This is a Scope of Work document for the Colorado Northwestern Community College (CNCC) Johnson Building Storefront and Entrance Replacement project, a state contract opportunity in Colorado. The scope requires a complete storefront replacement including demolition of existing storefront framing, glazing, and entrance doors; installation of thermally broken commercial aluminum storefront systems from manufacturers such as Kawneer, YKK AP, EFCO, Tubelite, or Oldcastle; and installation of entrance storefront assemblies with fixed storefront assemblies meeting maximum U-Factor of 0.34 and SHGC of 0.38, and entrance assemblies meeting maximum U-Factor of 0.63 and SHGC of 0.34. The project also requires heavy-duty door hardware including closers, thresholds, weatherstripping, panic hardware, and locking hardware compatible with the owner's key system, along with complete electronic access control systems including electronic locks, readers, door contacts, request-to-exit devices, controllers, power supplies, battery backup, wiring, programming, testing, and commissioning. The contractor must match the existing Johnson Building main entrance storefront frame color and conduct a mandatory site visit to verify all existing conditions and dimensions prior to fabrication, with no additional compensation granted for conditions that could have been identified during pre-bid inspection.

The contract requires comprehensive preconstruction services including field verification, coordination, shop drawings, and scheduling, with all dimensions verified by the contractor prior to fabrication. Submittals must include shop drawings, product data, hardware schedules, access control information, color samples, glazing performance data, and warranties. The contractor shall provide a one-year workmanship warranty plus manufacturer warranties for all storefront, glazing, hardware, and access control equipment. Closeout deliverables include warranty documents, maintenance information, final shop drawings, keying schedules, record drawings, and owner training documentation. The scope notes that CNCC currently uses an older, non-cloud-based version of Access IT and does not plan to switch, which bidders must accommodate in their access control system design and implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CNCC Johnson Building Storefront and Entrance Replacement

Exhibit B – Scope of Work

Project Scope The Contractor shall furnish all labor, materials, supervision, equipment, tools, transportation, disposal, access equipment, and incidentals required to provide a complete storefront replacement project at the CNCC Johnson Building.

Preconstruction Services Field verification of dimensions and existing conditions; coordination of access and work sequencing; shop drawings; Owner coordination; procurement and scheduling.

Demolition Removal of existing storefront framing, glazing, entrance door and related components;

protection of adjacent finishes and occupied areas.

Disposal Removal and legal disposal of demolished materials and site housekeeping.

Storefront Systems Provide thermally broken commercial aluminum storefront systems. Basis of design:

Kawneer, YKK AP, EFCO, Tubelite, Oldcastle, or approved equal.

Fixed Storefront Assembly Maximum U-Factor 0.34 and SHGC 0.38. Provide insulated glazing units; tempered glazing where required.

Entrance Storefront Assembly Maximum U-Factor 0.63 and SHGC 0.34. Provide tempered safety glass storefront door.

Door Hardware Heavy-duty closer, threshold, weatherstripping, panic hardware, locking hardware compatible with Owner key system, and all hardware required for complete operation.

Electronic Access Control Provide complete electronic access control including electronic lock, reader, door contact, request-to-exit device, controller, power supply, battery backup, wiring, programming, testing and commissioning. Panic hardware with access control required. CNCC

CURRENTLY USES THE OLDER VERSION OF ACCESS IT THAT IS NOT CLOUD-BASED,

AND DOES NOT PLAN TO SWITCH.

Finish Requirements Match existing Johnson Building main entrance storefront frame color.

Site Visit and Existing Conditions Bidders shall conduct a site visit and include all work reasonably inferable from visible existing conditions. No additional compensation will be granted for conditions that could have been identified during pre-bid inspection.

Field Verification All dimensions are V.I.F. Contractor shall verify all dimensions prior to fabrication.

Submittals Shop drawings, product data, hardware schedule, access control information, color samples, glazing performance data, warranties.

Warranties One-year workmanship warranty plus manufacturer warranties for storefront, glazing, hardware and access control equipment.

Closeout Warranty documents, maintenance information, final shop drawings, keying schedule, record drawings and owner training documentation.

Project Scope
Preconstruction Services
Demolition
Disposal
Storefront Systems
Fixed Storefront Assembly
Entrance Storefront Assembly
Door Hardware
Electronic Access Control
Finish Requirements
Site Visit and Existing Conditions
Field Verification
Submittals
Warranties
Closeout