comprehensive labor rate schedule for various worker classifications, including supervisors, foremen, and laborers, with rates specified for regular hours, non-regular hours, and holiday/Sunday work. The cost summary allows for zero-dollar entries in divisions without associated costs and requires contractors to provide a total base price. Subcontractor markup is set at 0%, suggesting the work may be primarily self-performed. The document indicates that WVU reserves the right to accept or reject any proposals, and the completed cost summary will serve as backup documentation for purchase order adjustments. No specific budget or funding sources are explicitly detailed in this exhibit.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Exhibit C |
| Cost Summary Sheet - RFP20259000660 |
Contractor Date
Solicitation Name and Number
The University will utilize this Price Summary Sheet for the solicitations. Proposers are to complete the Proposal response, either providing a cost for the work or specifying "NO PRICE". The University reserves the right to accept or reject any or all Proposals and/or Alternates, in whole or in part, in its sole discretion.
Provide a breakdown of the solicitation costs per MASTERFORMAT (2018); in the event a category does not contain costs, mark Zero ($0.00). The proposed costs per divisions utilized should total the TOTAL BASE PRICE. Included under these divisions are some of the items that make up costing per Masterformat 2018; place costs where most applicable.
Division Section Title Proposed Cost
| General Requirements | ||
| Division 1 | Admin Requirements, Quality Requirements, Temporary Facilities and Controls, Product Requirements, Execution and Closeout Requirements, Performance Requirements | Labor |
Materials
| Concrete | ||
| Division 3 | Concrete Forming and Accessories; Concrete Reinforcing; Cast-in-Place Concrete | Labor |
Materials
| Metals | ||
| Division 5 | Miscellaneous Metals, bollards | Labor |
Materials
| Woods, Plastics, and Composites | ||
| Division 6 | Rough Carpentry; Finish Carpentry; Architectural Woodwork; | Labor |
Materials
| Thermal and Moisture Protection | ||
| Division 7 | Thermal Protection not in building shell; Joint sealants | Labor |
Materials
| Openings | ||
| Division 8 | Doors, Frames and hardware, roll-up doors, Windows, glass, Louvers and Vents, installation of OFCI doors. | Labor |
Materials
| Finishes | ||
| Division 9 | Interior stud framed partitions and ceilings, drywall and drywall finishing, painting of drywall and unfinished metal surfaces , rubber cove base. | Labor |
Materials
| Specialties | ||
| Division 10 | Toilet accessories for ADA restroom, etc. | Labor |
Materials
| Furnishings | ||
| Division 12 | Installation of Owner Furnished/Contractor installed items (OFCI) | Labor |
Materials
| Special Construction | ||
| Division 13 | Building shell, insulation, siding, roofing, including erection. | Labor |
Materials
| Plumbing | ||
| Division 22 | Plumbing Piping; Plumbing Equipment; Plumbing Fixtures; Installation of OFCI items. | Labor |
Materials
| Heating, Ventilating, and Air Conditioning | ||
| Division 23 | Heaters and Exhaust Fans with Controls. | Labor |
Materials
| Electrical | ||
| Division 26 | Medium-Voltage Electrical Distribution; Panels and circuits breakers, branch circuits, devices, lighting, power to OFCI items, Underground primary from transformer. | Labor |
Materials
| Earthwork | ||
| Division 31 | Site Clearing; Earth Moving; Excavation Support and Protection; Grading. Seed and mulch where necessary. Stone paving to replace exisitng that's contaminated during construction. | Labor |
Materials
| Utilities | ||
| Division 33 | Water Utilities; Sanitary Sewerage; Stormwater Utilities; | Labor |
Materials
| Miscellaneous | |
| Overhead and Profit, Tax, etc. | $0.00 |
Total Base Price (WVU Horse Barn and Manure Bunk): $0.00
Alternate(s) Proposed Cost
Alt 1 Equipment and Dry Storage Shed $0.00
Alt 2 Event Barn $0.00
Alt 3 Event Barn Pavilion $0.00
Labor Rates
Instructions/Notes: Values entered into this form will provide backup documentation for the purchase order to determine adjustment(s) to the work. Type (or write) over gray text to place adequate description of item. In the event a rate/position is not required, either leave "Rate per Hour" space blank, put a "zero" (0), or delete the text. If other rates are required not captured below, please place them in the table.
| Line No. | Description | UOM | Rate per Hour |
| 1 | Supervisor, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 2 | Supervisor, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 3 | Supervisor, Holidays and Sundays (inclusive of all burden, per individual) | Hour | |
| Line No. | Description | UOM | Rate per Hour |
| 4 | Foreman, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 5 | Foreman, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 6 | Foreman, Holidays and Sundays (inclusive of all burden, per individual) | Hour | |
| 7 | Laborer, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 8 | Laborer, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 9 | Laborer, Holidays and Sundays (inclusive of all burden, per individual) | Hour |
Subcontractors
Provide percent markup of subcontractor(s) for this project. If work is all self-performed, leave the space blank or put a zero cost ("$0.00). 0%
Signatory Date
Printed Name Title
&G &G
Divisions Form, V1.2 Bayles, February 2024
Sheet2 image1.jpeg image2.jpeg