Exhibit A3 - Figure 2 MWD1__MWD7 Work Area.pdf
PDF 1 MB Posted
- Attached to
- MW-D1 Replacement
- Solicitation number
- ISD-366011-RO
About this file
This document is a geographic work area detail map for the MW-D1 Replacement project at Fermi National Accelerator Laboratory. The aerial image shows multiple monitoring well locations (MW-S1, MW-D1, MW-D7 proposed, MW-S4, MW-D6, MW-S3, MW-6B, MW-D4, MW-S5) positioned across a dry, dusty terrain with visible dirt roads and sparse vegetation. The map is dated 7/25/2023, created by Maxar, Microsoft, and EK, and includes a scale of 1:1,000 with distance measurements in miles and kilometers. The map specifically highlights the proposed MW-D7 location in green and shows the surrounding monitoring well sites in relation to Holter Road, providing a detailed spatial representation of the project's work area.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 2: MW-D1 and MW-D7 Work Area Detail
Maxar, Microsoft, EK
7/25/2023 0 0.01 0.030.01 mi
0 0.03 0.050.01 km
1:1,000
Fermi National Accelerator Laboratory
MW-1S
MW-S4
MW-S3
MW-D4
MW-6B
MW-D6
MW-S1
MW-S5
tzei Oval tzei Callout
MW-D7 (PROPOSED)
tzei Callout
MW-D1
File details come from the government source that posted it. Updated .