Exhibit_B_-_Fee_Proposal_Workbook.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Advanced Metering Infrastructure (AMI) System and Installation Services
Solicitation number
2026-RFP-0143
Issued by
Los Angeles County, California

About this file

This is a Fee Proposal Workbook for the City of Pasadena Water and Power's Advanced Metering Infrastructure (AMI) System and Installation Services RFP. The workbook serves as the pricing template for proposers to submit detailed cost estimates across three primary components: SaaS AMI FAN (Frequency Access Network), Water Metering, and Installation Services. The SaaS AMI FAN component requests pricing for infrastructure materials including collectors/routers, repeaters, network installation, and handheld programming devices, as well as 38,174 water endpoints and electric meters across multiple configurations (1S through 16S ratings totaling approximately 68,090 meters), along with associated consumables such as meter locking rings and seals. The Water Metering component requests pricing for various lid types, AMI-ready meters ranging from 3/4 inch to 8 inch sizes (totaling approximately 26,703 units), AMI retrofit registers across multiple sizes, and remote disconnect metering devices. Installation Services component includes pricing for electric meter replacements across all configurations, water meter replacements and retrofits, and price adders for GPS coordinate collection, service line material identification, lid replacement, and box replacement in varying ground conditions. Proposers are instructed to populate quantity, unit price, extended price, annual escalation rates, model names/numbers, lead times, and comments for each line item.

The workbook establishes that extended prices for professional services including project management, systems integration, training, and travel and expenses must be provided as fixed fees inclusive of all design, oversight, and quality assurance activities, while travel and expenses are to be given as not-to-exceed limits. Ongoing fees must be quoted as the full annual cost of service, and annual escalation rates must be provided for both capital and ongoing line items, with notation if pricing is held for specific periods or tied to an index. Proposers are responsible for verification of accuracy of all calculations and may add line items to accurately reflect their proposals without expanding the scope beyond RFP requirements. The workbook includes a Summary Pricing worksheet that consolidates total upfront capital costs and annual operating and maintenance (O&M) costs for each component. All pricing must be representative of requirements marked as "Current Base" or "Partially Comply" by proposers, and purchase of items is noted as tentative based on the anticipated project schedule, with Pasadena Water and Power reserving the right to modify timeline and outlay at its discretion.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Pasadena Water and Power
Fee Proposal
Instructions

The utility will not be held responsible for any adverse scoring and evaluation that may result from a failure to follow these instruction.

Proposer shall populate the following columns accordingly:

• *Line Item--note that certain item information is pre-populated; however, Proposers can add (but not remove) Items/Services accordingly

• *Quantity--number of items, unless otherwise noted

• *Unit Price

• *Extended Price--this column is set to calculate automatically; however, Proposers are responsible for validation of accuracy

• *Annual Escalation--annual escalation rates shoule be given for both capital and ongoing line items; if pricing is held for some number of years or tied to an index, it should be noted as such

• *Model Name/Number--the product line or part number being provided

• *Lead Time (Weeks)--number of weeks anticipated between order and delivery

• *Comments--provide clarification/explanation, according to the additional instructions given; Proposers shall also note item make/model and/or lead times, if specified

Ongoing fees should be given as the full cost of a year of service.

Purchase of items identified in this workbook is tentative based on the anticipated project schedule, and the utility reserves the right to change the timeline and outlay for orders at its sole discretion.

Line items are given to Proposers as a convenience. Proposers are encouraged to add line items as necessary to accurately reflect their proposals. These additions should not serve as a way to increase scope beyond what is specified in the RFP, but rather to provide additional subdivision or clarity to the items requested as indicated within the Requirements for this project. Prices given must be representative of those requirements marked as "Current Base" or "Partially Comply" by Proposer(s).

Extended prices for Professional Services are to be given as a fixed fee, inclusive of all design, oversight, quality assurance, or other activities to be performed.

Travel & Expenses are to be given as a not-to-exceed limit.

Summary capital and O&M costs will be noted in the 'Summary Pricing' worksheet. Proposers are responsible for verification of accuracy.

Items are subject to the terms of the RFP.

Summary Pricing

Pasadena Water and Power
Fee Proposal
Summary Pricing

Component Upfront Operating Total

SaaS AMI FAN$ - 0$ - 0$ - 0
Water Metering$ - 0$ - 0
Installation Services$ - 0$ - 0

SaaS AMI FAN

ComponentCommodityCapital or OngoingTypeCategoryLine ItemQuantityUnit PriceExtended PriceAnnual EscalationModel Name/NumberLead Time (Weeks)Comments
SaaS AMI FANAllCapitalMaterials and SuppliesAMI InfrastructureCollectors/Routers$ - 0
SaaS AMI FANAllCapitalMaterials and SuppliesAMI InfrastructureRepeaters$ - 0
SaaS AMI FANAllCapitalInstallationAMI InfrastructureNetwork Installation$ - 0N/AN/A
SaaS AMI FANAllCapitalMaterials and SuppliesAMI InfrastructureHandheld Programming Device10$ - 0
SaaS AMI FANWaterCapitalMaterials and SuppliesEndpointsWater Endpoints38174$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters1S1076$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters2S54021$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters3S271$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters45S277$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters4S0$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters9S1373$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters12S9082$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesMeters16S2991$ - 0
SaaS AMI FANElectricCapitalMaterials and SuppliesConsumablesInner-Tite Flex-Tite Ultimate AMI Jointed Meter Locking Ring (Green, with Level I Agby Locks for Self-Contained Meters)67441$ - 0Inner-Tite Flex-Tite Ultimate AMI Jointed Meter Locking Ring (Green, with Level I Agby Locks for Self-Contained Meters)
SaaS AMI FANElectricCapitalMaterials and SuppliesConsumablesInner-Tite Flex-Tite Ultimate AMI Jointed Meter Locking Ring (Blue, with Level II Agby Locks for Instrument-Rated Meters)1650$ - 0Inner-Tite Flex-Tite Ultimate AMI Jointed Meter Locking Ring (Blue, with Level II Agby Locks for Instrument-Rated Meters)
SaaS AMI FANElectricCapitalMaterials and SuppliesConsumablesInner-Tite Clearseal Meter Seal (Blue)69091$ - 0Inner-Tite Clearseal Meter Seal (Blue)
SaaS AMI FANAllCapitalSoftwareSaaS SetupAMI Headend1$ - 0N/AN/A
SaaS AMI FANAllCapitalProfessional ServicesAMI ServicesProject Management1$ - 0N/AN/A
SaaS AMI FANAllCapitalProfessional ServicesAMI ServicesSystems Integration Services1$ - 0N/AN/A
SaaS AMI FANAllCapitalProfessional ServicesAMI ServicesTraining1$ - 0N/AN/A
SaaS AMI FANAllCapitalProfessional ServicesAMI ServicesTravel & Expenses1$ - 0N/AN/A
SaaS AMI FANAllAnnual/OngoingOther ServicesAMI ServicesBackhaul$ - 0N/AN/A
SaaS AMI FANAllAnnual/OngoingOther ServicesAMI ServicesThird-Party Network Infrastructure Site Leasing$ - 0N/AN/A
SaaS AMI FANAllAnnual/OngoingOther ServicesAMI ServicesNetwork Maintenance$ - 0N/AN/A
SaaS AMI FANAllAnnual/OngoingSoftwareAMI ServicesIntegrations Maintenance$ - 0N/AN/A
SaaS AMI FANAllAnnual/OngoingSoftwareSaaS RenewalAMI Headend$ - 0N/AN/A
SaaS AMI FANWaterCapitalOptional ItemsOther DevicesWater Quality Sensor1$ - 0
SaaS AMI FANWaterCapitalOptional ItemsOther DevicesPressure Sensor1$ - 0
SaaS AMI FANOtherCapitalOptional ItemsOther DevicesSmart Streetlighting Device1$ - 0
SaaS AMI FANOtherCapitalOptional ItemsOther DevicesIoT Gateways1$ - 0
SaaS AMI FANAllCapitalOptional ItemsOther DevicesAcoustic Leak Monitoring Sensor1$ - 0
SaaS AMI FANAllCapitalOptional ItemsOther DevicesDrive-By Back-Up Reading Equipment1$ - 0
SaaS AMI FANAllAnnual/OngoingOptional ItemsAMI ServicesNaaS/Managed Services$ - 0N/AN/A
Total Capital$ - 0

Water Metering

ComponentCommodityCapital or OngoingTypeCategoryLine ItemQuantityUnit PriceExtended PriceAnnual EscalationModel Name/NumberLead Time (Weeks)Comments
Water MeteringWaterCapitalMaterials and SuppliesLids37-A18001$ - 0
Water MeteringWaterCapitalMaterials and SuppliesLidsStandard 651704$ - 0
Water MeteringWaterCapitalMaterials and SuppliesLidsCollar3311$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters3/4"15746$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters1”7619$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters1.5”1632$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters2”1353$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters3”181$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters4”113$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters6”48$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI-Ready Meters8”11$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers3/4"5539$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers1”4450$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers1.5”580$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers2”460$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers3”118$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers4”115$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers6”17$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers8”3$ - 0
Water MeteringWaterCapitalMaterials and SuppliesAMI Retrofit Registers10"1$ - 0
Water MeteringWaterCapitalMaterials and SuppliesRemote Disconnect Metering5/8 X 3/41$ - 0
Water MeteringWaterCapitalMaterials and SuppliesRemote Disconnect Metering3/4"1$ - 0
Water MeteringWaterCapitalMaterials and SuppliesRemote Disconnect MeteringInline Valve Only1$ - 0
Total Capital$ - 0

Water Metering (BABA-Compliant)

ComponentCommodityCapital or OngoingTypeCategoryLine ItemQuantityUnit PriceExtended PriceAnnual EscalationModel Name/NumberLead Time (Weeks)Comments
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesLids37-A18001$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesLidsStandard 651704$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesLidsCollar3311$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters3/4"15746$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters1”7619$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters1.5”1632$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters2”1353$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters3”181$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters4”113$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters6”48$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI-Ready Meters8”11$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers3/4"5539$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers1”4450$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers1.5”580$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers2”460$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers3”118$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers4”115$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers6”17$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers8”3$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesAMI Retrofit Registers10"1$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesRemote Disconnect Metering5/8 X 3/41$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesRemote Disconnect Metering3/4"1$ - 0
Water Metering (BABA-Compliant)WaterCapitalMaterials and SuppliesRemote Disconnect MeteringInline Valve Only1$ - 0
Total Capital$ - 0

Sheet2 Integration Author: Author:

Not sure if this is the appropriate place to put Integration Categories?Support export/import ability to Asset Framework and MilsoftMove to Integration discussion
IntegrationSupport meter to distribution phase identificationMove to Integration discussion. Identify hardware requirements for the phase identification

Sheet1

Current Base
Future Base Release
Modification
Third Party System
Customization
Not Provided

Installation Services

ComponentCommodityCapital or OngoingTypeCategoryLine ItemQuantityUnit PriceExtended PriceAnnual EscalationComments
Installation ServicesAllCapitalProfessional ServicesInstallation ServicesProject Management$ - 0
Installation ServicesAllCapitalProfessional ServicesInstallation ServicesCall Center$ - 0
Installation ServicesAllCapitalProfessional ServicesInstallation ServicesMobilization$ - 0
Installation ServicesAllCapitalProfessional ServicesInstallation ServicesFlat File Exchange Set-Up$ - 0
Installation ServicesAllCapitalProfessional ServicesInstallation ServicesTravel and Expenses$ - 0
Installation ServicesAllCapitalOther ServicesBondingBonds$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements1S1076$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements2S54021$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements3S271$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements45S277$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements4S0$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements9S1373$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements12S9082$ - 0
Installation ServicesElectricCapitalInstallationElectric Meter Replacements16S2991$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements3/4"15746$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements1”7619$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements1.5”1632$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements2”1353$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements3”181$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements4”113$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements6”48$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Replacements8”11$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits3/4"5539$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits1”4450$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits1.5”580$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits2”460$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits3”118$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits4”115$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits6”17$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits8”3$ - 0
Installation ServicesWaterCapitalInstallationWater Meter Retrofits10"1$ - 0
Installation ServicesAllCapitalInstallationPrice AddersGPS Coordinate Collection107077$ - 0
Installation ServicesAllCapitalInstallationPrice AddersService Line Material Identification37986$ - 0
Installation ServicesWaterCapitalInstallationPrice AddersLid Replacement24023$ - 0
Installation ServicesWaterCapitalInstallationPrice AddersBox Replacement (in Concrete, Asphalt, Pavers, or Similar)1$ - 0
Installation ServicesWaterCapitalInstallationPrice AddersBox Replacement (in Dirt, Gravel, Landscaping, Grass, Area with Tree Roots, or Similar)1$ - 0
Installation ServicesWaterCapitalInstallationPrice AddersAdditional Services (T&M Rate)1$ - 0
Total Capital$ - 0