Exhibit A Special Provisions and Specifications.docx
DOCX document 3 MB Posted
- Solicitation number
- S-73000-00014937
- Issued by
- Douglas County, Oregon
About this file
This document is an Exhibit A Special Provisions and Specifications file from the Oregon Department of Transportation (ODOT) for the ER 2025 I-5: SB MP 109.5 Serpentine Rockfall Gabion Wall Repairs Project. The project involves repairing and realigning a gabion wall damaged by rockfall near Milepost 109.5 southbound on Interstate 5, with work including removal and replacement of damaged gabion baskets, realigning displaced baskets, refilling baskets with approved material, temporarily relocating concrete barriers, and installing three new concrete barrier sections. The project will be conducted using the 2024 Oregon Standard Specifications for Construction, with the primary project contact being Randy Camp, Transportation & Operations Maintenance Manager, who can be reached at Randy.CAMP@odot.oregon.gov or (541) 580-2539.
The specifications emphasize strict environmental protection requirements, particularly regarding water quality and pollutant prevention. The contractor must submit and obtain approval for a Traffic Control Plan and Temporary Pedestrian Accessible Route Plan before commencing work. Notably, material from the rockfall cannot be used as gabion fill due to the presence of naturally occurring asbestos. The project requires careful handling of materials, with specific guidelines for erosion control, environmental protection, and traffic management during the construction process. The Agency will provide three concrete barrier sections to be installed at the project site, with the contractor responsible for coordinating delivery and installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample Contract~51.docx | DOCX document | |
| RFCQ Bid Results.xlsx | XLSX spreadsheet | |
| 00014937_Prequote_Signup.pdf | ||
| 00014937 Request for Competitive Quotes.docx | DOCX document | |
| ATT B FHWA Form 1273.pdf | ||
| 00014939 Bid Results.xlsx | XLSX spreadsheet | |
| ATT A Project Wage Rates.pdf | ||
| ATT C Contract Closeout Compliance Checklist.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ER 2025 I-5: SB MP 109.5 (SERPENTINE ROCKFALL) GABION WALL REPAIRS PROJECT
Exhibit A
SPECIAL PROVISONS & SPECIFICATIONS FOR
ER 2025 I-5: SB MP 109.5 (SERPENTINE ROCKFALL) GABION WALL REPAIRS PROJECT
SCOPE OF WORK TO BE DONE
The Work to be done under this Contract consists of supplying the materials, equipment, labor, and incidentals necessary to repair and realign the gabion wall damaged by rockfall near MP 109.5 SB along Interstate 5 (I-5). Perform additional and incidental work as noted in the Contract plans and specifications and as directed.
PROJECT INFORMATION
General information pertaining to this project may be obtained from the following Project Manager or approved representative:
Randy Camp, Transportation & Operations Maintenance Manager (TOMM) Email: Randy.CAMP@odot.oregon.gov Cell: (541) 580-2539
APPLICABLE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS
2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (Standard Specifications) include detailed technical specifications in Parts 00200 through 03000 inclusive (Technical Specifications) that apply to this ITB and the resulting Contract. Some sections of the Technical Specifications are identified and modified herein, Specifications. Sections of the Technical Specifications not modified remain applicable to the Contract according to their original terms. Unless they are identified herein, Specifications, sections of the Standard Specifications in Part 00100 (General Conditions) are not applicable to this Contract. Bidders can also access this information at the following Internet address:
2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION
Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used.
Where neither the Special Provisions nor the bid schedule indicate separate payment for the work to be completed under this Contract, perform the work as incidental for which no separate measurement or payment will be made.
Location of Work to be done. I-5: SB MP 109.5 gabion wall repairs. See Figure 1 (next page) for additional details.
Figure 1 – approximate location of Work to be done, Repair Area 1 and Repair Area 2. Field-verify repairs with the TOMM prior to commencement of Work activities. Match dimensions of the existing gabion baskets.
Work to be done includes, but is not limited to, removal and replacement of damaged gabion baskets and panels including appurtenances (spiral binders, clips, etc.) within the existing gabion wall per Section 00596A, realigning gabion baskets within the wall displaced by the rockfall, refilling gabion baskets within the wall with existing gabion fill material (not from rockfall), ensuring all gabion baskets within the wall repair areas are properly filled by supplementing basket fill with material meeting the requirements of 00390.11(b), temporarily relocating concrete barrier (anchored) to facilitate gabion basket repairs and realignment, and installing 3 sections of concrete barrier (anchored) furnished by the Agency. See Scope of Work to be done (Page 1) for additional details.
The Agency will deliver 3 sections of concrete barrier including hardware to be added to the south end of the concrete barrier (anchored) sitting on top of gabion wall Repair Area 1. Schedule delivery of the concrete barrier with the Project Manager or approved representative.
Use of material from the rockfall will not be allowed to be used as gabion fill material as it contains naturally occurring asbestos and should not be handled.
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications modified as follows:
Construction
00210.40 Mobilization – delete the last bullet of the bullet list. Obtaining and maintaining access to Doc Express® and using Doc Express® to submit documents will not be required on this project.
Payment
00210.90 Payment – delete the last sentence in this subsection.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications.
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.00 Scope - Add the following:
Provide work zone traffic control measures conforming to The Oregon Department of Transportation’s Temporary Traffic Control Handbook for Operations of Three Days OR Less, December 2011. Copies of this handbook can be accessed via the internet under “Publications” on the Traffic Engineering and Operations Section web site (Highway Division, Oregon Department of Transportation) at:
2011 ODOT TEMPORARY TRAFFIC CONTROL HANDBOOK (OTTCH)
00221.06 - Traffic Control Plan – Replace this subsection, except for the subsection number and title, with the following:
The Contractor must submit a Traffic Control Plan (TCP) and a Temporary Pedestrian Accessible Route Plan (TPAR) and obtain approval from the Oregon Department of Transportation Project Manager before work may commence on the Project.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications.
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
Comply with Section 00223 of the Standard Specifications.
SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES
Comply with Section 00224 of the Standard Specifications.
SECTION 00228 - TEMPORARY PEDESTRIAN AND BICYCLIST ROUTING
Comply with Section 00228 of the Standard Specifications.
SECTION 00280 - EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
Add the following subsection:
00290.30(a)(7) Water Quality:
Do not discharge water contaminated by pollutants including sediment, drilling fluids and waste, concrete, grout, or water contained within a work area isolation, into any waters of the State or U.S. or conveyances draining thereto until it has been treated using Materials such as those listed in 00280.15 or 00280.16 or by pumping to a vegetated upland location. Do not allow Project discharges to increase the concentration of any pollutant in the receiving water to a level that exceeds the limits prescribed by OAR 340‑041.
Do not use permanent stormwater quality treatment facilities to treat construction runoff unless prescribed by an ESCP approved under Section 00280.
If construction discharge water is released using an outfall or diffuser port, do not exceed velocities more than 4 feet per second, and do not exceed an aperture size of 1 inch.
Implement containment measures adequate to prevent pollutants from entering waters of the State or U.S. Such pollutants include but are not limited to construction and demolition materials, waste spoils, fuel or petroleum products, detergents, silt, welding slag and grindings, concrete sawcutting by-products and sandblasting abrasives.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Comply with Section 00310 of the Standard Specifications.
SECTION 00390 – RIPRAP PROTECTION
Comply with Section 00390 of the Standard Specifications.
SECTION 00596A - MECHANICALLY STABILIZED EARTH RETAINING WALLS
Comply with Section 00596A of the Standard Specifications.
SECTION 00820 – CONCRETE BARRIER
Comply with Section 00820 of the Standard Specifications.
SECTION 02340 – ROCK GABION BASKETS
Comply with Section 02340 of the Standard Specifications.