Exhibit B_CDRLs.pdf
PDF 2 MB Posted
- Attached to
- TR-302D and 355 Transducers
- Solicitation number
- N6660425R0468
About this file
This document is a Contract Data Requirements List (CDRL) consisting of multiple pages detailing data submission requirements for a naval transducer contract. The CDRL covers various data items related to TR-355 Transducers, including meeting agendas, minutes, production reports, failure summaries, engineering change proposals, test procedures, and technical reports. Each data item has specific submission guidelines, such as draft due dates, government review timelines, and distribution instructions.
The contract opportunity involves manufacturing TR-302D and TR-355 transducers for the Naval Undersea Warfare Center, Division Newport (NUWCDIVNPT), with a build-to-performance specification approach. Contractors must document, manufacture, test, package, and deliver transducers meeting specific performance requirements. All submissions are subject to strict export control regulations, with potential severe criminal penalties for violations. The documents consistently indicate that all days are business days, and each data item requires specific formatting, review, and distribution protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6660425R04680002.pdf | ||
| Solicitation Amendment N6660425R04680001.pdf | ||
| Attachment 3- DD Form 254 .pdf | ||
| Attachment 2- PBP Milestones .pdf | ||
| Solicitation - N6660425R0468.pdf | ||
| Attachment 1- Pricing Tables .docx | DOCX document | |
| Exhibit A_CDRLs .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 29 of 29
DD FORM 1423
CONTRACT DATA REQUIREMENTS LIST ADDENDUM
PR TBD
CDRL A005 and B005 BLOCK 16 ADDENDUM
EVENT TO DELIVER BLOCK 12
(Date of First Submission)
BLOCK 8
(Approval Code)
BLOCK 13
(Date of Subsequent
Submission)
PCR
TOP LEVEL DRAWING
(Native, .pdf, and hardcopy printed from .pdf)
15 DAYS PRIOR TO PCR
(If PCR and FCR combined, submit top level drawing for Government review prior to complete draft development and submittal)
GOVERNMENT WILL
REVIEW WITHIN 5 DAYS
10 DARC
FCR
DRAFT COPY OF COMPLETE
DRAWING PACKAGE
(Native, .pdf, hardcopy, and indentured and numerical lists (in
.xlsx only))
20 DAYS PRIOR TO FCR
GOVERNMENT WILL
REVIEW WITHIN 10 DAYS
10 DARC
FA-PCA
COMPLETE DRAWING
PACKAGE
(.pdf and indentured and numerical lists (in .xlsx only))
10 DAYS PRIOR TO FA-
PCA
GOVERNMENT TO
PROVIDE COMMENTS AT
FA-PCA
20 DARC
FCA/PCA
COMPLETE DRAWING
PACKAGE
(Native, .pdf, and indentured and numerical lists (in .xlsx only))
10 DAYS PRIOR TO
FCA/PCA
GOVERNMENT TO
PROVIDE COMMENTS AT
FCA/PCA
20 DARC
(after all discrepancies resolved, Govt. will provide revision block information)
File details come from the government source that posted it. Updated .