Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-128CW.xls
XLS spreadsheet 33 KB Posted
- Solicitation number
- 26-B-128CW
- Issued by
- Volusia County, Florida
About this file
Exhibit B - Prime-Sub Form for Contractors 26-B-128CW
This is a Prime-Sub Form document for contractors responding to the Seaview Vehicular Beach Access Ramp Reconstruction Project in Daytona Beach, Florida. The form provides a standardized template for prime contractors to identify and disclose their subcontractors, including the subcontractor's name, license number, classification, scope of work, and estimated contract value. The document establishes the framework for identifying which portions of work will be performed by prime contractors versus subcontractors, requiring clear delineation of responsibilities and financial allocations among all parties involved in the project. This form is a mandatory submission requirement for bidders and ensures transparency in the contractor team structure for the reconstruction project that will restore vehicular and pedestrian beach access through installation of composite sheet pile seawall panels, concrete cap, reinforced concrete vehicular ramp, curbing, pedestrian sidewalk, and site restoration.
The Prime-Sub Form serves as a disclosure and compliance document rather than a pricing or funding specification document. It does not contain specific pricing terms, contract amounts, funding sources, or set-asides. The form functions as an administrative tool to ensure that all contractors and subcontractors involved in the project are properly identified, licensed, and their respective scopes of work are clearly defined prior to contract award. Bidders must complete this form as part of their proposal submission to demonstrate their understanding of project requirements and their subcontracting plan.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2097 | ITB No. 26-B-128CW | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on 10. Pricing Table
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each discipline listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
File details come from the government source that posted it. Updated .