Exhibit B_CDRLs.pdf

PDF 2 MB Posted

Attached to
TR-302D and 355 Transducers
Solicitation number
N6660425R0468
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) consisting of multiple pages detailing data submission requirements for a naval transducer contract. The CDRL covers various data items related to TR-355 Transducers, including meeting agendas, minutes, production reports, failure summaries, engineering change proposals, test procedures, and technical reports. Each data item has specific submission guidelines, such as draft due dates, government review timelines, and distribution instructions.

The contract opportunity involves manufacturing TR-302D and TR-355 transducers for the Naval Undersea Warfare Center, Division Newport (NUWCDIVNPT), with a build-to-performance specification approach. Contractors must document, manufacture, test, package, and deliver transducers meeting specific performance requirements. All submissions are subject to strict export control regulations, with potential severe criminal penalties for violations. The documents consistently indicate that all days are business days, and each data item requires specific formatting, review, and distribution protocols.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 29 of 29

DD FORM 1423

CONTRACT DATA REQUIREMENTS LIST ADDENDUM

PR TBD

CDRL A005 and B005 BLOCK 16 ADDENDUM

EVENT TO DELIVER BLOCK 12

(Date of First Submission)

BLOCK 8

(Approval Code)

BLOCK 13

(Date of Subsequent

Submission)

PCR

TOP LEVEL DRAWING

(Native, .pdf, and hardcopy printed from .pdf)

15 DAYS PRIOR TO PCR

(If PCR and FCR combined, submit top level drawing for Government review prior to complete draft development and submittal)

GOVERNMENT WILL

REVIEW WITHIN 5 DAYS

10 DARC

FCR

DRAFT COPY OF COMPLETE

DRAWING PACKAGE

(Native, .pdf, hardcopy, and indentured and numerical lists (in

.xlsx only))

20 DAYS PRIOR TO FCR

GOVERNMENT WILL

REVIEW WITHIN 10 DAYS

10 DARC

FA-PCA

COMPLETE DRAWING

PACKAGE

(.pdf and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO FA-

PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FA-PCA

20 DARC

FCA/PCA

COMPLETE DRAWING

PACKAGE

(Native, .pdf, and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO

FCA/PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FCA/PCA

20 DARC

(after all discrepancies resolved, Govt. will provide revision block information)

File details come from the government source that posted it. Updated .