EXHIBIT B_Performance Requirements Summary.pdf

PDF 69 KB Posted

Attached to
Aqueous Film Forming Foam (AFFF) Support MATOC- Draft Solicitation
Solicitation number
W912DY23R0001
Issued by

About this file

This document contains a performance requirements summary for a multiple award task order contract and details of a related draft solicitation. The performance requirements summary outlines key contract and task order level objectives including quality of product or service, project management, and safety. Standards, acceptance criteria, and monitoring methods are defined for each objective along with potential incentives and disincentives. The draft solicitation is being issued by the U.S. Army Corps of Engineers Engineering Support Center Huntsville to procure services for removing, transporting, and disposing of Aqueous Film Forming Foam and other firefighting foams containing perflouroalkyl substances. Work will include removing or modifying foam and refilling storage tanks with a fluorine-free alternative based on a military specification provided in task orders. Questions regarding the draft solicitation can be submitted to the listed email address.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 2

Performance Requirements Summary

Contract Level Objectives Performance Standard Acceptance Criteria Measurement/

Monitoring Method Incentive/Disincentives For Meeting or Not Meeting the Acceptable Quality Level

Quality of Product or Service Client satisfaction

Client satisfaction and quality

80% of comments express overall satisfaction

Feedback may be obtained via CEHNC customer satisfaction survey

A Contractor not receiving satisfactory appraisals may be in danger of not having its option period exercised, adverse past performance report

Quality Performance Over All Task Orders Awarded

Quality performance IAW contract PWS and Task order PWS.

80% of all final deliverables received are accepted within 2 submissions

Feedback may be obtained via CEHNC customer satisfaction survey, COR records

A Contractor not receiving satisfactory appraisals may be in danger of not having its option period exercised, adverse past performance report

Project Management Key Personnel Management of Key

Personnel Contractor submits 100% of all key personnel changes to the KO for approval before changes made at the Contract and/or Task Order level. Key personnel are not routinely changed (more than 2 times) on one or more projects (or more than 3 times for key personnel overseeing base contract requirements over the life of the contract.

COR Surveillance The Contractor may be in danger of not having its option period exercised, adverse past performance report

Task Order Level – The performance requirements in this summary will be included in every task order. Other performance requirements may be included with the task order as appropriate for the particular project.

Desired Outcomes

Required Services Performance Standards

Monitoring Method Incentive/Disincentives For Meeting or Not Meeting the Acceptable Quality Level

Quality of Product or Service Safety Maintain high safety standards Zero Class A Safety violations where the Contractor is determined at fault.

Submission of accident reports, adverse safety inspection reports, and similar documents.

Issuance of a cure notice and possible termination of task order or contract for continuous or uncorrected safety violations.

Adverse past performance reports. The Contractor may be in danger of not having its option period exercised, adverse past performance report

Performance Compliance with PWS and referenced applicable regulations

No more than 5 CARs received by the Contractor within a given task order

COR Submission of CARs, COR report of failure to delivery acceptable product or service in accordance with Performance-Based Milestones/Objectives.

Issuance of a cure notice and possible termination of task order or contract for continuous or uncorrected performance deficiencies, or for failure to complete Performance-Based Milestones/Objectives. Adverse past performance reports. The Contractor may be in danger of not having its option period exercised, adverse past performance report